Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterling & Wilson Project Manager Interview Questions, Process, and Tips

Updated 29 Oct 2024

Top Sterling & Wilson Project Manager Interview Questions and Answers

View all 10 questions

Sterling & Wilson Project Manager Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is refrigeration cycle? Commissioning stages of Data center?
  • Ans. 

    The refrigeration cycle is a process that removes heat from a space and transfers it to the external environment.

    • The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.

    • The compressor compresses the refrigerant gas, raising its temperature and pressure.

    • The high-pressure refrigerant then flows to the condenser, where it releases heat to the surroundings and conden...

  • Answered by AI
  • Q2. What is chilled water system? Types of ac system?
  • Ans. 

    A chilled water system is a cooling system that uses chilled water to remove heat from a building or process.

    • Chilled water systems use water as a cooling medium.

    • They typically consist of a chiller, chilled water pumps, and a distribution system.

    • Chilled water is circulated through coils or heat exchangers to cool air or equipment.

    • Chilled water systems are commonly used in large commercial buildings, data centers, and in...

  • Answered by AI
  • Q3. Types of pumps? Types of compressor
  • Ans. 

    Types of pumps include centrifugal pumps, reciprocating pumps, and rotary pumps.

    • Centrifugal pumps use centrifugal force to move fluid through a system.

    • Reciprocating pumps use a piston or diaphragm to create pressure and move fluid.

    • Rotary pumps use rotating mechanisms to transfer fluid.

    • Other types of pumps include gear pumps, peristaltic pumps, and vane pumps.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about yourself.
Study the jd
Introduce yourself in a good way
Dont use extra pause during explanation.
Should be well dressed
Use the language in whic you are comfortable

Skills evaluated in this interview

Project Manager Interview Questions Asked at Other Companies

Q1. What is success & what is failure to you? How do you handle f ... read more
asked in HCLTech
Q2. How did you manage the software release and deployment
Q3. If you have 1 kg of cotton and 1 kg of iron which is heavier?
asked in Infosys
Q4. What is the difference between scrum master and product manager
Q5. 1. Fundamentals of estimation techniques. 2. Which all pm tools h ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Role and responsibility of Project Manager
  • Q2. Describe Launching of O.W. Girder

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Railway project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Questions on resource management

Round 2 - Case Study 

Senarios about work and attitue

Interview Preparation Tips

Interview preparation tips for other job seekers - be yourself
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. More on operational concerns

Interview Preparation Tips

Interview preparation tips for other job seekers - get your best in the beginning, later nothing happens
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Tendering department design department survey department questions are asked from project enginner

Interview Preparation Tips

Interview preparation tips for other job seekers - For engineer post questions are asked about survey department in core, then questions are asked about designing department, then about tendering department and when your department came like engg. They just minimise their questions
When questions are asked from 4 departments and you are only good in one department. Then your moral automatically came down
I had a question to all those project managers how could your 20+ years experience will be matched to 5 years experience of the candidates
And if you don’t want to select any candidate why you waste yours and candidate time . Just pick your referrals and finish the game.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Sector based questions, similar to job oriented
Round 3 - One-on-one 

(1 Question)

  • Q1. Like case studies, or situational task
Round 4 - HR 

(1 Question)

  • Q1. About personal and professional expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - show best professionalism in order to crack the interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Explain the project lifecycle
  • Ans. 

    The project lifecycle is the series of phases a project goes through from initiation to completion.

    • Initiation: Define project goals, scope, and stakeholders

    • Planning: Create a detailed project plan, schedule, and budget

    • Execution: Implement the project plan and deliver the project

    • Monitoring and Controlling: Track progress, manage changes, and ensure quality

    • Closing: Finalize all project activities and hand off deliverable

  • Answered by AI
  • Q2. What was your role and contribution to the project
  • Q3. What are the contents of model reviews
  • Ans. 

    Model reviews typically include checking for accuracy, completeness, consistency, and compliance with standards.

    • Checking accuracy of dimensions and specifications

    • Ensuring completeness of all required components and features

    • Verifying consistency in design and documentation

    • Confirming compliance with industry standards and regulations

  • Answered by AI
  • Q4. What is the typical deliverables of the different deliverables
  • Ans. 

    The typical deliverables of a project engineer include design drawings, technical specifications, project schedules, cost estimates, and progress reports.

    • Design drawings: detailed plans and schematics for construction or manufacturing

    • Technical specifications: detailed requirements for materials, equipment, and processes

    • Project schedules: timelines for completing tasks and milestones

    • Cost estimates: budget projections fo...

  • Answered by AI
  • Q5. Why this company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and explain what you have worked and do not lie

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and character
Round 2 - Technical 

(1 Question)

  • Q1. Experience details

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson Project Manager interview?
Sterling & Wilson interview process usually has 1-2 rounds. The most common rounds in the Sterling & Wilson interview process are Technical and Resume Shortlist.
How to prepare for Sterling & Wilson Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Project Management, Project Planning, Transmission, 220Kv and Billing.
What are the top questions asked in Sterling & Wilson Project Manager interview?

Some of the top questions asked at the Sterling & Wilson Project Manager interview -

  1. What are the Pump head loss calculation paramet...read more
  2. What is the difference between primary pump or secondary p...read more
  3. What things are required in chilled water pipe si...read more

Tell us how to improve this page.

Sterling & Wilson Project Manager Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Sterling & Wilson Project Manager Salary
based on 114 salaries
₹5.8 L/yr - ₹23 L/yr
23% less than the average Project Manager Salary in India
View more details

Sterling & Wilson Project Manager Reviews and Ratings

based on 24 reviews

3.7/5

Rating in categories

2.7

Skill development

3.7

Work-life balance

3.0

Salary

3.4

Job security

3.3

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 24 Reviews and Ratings
Electrical Engineer
270 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Senior Engineer
246 salaries
unlock blur

₹3.1 L/yr - ₹9.1 L/yr

Project Engineer
212 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Assistant Manager
165 salaries
unlock blur

₹4.7 L/yr - ₹17 L/yr

Manager
137 salaries
unlock blur

₹7.3 L/yr - ₹23.6 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview