Starworth Infrastructure Construction Billing Engineer Interview Questions, Process, and Tips

Updated 9 May 2024

Top Starworth Infrastructure Construction Billing Engineer Interview Questions and Answers

Starworth Infrastructure Construction Billing Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are the requirements for Basic calculations for billing and quantity survey
  • Ans. 

    Basic calculations for billing and quantity survey require accurate measurements, unit rates, quantities, and labor costs.

    • Accurate measurements of dimensions and quantities are essential

    • Unit rates for materials and labor must be determined

    • Labor costs need to be calculated based on the quantity of work done

    • Total cost is calculated by multiplying the quantity by the unit rate

  • Answered by AI
  • Q2. Unit of measurements
  • Ans. 

    Unit of measurements are used to quantify physical quantities in various fields.

    • Units of measurements include length (meter), mass (kilogram), time (second), temperature (kelvin), etc.

    • Different industries may use different units of measurements, such as square feet in construction or gallons in liquid measurements.

    • Units can be converted using conversion factors, such as 1 meter = 3.28 feet.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Starworth Infrastructure Construction Billing Engineer interview:
  • Quantity Surveying
Interview preparation tips for other job seekers - No need to feel tension. Be in relax and give answer wheather it may be right or wrong.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the code we use for measurement
  • Ans. 

    The code used for measurement is typically based on industry standards and guidelines.

    • Common measurement codes include ASTM (American Society for Testing and Materials), ISO (International Organization for Standardization), and ASME (American Society of Mechanical Engineers)

    • Each code provides specific guidelines for measuring different aspects of a project or product

    • For example, ASTM D792 is used for measuring the dens

  • Answered by AI
  • Q2. What is the wastage limit of steel
  • Ans. 

    The wastage limit of steel varies depending on the project requirements and specifications.

    • The wastage limit of steel is typically around 2-3% in construction projects.

    • However, some projects may have stricter wastage limits depending on the budget and design requirements.

    • It is important for billing engineers to accurately estimate the required amount of steel to minimize wastage and cost overruns.

  • Answered by AI

Billing Engineer Interview Questions Asked at Other Companies

Q1. What is Escalation and what is the significance of this? What is ... read more
Q2. What is the difference between penality and Liquidity damages?
Q3. How many types of contract and their importance? What are the adv ... read more
Q4. What do you understand by Term Basic Price variation?
Q5. Wastage litim of rainforcement steel as per cpwd and market pract ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical Questions
  • Q2. Market rate Analysis
Round 2 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Job location

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepair for interview, keep your resume updated with new skills and experience.
Attend industry events, workshops and conferences to build your professional network.

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Shuttering quantity for slab and beam.
  • Ans. 

    Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.

    • Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.

    • Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.

    • The quantity of shuttering material required also depends on the type of formwork used, su...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience. Feel energetic to have some good experience person.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Billing related questions... BBS preparation.. allowable wastage, material Re-conciliation, client billing, labour billing, on time bill submission, Manpower planning accordingly work, etc,..
  • Q2. BBS preparation and on time billing
  • Q3. Material Re-conciliation
  • Q4. Allowable wastage
  • Q5. Planning related

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Gentle and genuine to company..
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical Questions
  • Q2. Market rate Analysis
Round 2 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Job location

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepair for interview, keep your resume updated with new skills and experience.
Attend industry events, workshops and conferences to build your professional network.

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Shuttering quantity for slab and beam.
  • Ans. 

    Shuttering quantity for slab and beam is calculated based on the area and dimensions of the structure.

    • Shuttering quantity for slab is calculated by multiplying the area of the slab by the height of the formwork.

    • Shuttering quantity for beam is calculated by multiplying the length of the beam by the height and width of the formwork.

    • The quantity of shuttering material required also depends on the type of formwork used, su...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience. Feel energetic to have some good experience person.

Starworth Infrastructure Construction Interview FAQs

How many rounds are there in Starworth Infrastructure Construction Billing Engineer interview?
Starworth Infrastructure Construction interview process usually has 1-2 rounds. The most common rounds in the Starworth Infrastructure Construction interview process are Technical and Resume Shortlist.
What are the top questions asked in Starworth Infrastructure Construction Billing Engineer interview?

Some of the top questions asked at the Starworth Infrastructure Construction Billing Engineer interview -

  1. What are the requirements for Basic calculations for billing and quantity sur...read more
  2. What is the code we use for measurem...read more
  3. What is the wastage limit of st...read more

Tell us how to improve this page.

Starworth Infrastructure Construction Billing Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Starworth Infrastructure Construction Billing Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

4.0

Salary

3.6

Job security

3.6

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
26 salaries
unlock blur

₹3.5 L/yr - ₹5.8 L/yr

Assistant Manager
24 salaries
unlock blur

₹7.8 L/yr - ₹11.5 L/yr

QA QC Engineer
15 salaries
unlock blur

₹3 L/yr - ₹5.8 L/yr

Deputy Manager
15 salaries
unlock blur

₹4.2 L/yr - ₹13 L/yr

Senior Engineer
14 salaries
unlock blur

₹5 L/yr - ₹8.6 L/yr

Explore more salaries
Compare Starworth Infrastructure Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview