Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures that each workstation has a similar amount of work to do
I appeared for an interview before Feb 2024.
There are various types of welding processes used in engineering, such as MIG, TIG, stick, and flux-cored welding.
MIG (Metal Inert Gas) welding uses a wire electrode and shielding gas to join metals together.
TIG (Tungsten Inert Gas) welding uses a non-consumable tungsten electrode and shielding gas for precise and clean welds.
Stick welding, also known as Shielded Metal Arc Welding (SMAW), uses a flux-coated electrode t...
Sheet metal manufacturing process involves cutting, bending, and assembling metal sheets to create various products.
Cutting: Using tools like shears, lasers, or plasma cutters to cut the metal sheets into desired shapes.
Bending: Utilizing press brakes to bend the metal sheets into specific angles and shapes.
Assembling: Joining the cut and bent metal pieces together through welding, riveting, or fastening methods.
Finish...
ECN stands for Engineering Change Notice and ECR stands for Engineering Change Request. They are used to document and implement changes in engineering designs.
ECN (Engineering Change Notice) is a document used to communicate changes in engineering designs to relevant stakeholders.
ECR (Engineering Change Request) is a formal proposal to make changes to an engineering design.
ECRs are typically submitted by engineers or p...
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
What kind of behavior for workers
Process actives are steps or tasks involved in completing a specific process.
Identify all the steps involved in the process
List the tasks in sequential order
Define the inputs and outputs of each step
Assign responsibilities for each task
Monitor progress and adjust as needed
I applied via LinkedIn and was interviewed in Sep 2021. There were 3 interview rounds.
based on 14 reviews
Rating in categories
Senior Engineer
507
salaries
| ₹2 L/yr - ₹8 L/yr |
Assistant Manager
293
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Executive
266
salaries
| ₹4 L/yr - ₹10 L/yr |
Quality Engineer
221
salaries
| ₹1.1 L/yr - ₹4.8 L/yr |
Senior Production Engineer
149
salaries
| ₹2.6 L/yr - ₹7 L/yr |
JBM Group
Subros
TVS Sundram Fasteners
Spark Minda