Basic calculations for billing and quantity survey require accurate measurements, unit rates, quantities, and labor costs.
Accurate measurements of dimensions and quantities are essential
Unit rates for materials and labor must be determined
Labor costs need to be calculated based on the quantity of work done
Total cost is calculated by multiplying the quantity by the unit rate
Unit of measurements are used to quantify physical quantities in various fields.
Units of measurements include length (meter), mass (kilogram), time (second), temperature (kelvin), etc.
Different industries may use different units of measurements, such as square feet in construction or gallons in liquid measurements.
Units can be converted using conversion factors, such as 1 meter = 3.28 feet.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
The code used for measurement is typically based on industry standards and guidelines.
Common measurement codes include ASTM (American Society for Testing and Materials), ISO (International Organization for Standardization), and ASME (American Society of Mechanical Engineers)
Each code provides specific guidelines for measuring different aspects of a project or product
For example, ASTM D792 is used for measuring the dens
The wastage limit of steel varies depending on the project requirements and specifications.
The wastage limit of steel is typically around 2-3% in construction projects.
However, some projects may have stricter wastage limits depending on the budget and design requirements.
It is important for billing engineers to accurately estimate the required amount of steel to minimize wastage and cost overruns.
Top trending discussions
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
posted on 21 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.
Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.
Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.
The quantity of shuttering material required also depends on the type of formwork used, su...
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
26
salaries
| ₹3.5 L/yr - ₹5.8 L/yr |
Assistant Manager
24
salaries
| ₹7.8 L/yr - ₹11.5 L/yr |
QA QC Engineer
15
salaries
| ₹3 L/yr - ₹5.8 L/yr |
Deputy Manager
15
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Senior Engineer
14
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group