I was interviewed in Dec 2024.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
The code used for measurement is typically based on industry standards and guidelines.
Common measurement codes include ASTM (American Society for Testing and Materials), ISO (International Organization for Standardization), and ASME (American Society of Mechanical Engineers)
Each code provides specific guidelines for measuring different aspects of a project or product
For example, ASTM D792 is used for measuring the dens
The wastage limit of steel varies depending on the project requirements and specifications.
The wastage limit of steel is typically around 2-3% in construction projects.
However, some projects may have stricter wastage limits depending on the budget and design requirements.
It is important for billing engineers to accurately estimate the required amount of steel to minimize wastage and cost overruns.
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
Starworth Infrastructure Construction interview questions for popular designations
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
Various waterproofing methodologies include membrane waterproofing, cementitious waterproofing, crystalline waterproofing, and bituminous waterproofing.
Membrane waterproofing involves applying a thin layer of waterproof material over the surface.
Cementitious waterproofing uses cement-based materials to create a barrier against water penetration.
Crystalline waterproofing involves chemicals that react with water to form ...
Finishing items in flats involves completing the final touches and details to prepare the items for use or display.
Inspecting for any defects or imperfections
Cleaning and polishing surfaces
Applying protective coatings or finishes
Assembling any additional components
Packaging for shipment or display
Maintaining quality and quantity involves setting clear standards, regular monitoring, effective communication, and continuous improvement.
Establish clear quality and quantity standards for products or services
Regularly monitor production processes to ensure adherence to standards
Communicate expectations and provide feedback to employees
Implement quality control measures such as inspections and audits
Continuously seek
Get interview-ready with Top Starworth Infrastructure Construction Interview Questions
I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Basic calculations for billing and quantity survey require accurate measurements, unit rates, quantities, and labor costs.
Accurate measurements of dimensions and quantities are essential
Unit rates for materials and labor must be determined
Labor costs need to be calculated based on the quantity of work done
Total cost is calculated by multiplying the quantity by the unit rate
Unit of measurements are used to quantify physical quantities in various fields.
Units of measurements include length (meter), mass (kilogram), time (second), temperature (kelvin), etc.
Different industries may use different units of measurements, such as square feet in construction or gallons in liquid measurements.
Units can be converted using conversion factors, such as 1 meter = 3.28 feet.
I applied via Referral and was interviewed in Apr 2022. There was 1 interview round.
I applied via LinkedIn
Top trending discussions
The duration of Starworth Infrastructure Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 13 interviews
Interview experience
based on 123 reviews
Rating in categories
Site Engineer
26
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Assistant Manager
24
salaries
| ₹7.8 L/yr - ₹11.5 L/yr |
QA QC Engineer
15
salaries
| ₹3 L/yr - ₹5.8 L/yr |
Deputy Manager
15
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Senior Engineer
14
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group