Upload Button Icon Add office photos

Filter interviews by

Starworth Infrastructure Construction Manager QS Interview Questions and Answers

Updated 16 Jan 2022

Starworth Infrastructure Construction Manager QS Interview Experiences

1 interview found

Manager QS Interview Questions & Answers

user image Anonymous

posted on 16 Jan 2022

Interview Questionnaire 

2 Questions

  • Q1. How about the company
  • Q2. Good company & good working environment

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare thoroughly with subject knowledge is must

Interview questions from similar companies

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Solar photovoltaic systems technical related
  • Q2. Plan performance analysis related
  • Q3. Operation and maintenance activities related

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus for technical and plant performance analysis related topics

I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. Share details of your previous job.
  • Q3. What are your salary expectations?
Round 3 - Technical 

(1 Question)

  • Q1. Why should provide cable (stress) in bridge
  • Ans. 

    Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.

    • Cable (stress) helps to distribute the load of the bridge evenly.

    • It reduces the amount of material required for construction.

    • It also helps to improve the stability of the bridge.

    • Cable (stress) is commonly used in suspension bridges.

    • It allows for longer spans to be constructed without the need for additional support.

    • Cab...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please all questions answer say with confidently to interviewer .
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Ans. 

    The hydraulic gradient line is a line representing the total head of water at various points along a flow path in a hydraulic system.

    • It is a graphical representation of the total head of water in a hydraulic system.

    • It shows the energy level of water at different points along a flow path.

    • The slope of the hydraulic gradient line indicates the direction and rate of flow of water.

    • It is used in analyzing flow patterns and d...

  • Answered by AI
  • Q2. What are the methods for managing floods?
  • Ans. 

    Methods for managing floods include structural measures, non-structural measures, and preparedness planning.

    • Structural measures include building dams, levees, and flood walls to control water flow.

    • Non-structural measures involve land-use planning, zoning regulations, and wetland preservation to reduce flood risk.

    • Preparedness planning includes early warning systems, evacuation plans, and community education on flood saf...

  • Answered by AI
  • Q3. What is prestress concrete?
  • Ans. 

    Prestressed concrete is a type of concrete that has been compressed prior to being subjected to loads.

    • Prestressed concrete is created by introducing internal stresses in the concrete before it is subjected to external loads.

    • This compression helps to counteract the tensile stresses that the concrete will experience during use.

    • Prestressed concrete is commonly used in bridges, parking structures, and high-rise buildings.

    • E...

  • Answered by AI
  • Q4. What is Flood Wall?
  • Ans. 

    A flood wall is a structure designed to prevent flooding by holding back water.

    • Flood walls are typically made of concrete, steel, or other strong materials.

    • They are commonly used along rivers, coastlines, and other areas prone to flooding.

    • Flood walls can vary in height and design depending on the level of protection needed.

    • Examples of flood walls include the Thames Barrier in London and the flood walls along the Missis

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions related pipeline

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with your basic knowledge
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the hydrotest pressure? Ans:- 1.5 times of design pressure.
  • Ans. 

    The hydrotest pressure is 1.5 times the design pressure.

    • Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.

    • It is usually done before commissioning the system.

    • For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.

  • Answered by AI
  • Q2. Q:- What is the procedure for fit up inspection? Ans:- Base metal Classification, cleaning, Alignment, Root gap, root face, Bevel angle & mismatch or overlap.
  • Ans. 

    The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.

    • Classify the base metal

    • Clean the surface

    • Align the parts to be joined

    • Check the root gap and root face

    • Measure the bevel angle

    • Check for any mismatch or overlap

    • Ensure all specifications are met

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You was achieved goal in oil and gas sector and pipe line construction project of CGD.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work related and current responsibility
Round 3 - Technical 

(1 Question)

  • Q1. Faculty and experience related
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Tell about yourself and based on cv

Interview Preparation Tips

Interview preparation tips for other job seekers - Study client and appear accordingly
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About the CGD ?
Round 3 - One-on-one 

(1 Question)

  • Q1. About work experience ?
Round 4 - HR 

(1 Question)

  • Q1. They asked me about Salary ?

Tell us how to improve this page.

Starworth Infrastructure Construction Manager QS Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

5.0

Salary

4.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
25 salaries
unlock blur

₹3.5 L/yr - ₹6 L/yr

Assistant Manager
24 salaries
unlock blur

₹7.9 L/yr - ₹11.5 L/yr

Deputy Manager
18 salaries
unlock blur

₹4.5 L/yr - ₹14 L/yr

QA QC Engineer
15 salaries
unlock blur

₹3 L/yr - ₹5.8 L/yr

Senior Engineer
14 salaries
unlock blur

₹5 L/yr - ₹8.6 L/yr

Explore more salaries
Compare Starworth Infrastructure Construction with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

B.L. Kashyap & Sons

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview