Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterling & Wilson Interview Questions, Process, and Tips

Updated 3 Mar 2025

Top Sterling & Wilson Interview Questions and Answers

View all 72 questions

Sterling & Wilson Interview Experiences

Popular Designations

65 interviews found

Interview Questionnaire 

8 Questions

  • Q1. What is transformer losses?
  • Ans. 

    Transformer losses refer to the energy dissipated in a transformer during its operation.

    • Transformer losses include copper losses and iron losses.

    • Copper losses occur due to the resistance of the transformer windings.

    • Iron losses, also known as core losses, occur due to hysteresis and eddy currents in the transformer core.

    • Copper losses can be minimized by using larger conductor sizes and reducing the resistance of winding...

  • Answered by AI
  • Q2. Why neutral is Grounded in star connected transformer?
  • Ans. 

    Neutral is grounded in star connected transformer for safety and to limit voltage rise.

    • Grounding neutral limits voltage rise in case of unbalanced loads.

    • It provides a path for fault current to flow, which helps in detecting and isolating faults.

    • It reduces the risk of electric shock to personnel and damage to equipment.

    • In some countries, it is a legal requirement to ground the neutral in electrical systems.

    • Example: In a...

  • Answered by AI
  • Q3. Difference between power and energy.
  • Ans. 

    Power is the rate at which energy is transferred, while energy is the ability to do work.

    • Power is measured in watts, while energy is measured in joules.

    • Power is the rate at which energy is used or transferred, while energy is the capacity to do work.

    • A light bulb may have a power rating of 60 watts, but the energy it consumes over time is measured in watt-hours.

    • Energy can exist in different forms, such as kinetic, poten...

  • Answered by AI
  • Q4. What is IGBT?
  • Ans. 

    IGBT stands for Insulated Gate Bipolar Transistor, a power semiconductor device used for switching and amplification of electrical power.

    • IGBT is a three-terminal device with a collector, emitter, and gate.

    • It combines the advantages of MOSFET and BJT transistors.

    • It is commonly used in high power applications such as motor drives, power supplies, and renewable energy systems.

    • IGBTs have low on-state voltage drop and high ...

  • Answered by AI
  • Q5. Explain the working of relay.
  • Ans. 

    Relay is an electrically operated switch that uses an electromagnet to mechanically open or close a circuit.

    • Relays are used to control high voltage or high current circuits with low voltage signals.

    • They are commonly used in industrial automation, automotive applications, and household appliances.

    • Relays can be classified into different types based on their construction and operation, such as electromagnetic relays, soli...

  • Answered by AI
  • Q6. How CT and PT are connected in circuit?
  • Ans. 

    CT and PT are connected in circuit to measure current and voltage respectively.

    • CT is connected in series with the load to measure current

    • PT is connected in parallel with the load to measure voltage

    • CT and PT are used together to measure power in a circuit

    • The ratio of CT and PT is important for accurate measurement

  • Answered by AI
  • Q7. Working principle of Solar PV module.
  • Ans. 

    Solar PV modules convert sunlight into electricity using photovoltaic effect.

    • Solar PV modules consist of multiple solar cells connected in series and parallel.

    • Each solar cell is made of semiconductor material, usually silicon.

    • When sunlight hits the solar cell, it excites the electrons in the semiconductor material, creating a flow of electricity.

    • The electricity generated by the solar cells is direct current (DC), which...

  • Answered by AI
  • Q8. What is the relation between line voltage and phase voltage in Star connection?
  • Ans. 

    In Star connection, line voltage is equal to the square root of 3 times phase voltage.

    • Line voltage is the voltage between any two line conductors in a three-phase system.

    • Phase voltage is the voltage between any line conductor and the neutral point in a three-phase system.

    • In a Star connection, all three phases are connected to a common neutral point.

    • The relationship between line voltage and phase voltage in Star connect...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was very good.
All the above questions handled by me very easily.

Skills evaluated in this interview

Top Sterling & Wilson Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. Why neutral is Grounded in star connected transformer?
View answer (2)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Pipe Fitter Interview Questions & Answers

user image Anonymous

posted on 3 Mar 2025

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Fast and quickly process

Pipe Fitter Interview Questions asked at other Companies

Q1. What is the formula of cut for 4 pieces of pipe and 90%?
View answer (2)
Sterling & Wilson Interview Questions and Answers for Freshers
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.

Top Sterling & Wilson Project Manager Interview Questions and Answers

Q1. What are the Pump head loss calculation parameters
View answer (1)

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)

Sterling & Wilson interview questions for popular designations

 Electrical Engineer

 (4)

 Project Manager

 (2)

 Graduate Engineer Trainee (Get)

 (2)

 Civil Site Engineer

 (2)

 Management Trainee

 (1)

 Engineer

 (1)

 Senior Engineer

 (1)

 Manager

 (1)

Interview Questions & Answers

user image Anonymous

posted on 22 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall experience is good in all process assigning a new employee.

Get interview-ready with Top Sterling & Wilson Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There were 3 interview rounds.

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Data Science Analyst interview:
  • Presentation Skills
  • Expression
  • Siebel configuration

Skills evaluated in this interview

Data Science Analyst Interview Questions asked at other Companies

Q1. How to analyse a problem : Suppose a pizza chain comes to you and tells you that certain of their outlets are performing poorly aftrr the pandemic. Where do you start with the problem and how do you approach
View answer (1)

Jobs at Sterling & Wilson

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.

Electrical GET Interview Questions asked at other Companies

Q1. Can you explain Ohm's Law and how it relates to electrical circuits? What is the difference between AC (Alternating Current) and DC (Direct Current)? Describe the difference between analog and digital signals. Give an example of each. How w... read more
View answer (1)

Civil Execution Engineer Interview Questions & Answers

user image Devki PRASAD PATEL

posted on 11 Jul 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Civil Execution Engineer Interview Questions asked at other Companies

Q1. How to check consumption of gypsum, Grade of SS, Deshuttering of Cantilever structure, lapping of different dia of steel, etc
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

Interview Preparation Tips

Interview preparation tips for other job seekers - Human Resources often take candidates for granted. It is essential to clarify all clauses before accepting any offers.

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 10 Jan 2025

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be thorough with the application of the techniques.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in Feb 2024. There was 1 interview round.

MEP Bim Coordinator Interview Questions asked at other Companies

Q1. how can support bim file in the construction site
View answer (1)
Contribute & help others!
anonymous
You can choose to be anonymous

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson interview?
Sterling & Wilson interview process usually has 1-2 rounds. The most common rounds in the Sterling & Wilson interview process are Technical, Resume Shortlist and HR.
How to prepare for Sterling & Wilson interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Design Engineering, Project Management, HVAC, Solar and AutoCAD.
What are the top questions asked in Sterling & Wilson interview?

Some of the top questions asked at the Sterling & Wilson interview -

  1. Why neutral is Grounded in star connected transform...read more
  2. What is safety ? What is factory act ? What is you working process in construct...read more
  3. What is the relation between line voltage and phase voltage in Star connecti...read more
How long is the Sterling & Wilson interview process?

The duration of Sterling & Wilson interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

Atharva Engineers And Industrial Projects

No Interviews

JOBS

Tata Technologies

No Jobs

REVIEWS

Sterling & Wilson

No Reviews

INTERVIEWS

Tata Technologies

100 top interview questions

SALARIES

Sterling & Wilson

INTERVIEWS

Raghava Constructions - India

No Interviews

Tell us how to improve this page.

Sterling & Wilson Interview Process

based on 50 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Havells Interview Questions
4.0
 • 209 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
View all

Sterling & Wilson Reviews and Ratings

based on 1.6k reviews

4.1/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.7

Salary

3.8

Job security

3.9

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 1.6k Reviews and Ratings
Compliance Manager

Thane,

Navi Mumbai

+1

10-15 Yrs

Not Disclosed

Company Secretary

Thane,

Navi Mumbai

+1

2-5 Yrs

Not Disclosed

Design Engineer PHE FF

Thane,

Navi Mumbai

+1

7-12 Yrs

Not Disclosed

Explore more jobs
Electrical Engineer
270 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Senior Engineer
245 salaries
unlock blur

₹3.1 L/yr - ₹9.1 L/yr

Project Engineer
201 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Assistant Manager
165 salaries
unlock blur

₹4.7 L/yr - ₹17 L/yr

Manager
137 salaries
unlock blur

₹7.3 L/yr - ₹23.6 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent