Filter interviews by
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
Various waterproofing methodologies include membrane waterproofing, cementitious waterproofing, crystalline waterproofing, and bituminous waterproofing.
Membrane waterproofing involves applying a thin layer of waterproof material over the surface.
Cementitious waterproofing uses cement-based materials to create a barrier against water penetration.
Crystalline waterproofing involves chemicals that react with water to form ...
Finishing items in flats involves completing the final touches and details to prepare the items for use or display.
Inspecting for any defects or imperfections
Cleaning and polishing surfaces
Applying protective coatings or finishes
Assembling any additional components
Packaging for shipment or display
Maintaining quality and quantity involves setting clear standards, regular monitoring, effective communication, and continuous improvement.
Establish clear quality and quantity standards for products or services
Regularly monitor production processes to ensure adherence to standards
Communicate expectations and provide feedback to employees
Implement quality control measures such as inspections and audits
Continuously seek
Top trending discussions
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 16 Feb 2024
Concrete temperature refers to the temperature of freshly mixed concrete before it sets.
Concrete temperature affects the setting time and strength development of concrete.
It is important to monitor and control the temperature of concrete during mixing, transportation, and placement.
The ideal temperature range for concrete is typically between 50-75 degrees Fahrenheit.
Extreme temperatures can lead to issues such as ther...
About your position.
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
posted on 8 Feb 2025
I have extensive experience in implementing QC procedures and conducting inspections as a Quality Control Inspector.
Developing and implementing QC procedures to ensure product quality
Conducting inspections and tests to identify defects or non-conformities
Documenting findings and reporting on quality issues
Collaborating with production teams to address quality concerns
Continuous improvement of QC processes based on feed
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
posted on 29 Oct 2024
Technical questions and aptitude questions
About the railways facility
posted on 10 Oct 2024
based on 1 interview
Interview experience
Assistant Manager
24
salaries
| ₹7.9 L/yr - ₹11.5 L/yr |
Site Engineer
24
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Deputy Manager
18
salaries
| ₹4.5 L/yr - ₹14 L/yr |
QA QC Engineer
15
salaries
| ₹3 L/yr - ₹5.8 L/yr |
Senior Engineer
14
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons