Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
Yes, I am fit for the post of Quality Engineer.
I have a strong background in quality engineering with experience in implementing quality control processes.
I am skilled in conducting quality audits and inspections to identify areas for improvement.
I have expertise in using quality tools and methodologies such as Six Sigma and Lean principles.
I have successfully led cross-functional teams to resolve quality issues and im...
I am a detail-oriented Quality Engineer with a strong background in ensuring product quality and process improvement.
Experienced in conducting quality audits and inspections
Proficient in using statistical analysis tools to identify and resolve quality issues
Skilled in developing and implementing quality control procedures
Strong problem-solving and analytical skills
Excellent communication and teamwork abilities
I tend to procrastinate and sometimes struggle with time management.
Procrastination
Time management
Difficulty prioritizing tasks
Occasional lack of focus
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 26 May 2020
I applied via Walk-in and was interviewed in Apr 2020. There were 3 interview rounds.
The 7 QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
As a Quality Engineer in my previous company, I was responsible for ensuring product quality, conducting audits, and implementing quality control processes.
Conducted product quality inspections and audits
Implemented quality control processes to improve product quality
Analyzed data to identify areas for improvement
Collaborated with cross-functional teams to address quality issues
Ensured compliance with industry standard
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a proactive process that involves planning, designing, and executing tests to prevent defects from occurring.
QC is a reactive process that involves identifying defects through testing and then fixing them.
QA is focused on the entire software development life cycle while QC is focused on the testing phase.
Examples of QA activities ...
based on 2 interviews
Interview experience
based on 52 reviews
Rating in categories
Assistant Engineer
2.7k
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
1.8k
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
927
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
411
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
352
salaries
| ₹0 L/yr - ₹0 L/yr |
DENSO
MAHLE Behr India
Sanden Vikas
Valeo