I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I use Primavera P6 for planning. I am highly proficient in it.
I use Primavera P6 for planning purposes.
I have been using it for several years and have gained a high level of proficiency.
I am able to create and manage project schedules, track progress, and analyze data using the software.
I am also familiar with other planning software such as Microsoft Project and Excel.
I am always willing to learn new software and stay
A planning engineer is responsible for creating and managing project schedules, monitoring progress, and ensuring timely completion of the project.
Developing project schedules and timelines
Monitoring project progress and identifying potential delays
Collaborating with project managers and stakeholders to ensure timely completion
Preparing progress reports and presenting them to management
Identifying and mitigating projec...
Reports maintained on daily, weekly and monthly basis by Planning Engineer.
Daily progress report
Weekly status report
Monthly project report
Resource utilization report
Cost control report
Risk assessment report
Productivity of manpower varies by trade and project requirements.
Productivity is measured in units of work completed per unit of time.
Factors affecting productivity include skill level, experience, tools and equipment, and work environment.
Examples of productivity rates for trades include: electricians - 0.5-1.5 hours per outlet installed, carpenters - 100-200 sq ft of framing per day, plumbers - 2-4 fixtures installe...
Top trending discussions
I was interviewed in Sep 2023.
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Listing WBS in MSP
Making MSP model
I applied via Campus Placement and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.
Total Float is the amount of time an activity can be delayed without delaying the project completion date.
Free Float is the amount of time an activity can be delayed without delaying the ear...
I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.
Analyze project requirements to determine the quantity and type of materials needed
Create a detailed material list specifying the required quantities, specifications, and quality standards
Obtain quotes from multiple suppliers...
Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.
Modular floor cycle involves prefabricating floor sections off-site
These sections are then transported to the construction site for assembly
This method can help speed up construction timelines and improve quality control
I faced challenges in achieving the desired slab cycle due to material delays and manpower shortages.
Material delays caused disruptions in the construction schedule.
Manpower shortages led to inefficiencies in the work progress.
Implemented better coordination with suppliers to ensure timely delivery of materials.
Hired additional workers to address the manpower shortage.
Adjusted the project timeline to accommodate unexpe
I have worked at two organizations in the past with an average job tenure of 3 years.
Worked at ABC Company for 4 years as a Planning Engineer
Joined XYZ Corporation as a Senior Planning Engineer and worked for 2 years
Experience includes project scheduling, resource allocation, and budget management
Seeking new challenges, growth opportunities, and a better work-life balance.
Desire for career advancement and professional development
Seeking a more challenging and rewarding role
Looking for a better work-life balance
Want to work in a more innovative or dynamic environment
Seeking better compensation or benefits
Company restructuring or changes in management
Negotiable based on experience and benefits package
Salary expectations are flexible and dependent on the overall compensation package
Open to discussing salary range during the interview process
Seeking competitive compensation aligned with industry standards
I was interviewed in Sep 2023.
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Listing WBS in MSP
Making MSP model
I applied via Campus Placement and was interviewed before Jan 2021. There were 4 interview rounds.
Some of the top questions asked at the Sumadhura Infracon Planning Engineer interview -
based on 1 review
Rating in categories
Senior Engineer
27
salaries
| ₹4.2 L/yr - ₹7.2 L/yr |
Civil Site Engineer
23
salaries
| ₹1.9 L/yr - ₹5 L/yr |
QS Engineer
22
salaries
| ₹1.5 L/yr - ₹6.6 L/yr |
Junior Engineer
20
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
QA QC Engineer
20
salaries
| ₹1.8 L/yr - ₹9.1 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties