Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 1.6k Reviews

Filter interviews by

Sterling & Wilson Electrical GET Interview Questions and Answers

Updated 14 Nov 2024

Sterling & Wilson Electrical GET Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Malla Reddy Engineering College, Ranga Reddy and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Electric resistivity
  • Q2. Total enf for a certain conditions
  • Ans. 

    Total enf for a certain conditions refers to the total energy consumption for specific circumstances.

    • Calculate the total energy consumption by summing up the individual energy consumption values for each condition.

    • Consider factors such as duration, power rating, and efficiency when calculating total energy consumption.

    • Example: Total energy consumption for a week of running a 100W light bulb for 8 hours a day.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself
  • Q2. What if you didn't get hike even after working hard

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Maharaja Sayajirao University (MSU), Baroda and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Working principle of induction motor
  • Ans. 

    Induction motors work on the principle of electromagnetic induction to generate rotating magnetic fields.

    • Induction motors have a stator with a set of windings that are connected to an AC power source.

    • When the AC power is applied, it creates a rotating magnetic field in the stator.

    • This rotating magnetic field induces currents in the rotor bars, causing it to rotate.

    • The rotor never catches up to the speed of the rotating...

  • Answered by AI
  • Q2. What is illumination?
  • Ans. 

    Illumination refers to the amount of light present in a space, measured in lux or foot-candles.

    • Illumination is crucial for visibility and safety in indoor and outdoor environments.

    • It is measured using units such as lux or foot-candles.

    • Proper illumination levels are important in workplaces, homes, and public spaces.

    • Examples of illumination sources include natural light, light fixtures, and streetlights.

  • Answered by AI
  • Q3. What is switch gear ? And it's application
  • Ans. 

    Switch gear is a combination of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment.

    • Switch gear is used to control the flow of electricity in a power system.

    • It is essential for protecting electrical equipment from damage due to overloads or short circuits.

    • Common applications of switch gear include power distribution, industrial plants, and electrical subst

  • Answered by AI
  • Q4. Types of Transformer
  • Ans. 

    Transformers are classified based on their construction, cooling methods, and voltage levels.

    • Based on construction: Core type and Shell type transformers

    • Based on cooling methods: Oil immersed, Dry type, and Water cooled transformers

    • Based on voltage levels: Step-up and Step-down transformers

    • Examples: Distribution transformer, Power transformer, Auto transformer

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go to interview with your basics.
All the best
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Motor type, Pump lowering, ESR piping etc.
  • Q2. Solar Specification
Round 2 - HR 

(2 Questions)

  • Q1. Notice period is negotiable
  • Q2. 30%hike on current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm, to be honest if you know about whats they ask explain them if not then leave and say sorry.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

The test is very difficult you have to complete all 20 questions which consist GC , subject related

Round 2 - Technical 

(2 Questions)

  • Q1. What is the wave trape?
  • Ans. 

    A wave trap is a device used in electrical engineering to prevent unwanted signals or frequencies from entering a system.

    • Wave traps are typically used in power systems to filter out specific frequencies that can cause interference.

    • They are designed to allow only desired signals to pass through while blocking unwanted signals.

    • Wave traps can be used in substations, transmission lines, and other electrical systems to impr...

  • Answered by AI
  • Q2. Which types of circuit breaker use in substation
  • Ans. 

    Types of circuit breakers used in substations include air circuit breakers, oil circuit breakers, vacuum circuit breakers, and SF6 circuit breakers.

    • Air circuit breakers are commonly used in low voltage applications.

    • Oil circuit breakers are used in high voltage applications.

    • Vacuum circuit breakers are compact and reliable, suitable for medium voltage applications.

    • SF6 circuit breakers are used in high voltage substations

  • Answered by AI
Round 3 - Group Discussion 

Global warming ,covid-19, current affairs

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice one
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is the process of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.

    • Earthing involves creating a connection between the electrical system and the earth.

    • It is done by burying a metal conductor, such as a copper rod, in the ground.

    • The metal conductor is connected to the electrical system using a wire or cable.

    • Earthing provides a path for...

  • Answered by AI
  • Q2. Which type of DGs used at your Site
  • Ans. 

    The type of DGs used at our site are diesel generators.

    • Diesel generators are commonly used as backup power sources in various industries.

    • They are reliable and can provide a continuous power supply during electrical outages.

    • DGs are often used in remote locations or areas with unreliable grid power.

    • They require regular maintenance and fuel supply to operate efficiently.

    • Examples of DGs used at our site include Cummins, Ca

  • Answered by AI
  • Q3. What is the difference between LT and HT line?
  • Ans. 

    LT line refers to Low Tension line while HT line refers to High Tension line.

    • LT line carries low voltage and is used for domestic and small-scale commercial purposes.

    • HT line carries high voltage and is used for industrial and large-scale commercial purposes.

    • LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.

    • LT lines are usually overhead lines, while HT lines can be both overhead and ...

  • Answered by AI
  • Q4. Which type of Circuit Breakers you used at Site?
  • Ans. 

    We used different types of circuit breakers at the site depending on the specific requirements.

    • We used air circuit breakers (ACBs) for low voltage applications.

    • For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).

    • In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.

    • For specialized applications like generator protection, we used differential ...

  • Answered by AI
  • Q5. How big transformers you used at site
  • Ans. 

    The size of transformers used at the site varied depending on the specific requirements of the project.

    • Transformers used at the site were of different sizes based on the power demand of the electrical system.

    • For smaller projects, transformers with a capacity of around 100 kVA were used.

    • For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.

    • For larger projects, transformers wit...

  • Answered by AI
  • Q6. Which type of Batching Plant you used at Site
  • Ans. 

    We used a stationary type batching plant at the site.

    • We used a stationary type batching plant for our construction project.

    • The stationary batching plant had a higher production capacity compared to mobile plants.

    • It was equipped with multiple storage bins for different types of aggregates.

    • The plant had a conveyor belt system to transfer the aggregates to the mixer.

    • We used this type of batching plant because it provided

  • Answered by AI
  • Q7. At which project you are working

Interview Preparation Tips

Interview preparation tips for other job seekers - It dipends on the interviewer which type of questions he will ask.
But one thing important be confident while interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Earthing design
  • Ans. Explain Earthing design using excel or any earthing design software
  • Answered by B.Mohammed Amjad
  • Q2. Cable Sizing calculation
  • Ans. Explain step by step procedure of Cable Sizing
  • Answered by B.Mohammed Amjad
  • Q3. How to handle designers in tough time
  • Ans. 

    Communicate openly, provide support, set clear expectations, offer solutions

    • Communicate openly with designers to understand their challenges and concerns

    • Provide support and resources to help designers overcome tough times

    • Set clear expectations and goals to keep designers focused and motivated

    • Offer solutions and brainstorm ideas together to find the best way forward

  • Answered by AI
  • Q4. Explain your individual contribution to the project

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your resume updated which would exactly match your previous organization experience. Show your achievements
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Self introduction & previous company experience
Round 1 - Technical 

(1 Question)

  • Q1. Basic design process, BIL of Substation equipment,

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself to represent your knowledge in good way

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Control wiring for ACB and VCB?
  • Ans. 

    Control wiring for ACB and VCB involves connecting control circuits to the breaker for proper operation.

    • Control wiring connects the breaker control circuits to the control panel.

    • The wiring should be properly sized and insulated.

    • The wiring should be color-coded for easy identification.

    • The wiring should be tested for proper operation before energizing the breaker.

    • Examples of control circuits include trip coil, close coil

  • Answered by AI
  • Q2. How to read right control wiring
  • Ans. 

    Control wiring is read by understanding the symbols and connections on the diagram.

    • Identify the power source and the load

    • Understand the symbols used for switches, relays, and other components

    • Follow the connections and determine the control logic

    • Check for any safety interlocks or emergency stops

    • Verify the wiring matches the diagram

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practice. And general work

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. MEP Electrical Engineer with over 11 years experience.
  • Q2. If any requirment? Then will contact me

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good knowledge of MEP Project.

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson Electrical GET interview?
Sterling & Wilson interview process usually has 2 rounds. The most common rounds in the Sterling & Wilson interview process are Technical and One-on-one Round.
What are the top questions asked in Sterling & Wilson Electrical GET interview?

Some of the top questions asked at the Sterling & Wilson Electrical GET interview -

  1. Total enf for a certain conditi...read more
  2. Electric resistiv...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Sterling & Wilson interview
Campus Placement
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Electrical Engineer
274 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Senior Engineer
243 salaries
unlock blur

₹3.1 L/yr - ₹9 L/yr

Assistant Manager
207 salaries
unlock blur

₹4.1 L/yr - ₹15.5 L/yr

Project Engineer
196 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Deputy Manager
143 salaries
unlock blur

₹5.7 L/yr - ₹18 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.2
Compare

BHEL

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview