Upload Button Icon Add office photos

Filter interviews by

SUN CONSTRUCTION Interview Questions and Answers

Updated 8 Feb 2022

SUN CONSTRUCTION Interview Experiences

Popular Designations

3 interviews found

Civil Site Engineer Interview Questions & Answers

user image Goutham sakthivel

posted on 29 Jan 2018

Interview Questionnaire 

4 Questions

  • Q1. They show me a drawing of residential buildings and ask some questions...I will answer the questions and some technical questions....
  • Q2. What you understand in these drawings?
  • Ans. 

    The question is asking about the understanding of drawings related to civil engineering projects.

    • The drawings may include architectural plans, structural plans, and site plans.

    • Understanding the drawings involves interpreting symbols, dimensions, and annotations.

    • Knowledge of different types of drawings like floor plans, elevations, sections, and details is important.

    • Ability to identify key elements like columns, beams, ...

  • Answered by AI
  • Q3. Mix design
  • Q4. Initial and final setting time
  • Ans. 

    Initial and final setting time are important properties of cement that determine its workability and strength.

    • Initial setting time is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.

    • Final setting time is the time taken for the cement paste to harden completely and attain its full strength.

    • Both setting times are influenced by factors like cement composition, water-cement r...

  • Answered by AI

Interview Preparation Tips

Round: Test
Experience: They conducted written tests based on civil engineering subjects...actually negative marks are available...the test was conducted out of 50...30 is the pass marks...

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Roles and responsibilities?
  • Q2. What is your current salary?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for freshers as for the experience person not that much.

Purchase Manager Interview Questions asked at other Companies

Q1. Again if you are coming with reference then high probability of getting selected irrespective of what you have done in Interview. Some basic technical questions related to Job description. Not much technical as they dont have strong technic... read more
View answer (4)

I applied via Newspaper Ad and was interviewed in Aug 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Explain about yourself, present salary, expected salary, notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Guys pls. dont join this co. Once joined, will be difficult to tolorate temperament of Tania Nandy. Every moment you will be insulted/ humiliated. No job security. No future. Just a small co. Shows up like big corporate.

Accounts Head Interview Questions asked at other Companies

Q1. Are you well versed with Consolidation of annuàl accounts
View answer (5)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Some building material questions

Round 3 - HR 

(1 Question)

  • Q1. Tell me about you

Interview Preparation Tips

Interview preparation tips for other job seekers - hire

SUN CONSTRUCTION Interview FAQs

How many rounds are there in SUN CONSTRUCTION interview?
SUN CONSTRUCTION interview process usually has 1 rounds. The most common rounds in the SUN CONSTRUCTION interview process are One-on-one Round.
What are the top questions asked in SUN CONSTRUCTION interview?

Some of the top questions asked at the SUN CONSTRUCTION interview -

  1. What you understand in these drawin...read more
  2. Initial and final setting t...read more
  3. They show me a drawing of residential buildings and ask some questions...I will...read more

Tell us how to improve this page.

SUN CONSTRUCTION Reviews and Ratings

based on 21 reviews

3.1/5

Rating in categories

2.5

Skill development

2.5

Work-life balance

2.6

Salary

2.1

Job security

2.2

Company culture

2.2

Promotions

2.2

Work satisfaction

Explore 21 Reviews and Ratings
Civil Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Finance Head
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Supervisor
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager Civil
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare SUN CONSTRUCTION with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview