Q1. Shear force diagram and bending moment diagram for combination of different loads

Ans.

Shear force and bending moment diagrams show the variation of forces and moments along a beam subjected to different loads.

  • Shear force diagram represents the variation of shear force along the length of the beam.

  • Bending moment diagram represents the variation of bending moment along the length of the beam.

  • Different loads such as point loads, distributed loads, and moments can be combined to create a composite load on the beam.

  • To draw the shear force diagram, calculate the rea...read more

View 2 more answers

Q2. What are different grades of steel and corresponding yield stress.

Ans.

Different grades of steel have varying yield stress. Learn about them here.

  • The most common grades of steel are A36, A572, and A992.

  • A36 steel has a yield strength of 36,000 psi.

  • A572 steel has a yield strength of 42,000-65,000 psi depending on the grade.

  • A992 steel has a yield strength of 50,000-65,000 psi depending on the grade.

  • Higher grades of steel generally have higher yield strengths.

Add your answer

Q3. Which formwork is used in all ur recently worked companies ?

Ans.

Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.

  • Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.

  • Steel formwork is preferred for large and complex structures due to its durability and reusability.

  • Aluminum formwork is lightweight and easy to handle, making it suitable for fast-track construction projects.

Add your answer

Q4. 1.Concrete batch time which temperature of heat produced

Ans.

Concrete batch time affects the temperature of heat produced during the curing process.

  • The batch time of concrete refers to the duration for which the concrete ingredients are mixed together.

  • A longer batch time can lead to higher temperatures being produced during the curing process.

  • The heat generated during curing is important as it affects the strength and durability of the concrete.

  • Proper monitoring and control of batch time and temperature is crucial for ensuring the qual...read more

View 1 answer
Discover null interview dos and don'ts from real experiences

Q5. What is thickness for outer & inner walls Plastering?

Ans.

The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.

  • The thickness of plastering for outer walls is usually around 15mm to 20mm.

  • The thickness of plastering for inner walls is typically around 12mm to 15mm.

  • The thickness may vary based on the type of wall surface and the desired finish.

  • It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.

Add your answer

Q6. How many materials required in 1m3 Plastering mortar?

Ans.

The materials required in 1m3 of plastering mortar include cement, sand, and water.

  • Cement is typically used in the ratio of 1:4 for plastering mortar.

  • Sand is used in the ratio of 3-4 times the amount of cement used.

  • Water is added as needed to achieve the desired consistency.

  • For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.

Add your answer
Are these interview questions helpful?

Q7. What is Copy Monitor?

Ans.

Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

  • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

  • It allows users to monitor and synchronize changes made to linked models.

  • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

  • It can also be used to monitor changes to parameters such as level heights and room names.

  • Copy Monitor is ...read more

View 1 answer

Q8. How many Concrete blocks is required for 100sft ?

Ans.

The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.

  • The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.

  • The size of the concrete block and the thickness of the wall will determine the number of blocks needed.

  • For example, if each concrete block is 1ft x 1ft and the wall is 4 inches thick, you would need 100 blocks for 100sft area.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is the mix proportion of Plastering mortar?

Ans.

The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.

  • The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)

  • The mix can also include lime to improve workability and durability

  • Water is added to achieve the desired consistency for application

  • Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed

Add your answer

Q10. What is the purpose of using vibrator

Ans.

Vibrators are used to generate vibrations for various purposes.

  • Vibrators are commonly used in construction to compact concrete and remove air bubbles.

  • They are also used in industrial applications to facilitate material flow in hoppers and chutes.

  • In the field of electronics, vibrators are used in devices like cell phones to provide haptic feedback.

  • Vibrators are used in sexual wellness products for stimulation and pleasure.

  • They can also be used in medical settings for therapeut...read more

View 1 answer

Q11. What is purchasing process while we make a contract for particular material?

Ans.

The purchasing process for a contract involves identifying the material needed, selecting a supplier, negotiating terms, and finalizing the agreement.

  • Identify the material needed for the project

  • Research and select potential suppliers

  • Negotiate terms and conditions of the contract

  • Finalize the agreement and sign the contract

  • Monitor supplier performance and ensure compliance with the contract

Add your answer

Q12. What indicates Fy in steel

Ans.

Fy in steel indicates the yield strength of the material.

  • Fy is a parameter used to measure the stress at which a material begins to deform plastically.

  • It represents the maximum stress a material can withstand before permanent deformation occurs.

  • Fy is typically expressed in units of force per unit area, such as pounds per square inch (psi) or megapascals (MPa).

  • Knowing the Fy of a steel is important for structural design and determining the load-bearing capacity of a component....read more

View 2 more answers

Q13. 1. Mivan Shuttering Procedure and name of components?

Ans.

Mivan shuttering is a construction technique using aluminum formwork system. Components include panels, beams, props, etc.

  • Mivan shuttering is a fast-paced construction technique popular for high-rise buildings.

  • Components include Mivan panels, beams, props, scaffolding, etc.

  • The system allows for quick assembly and disassembly, reducing construction time and labor costs.

Add your answer

Q14. 1. What steel test are done at construction site...?

Ans.

Steel tests commonly done at construction sites include tensile strength test, bend test, impact test, hardness test, and chemical composition analysis.

  • Tensile strength test is conducted to determine the maximum stress a material can withstand before breaking.

  • Bend test is performed to assess the ductility and flexibility of the steel.

  • Impact test is carried out to evaluate the toughness of the steel.

  • Hardness test is done to measure the resistance of the steel to deformation.

  • Ch...read more

Add your answer

Q15. how do you link Revit models?

Ans.

Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

  • Open the host model and go to the 'Insert' tab.

  • Click on 'Link Revit' and select the model to be linked.

  • Choose the appropriate settings for the link, such as positioning and visibility.

  • Repeat the process for any additional models to be linked.

  • Save the host model to ensure the links are maintained.

Add your answer

Q16. Qty of Cement and sand in 1sqm plastering

Ans.

The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.

  • The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.

  • The ratio of cement to sand also affects the quantity.

  • For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.

  • For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sand is 100 kg per square meter.

View 2 more answers

Q17. Density of steel and concrete

Ans.

The density of steel is higher than that of concrete.

  • Steel has a density of around 7.8 g/cm³, while concrete typically has a density of 2.3 g/cm³.

  • The higher density of steel makes it stronger and more durable, but also heavier.

  • Concrete, on the other hand, is less dense but still provides good structural strength.

  • The density of steel and concrete can vary depending on the specific composition and additives used.

View 3 more answers

Q18. Draw SFD & BMD for a simply supported load.

Ans.

SFD & BMD for a simply supported load

  • SFD is a diagram that shows the variation of shear force along the length of a beam

  • BMD is a diagram that shows the variation of bending moment along the length of a beam

  • For a simply supported load, the SFD will be a straight line with a constant slope

  • The BMD will be a parabolic curve with the maximum value at the center of the beam

  • The SFD and BMD can be calculated using equations and boundary conditions

Add your answer

Q19. What are the code of references for concrete Mix Design?

Ans.

ACI 211.1 is the code of reference for concrete mix design.

  • ACI 211.1 is the standard practice for selecting proportions for normal, heavyweight, and mass concrete based on specified compressive strength.

  • Other codes of reference include ASTM C94, which provides standard specifications for ready-mixed concrete.

  • The mix design should also consider factors such as workability, durability, and exposure conditions.

  • The mix design should be tested and adjusted as necessary to meet pro...read more

Add your answer

Q20. what is basics of Civil Engineering?

Ans.

Civil Engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure.

  • Civil Engineering involves the planning, design, and construction of buildings, bridges, roads, dams, and other structures.

  • It includes the study of materials, geotechnical engineering, structural analysis, transportation engineering, and water resources engineering.

  • Civil Engineers use mathematical and scientific principles to solve engineering problems and ...read more

View 1 answer

Q21. Compressive strength of concrete after 14 & 28 days and also persentage of strength.

Ans.

Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.

  • Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).

  • After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.

  • After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.

  • The percentage of strength gained from 14 to 28 days can vary depending on th...read more

Add your answer

Q22. why sobha....................................

Ans.

Sobha is a leading real estate developer in India known for its quality construction and customer-centric approach.

  • Sobha has completed over 100 real estate projects across India

  • The company has won numerous awards for its quality construction and customer service

  • Sobha is committed to sustainable development and has implemented green initiatives in its projects

  • The company has a strong focus on customer satisfaction and has a dedicated customer service team

  • Sobha has a diverse po...read more

View 1 answer

Q23. How to find circular column concrete quantity.

Ans.

Circular column concrete quantity can be found using the formula: Volume = πr^2h

  • Calculate the area of the circular column using the formula A = πr^2

  • Measure the height of the column

  • Multiply the area by the height to get the volume of concrete needed

  • Consider any additional factors such as wastage or reinforcement bars

Add your answer

Q24. In case fire in 2 storey building fire is occured how you respond and take the immediate action

Ans.

I would immediately activate the fire alarm, evacuate the building, and call the fire department.

  • Activate the fire alarm to alert everyone in the building

  • Evacuate the building following the established evacuation plan

  • Call the fire department to report the fire and request assistance

  • Ensure all occupants are safely evacuated and accounted for

Add your answer

Q25. How to initiate sub structure to finishing work

Ans.

Initiating substructure to finishing work involves proper planning, coordination, and communication.

  • Develop a detailed project plan outlining the sequence of activities from substructure to finishing work

  • Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment

  • Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities

  • Regularly monitor progress and address any issues or delays promptly

  • Co...read more

Add your answer

Q26. What is Concrete density?

Ans.

Concrete density is the mass per unit volume of concrete.

  • Concrete density is typically measured in kilograms per cubic meter (kg/m^3).

  • The density of normal concrete is around 2400 kg/m^3.

  • Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.

  • Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.

Add your answer

Q27. As an engineer how will i execute the structures

Ans.

I will execute the structures by following the design plans, coordinating with various teams, ensuring quality control, and adhering to safety regulations.

  • Follow the design plans provided by the structural engineers

  • Coordinate with other teams such as architects, contractors, and subcontractors

  • Ensure quality control throughout the construction process

  • Adhere to safety regulations and standards

  • Regularly inspect the construction site to monitor progress and address any issues

  • Comm...read more

Add your answer

Q28. Density of steel, cement, concrete, sand, aggregates.

Ans.

Density of common construction materials

  • Steel: 7850 kg/m^3

  • Cement: 1440 kg/m^3

  • Concrete: 2400 kg/m^3

  • Sand: 1600-1700 kg/m^3

  • Aggregates: 1500-1750 kg/m^3

Add your answer

Q29. What is transformer and it's looses

Ans.

A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

  • Transformers are used to increase or decrease the voltage in electrical power transmission and distribution systems.

  • They consist of two or more coils of wire, known as windings, which are wound around a core made of magnetic material.

  • The primary winding receives electrical energy from the input circuit and produces a magnetic field.

  • This magneti...read more

View 1 answer

Q30. Planning and scheduling process, labour productivity rates of various construction activities

Ans.

Planning and scheduling process and labour productivity rates are crucial for efficient construction activities.

  • Planning and scheduling process involves identifying the scope of work, breaking it down into tasks, and assigning resources and timelines.

  • Labour productivity rates can be calculated by dividing the output by the input. This helps in estimating the time and cost required for each activity.

  • Factors affecting labour productivity rates include skill level, equipment ava...read more

Add your answer

Q31. What about water proofing ? how to do ??

Ans.

Waterproofing is the process of making a structure or object resistant to water penetration.

  • Waterproofing can be done using various materials such as membranes, coatings, and sealants.

  • Proper surface preparation is essential before applying waterproofing materials.

  • Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.

  • Examples of waterproofing methods include using waterproof membranes on roofs, applying sealants to joints and cracks, an...read more

Add your answer

Q32. How to find triangle concrete quantity.

Ans.

Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.

  • Calculate the area of the triangle using the formula: 1/2 * base * height.

  • Multiply the area by the thickness to get the concrete quantity.

  • For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.

Add your answer

Q33. BBS preparation of footing or slab

Ans.

BBS preparation is essential for ensuring the strength and stability of footings and slabs.

  • BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.

  • The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.

  • The BBS also helps to estimate the quantity of steel required and the cost of materials.

  • Proper BBS preparation is crucia...read more

View 1 answer

Q34. What is cement and types of cement

Ans.

Cement is a binding material used in construction. Types include Portland cement, white cement, and rapid-hardening cement.

  • Cement is a fine powder made from limestone, clay, and other minerals.

  • Portland cement is the most common type used in construction.

  • White cement is used for architectural purposes to achieve a clean, bright finish.

  • Rapid-hardening cement sets quickly and is ideal for projects with tight deadlines.

Add your answer

Q35. How to calculate weight of steel

Ans.

Weight of steel can be calculated by multiplying the volume of steel by its density.

  • Calculate the volume of steel (length x width x height)

  • Determine the density of the specific type of steel being used

  • Multiply the volume by the density to get the weight

  • Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg

Add your answer

Q36. How to calculate number of tiles

Ans.

Number of tiles can be calculated by determining the area to be covered and the size of each tile.

  • Calculate the total area to be covered by multiplying the length and width of the space.

  • Determine the size of each tile in square units.

  • Divide the total area by the size of each tile to get the number of tiles needed.

  • Consider adding extra tiles for cuts and wastage.

  • For example, if a room is 10 feet by 12 feet and each tile is 1 square foot, you would need 120 tiles.

Add your answer

Q37. How to make adaptive decision ?

Ans.

Adaptive decision making involves flexibility, creativity, and the ability to adjust to changing circumstances.

  • Consider all available information and potential outcomes

  • Be open to feedback and new perspectives

  • Stay agile and willing to change course if necessary

  • Utilize problem-solving skills to address unexpected challenges

  • Seek input from team members and stakeholders for diverse viewpoints

Add your answer

Q38. What are the check points in Batching Plant

Ans.

Check points in Batching Plant include material storage, weighing systems, mixing systems, and delivery systems.

  • Material storage area should be organized and free from debris to prevent contamination.

  • Weighing systems should be calibrated regularly to ensure accurate measurements.

  • Mixing systems should be checked for proper functioning and cleanliness to avoid cross-contamination.

  • Delivery systems should be inspected for leaks or blockages to ensure smooth transportation of mate...read more

Add your answer

Q39. What is slump test why we do.

Ans.

Slump test is a method to measure the consistency of concrete before it sets.

  • Slump test is used to determine the workability of fresh concrete.

  • It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

  • The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.

  • Slump test helps in ensuring that the concrete mix has the right amount of water for proper hydration and str...read more

Add your answer

Q40. What are the tests to check concrete flow?

Ans.

Tests to check concrete flow include slump test, flow table test, and V-funnel test.

  • Slump test measures the consistency and workability of concrete by determining the slump of a sample.

  • Flow table test evaluates the flow of concrete by measuring the diameter of the concrete spread on a flow table.

  • V-funnel test assesses the flowability of concrete by measuring the time it takes for the concrete to flow through a funnel.

Add your answer

Q41. Which bar you are using at site

Ans.

We are using steel bars of grade Fe500D at the site.

  • We are using steel bars of grade Fe500D for construction purposes.

  • These bars have high strength and ductility.

  • They are corrosion-resistant and have good bonding with concrete.

  • We are using bars of different diameters as per the structural requirements.

  • We are following the guidelines of the Indian Standards for reinforcement steel.

  • We are ensuring proper storage and handling of the bars to prevent any damage or rusting.

Add your answer

Q42. Do you know to prepare Barbending schedule

Ans.

Yes, I know how to prepare Barbending schedule.

  • I am familiar with the bar bending schedule (BBS) and its importance in construction projects.

  • I can read and interpret structural drawings to identify the required reinforcement details.

  • I have experience in using software such as AutoCAD and Excel to prepare BBS.

  • I am aware of the standard codes and practices for preparing BBS.

  • I can communicate effectively with the project team to ensure the accuracy and completeness of the BBS.

Add your answer

Q43. The technical name of cube filling rod?

Ans.

Cube filling rod is technically known as 'Tamping rod'.

  • Also known as tamping rod

  • Used to compact concrete in cube molds

  • Helps in removing air voids and ensuring uniform density

  • Typically made of steel or iron

  • Standard length is 16 inches with a diameter of 5/8 inch

Add your answer

Q44. What is the lapping of steel

Ans.

Lapping of steel is the process of overlapping two pieces of steel to create a continuous connection.

  • Lapping is commonly used in construction to join reinforcing steel bars together.

  • The overlapping length is typically specified in construction drawings or codes.

  • Proper lapping ensures structural integrity and strength of the steel connection.

Add your answer

Q45. 2. Props inner and Outer diameter..?

Ans.

Props inner and outer diameter are key measurements for selecting the appropriate propeller for a specific application.

  • Inner diameter refers to the diameter of the central opening of the propeller where it attaches to the propeller shaft.

  • Outer diameter refers to the total diameter of the propeller including the blades.

  • These measurements are crucial for ensuring proper fit and performance of the propeller.

  • For example, a propeller with an inner diameter of 1 inch and an outer d...read more

Add your answer

Q46. Is code for method of measurement

Ans.

Code for method of measurement is a standardized set of rules and guidelines used to quantify and evaluate the work done in a construction project.

  • Codes for method of measurement provide a uniform and consistent way to measure quantities in construction projects.

  • They help in accurately estimating costs, monitoring progress, and resolving disputes.

  • Examples include CESMM (Civil Engineering Standard Method of Measurement) and SMM7 (Standard Method of Measurement of Building Work...read more

Add your answer

Q47. What is the use of megger

Ans.

A megger is used to measure the insulation resistance of electrical wires and equipment.

  • Used to detect insulation faults in wires and cables

  • Helps prevent electrical breakdowns and accidents

  • Can identify deteriorating insulation before it causes damage

  • Commonly used in electrical maintenance and testing

  • Example: A megger can be used to test the insulation resistance of a motor winding

Add your answer

Q48. Explain your approach in detail w.r.t. b2b and b2c clients

Ans.

I tailor my approach based on the specific needs and preferences of each client, whether they are b2b or b2c.

  • For b2b clients, I focus on building long-term relationships, understanding their industry and challenges, and providing customized solutions.

  • For b2c clients, I emphasize consumer behavior analysis, market trends, and creating engaging marketing campaigns.

  • I prioritize clear communication, transparency, and delivering measurable results for both types of clients.

  • Example...read more

Add your answer

Q49. Engine function for Heavy Machines

Ans.

Engine function for heavy machines involves converting fuel into mechanical energy to power the machine.

  • Fuel is injected into the engine's combustion chamber

  • The fuel ignites and creates a controlled explosion

  • The explosion pushes a piston, which turns a crankshaft

  • The crankshaft converts the linear motion of the piston into rotational motion

  • The rotational motion powers the machine's hydraulic system or driveshaft

  • Examples of heavy machines include excavators, bulldozers, and cra...read more

Add your answer

Q50. what is slump in concrete

Ans.

Slump in concrete refers to the measure of consistency of freshly mixed concrete.

  • Slump is determined by the amount of water in the concrete mix.

  • It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.

  • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.

  • Slump test is commonly used in construction to ensure the quality of concret...read more

Add your answer

Q51. what is water cement ratio

Ans.

Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

  • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

  • A lower water cement ratio results in stronger and more durable concrete.

  • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

  • For example, a water cement ratio of 0.5 is commonly used for normal strength concrete.

  • Excessive water in the mix ca...read more

Add your answer

Q52. what is M20 grade concrete

Ans.

M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.

  • M20 grade concrete is commonly used in residential construction.

  • It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

  • The compressive strength of M20 grade concrete is 20 MPa.

  • It is suitable for foundations, beams, columns, and slabs.

Add your answer

Q53. What is critical path

Ans.

Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.

  • Critical path helps in identifying the tasks that are crucial for the project timeline.

  • It determines the shortest possible duration for completing the project.

  • Any delay in tasks on the critical path will directly impact the project's overall timeline.

  • Activities on the critical path have zero slack or float.

  • Example: In a construction project, ta...read more

Add your answer

Q54. Basic faults of engine and gear.

Ans.

Common faults in engines and gears.

  • Engine faults: overheating, low oil pressure, misfiring, knocking, stalling.

  • Gear faults: slipping, grinding, difficulty shifting, noisy operation.

  • Examples: worn piston rings, damaged bearings, worn synchros, damaged gears.

  • Regular maintenance and inspections can prevent many faults.

  • Proper lubrication and fluid levels are crucial for engine and gear health.

Add your answer

Q55. Can you manage region business ?

Add your answer

Q56. What is coloumn lap length

Ans.

Column lap length is the length of overlap between two reinforcing bars in a column.

  • Column lap length is important for ensuring proper structural integrity in a column.

  • It is typically specified in construction drawings or codes.

  • The lap length is determined based on the diameter of the reinforcing bars and the structural requirements.

  • For example, a column may require a lap length of 40 times the diameter of the bar.

Add your answer

Q57. How to do BBS ??

Ans.

BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.

  • Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors

  • Develop safety procedures and protocols based on the identified hazards

  • Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors

  • Implement a system for monitoring and evaluating safety perf...read more

Add your answer

Q58. What is the Bernoulli theorem

Ans.

The Bernoulli theorem states that in a flowing fluid, an increase in the speed of the fluid occurs simultaneously with a decrease in pressure or a decrease in the fluid's potential energy.

  • States that in a flowing fluid, an increase in speed occurs simultaneously with a decrease in pressure or potential energy

  • Describes the relationship between fluid speed, pressure, and potential energy

  • Used in fluid dynamics to analyze the behavior of fluids in motion

Add your answer

Q59. What is the full form ohe

Ans.

OHE stands for Overhead Equipment.

  • OHE is a system used in railways for supplying electricity to trains through overhead lines.

  • It includes components like catenary wires, droppers, insulators, and feeder pillars.

  • OHE is essential for the operation of electric trains, providing power for traction motors.

  • Regular maintenance of OHE is crucial to ensure safe and efficient train operations.

Add your answer

Q60. What is BBS fullform

Ans.

BBS stands for Bar Bending Schedule.

  • BBS is a document that provides details of reinforcement cutting length, type, and size of bars used in construction.

  • It helps in estimating the quantity of steel required for construction.

  • BBS is essential for ensuring the structural integrity and strength of the building.

  • Example: BBS includes information on the number of bars, their diameter, spacing, and placement in beams, columns, slabs, etc.

Add your answer

Q61. What if analysis?

Ans.

What if analysis involves evaluating different scenarios to understand the potential outcomes and impacts of various decisions.

  • Identify key variables and factors that could impact the decision or outcome

  • Create different scenarios based on varying values of these variables

  • Analyze the potential outcomes and impacts of each scenario

  • Use the analysis to make informed decisions and mitigate risks

  • Example: Conducting a what if analysis to determine the impact of changing suppliers on...read more

Add your answer

Q62. Mix ratios of concrete

Ans.

Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

  • Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.

  • The mix ratio will vary depending on the strength and durability requirements of the concrete.

  • Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.

  • Water is also added to the mix to achieve the desired consistency and workability.

Add your answer

Q63. Types of footing

Ans.

Types of footing include spread footings, mat foundations, pile foundations, and drilled caissons.

  • Spread footings are used for shallow foundations and distribute the load over a larger area.

  • Mat foundations are used for heavy loads and distribute the load over a larger area.

  • Pile foundations are used when soil conditions are poor and transfer the load to deeper, more stable soil layers.

  • Drilled caissons are used for heavy loads and are drilled into the ground to support the stru...read more

Add your answer

Q64. Bricks absorb water

Ans.

Yes, bricks absorb water due to their porous nature.

  • Bricks have small pores that allow water to seep in.

  • Water absorption can lead to deterioration of bricks over time.

  • Bricks with high absorption rates may not be suitable for certain climates or applications.

View 1 answer

Q65. What do you meaning ssp

Ans.

SSP stands for System Security Plan, which is a document outlining the security measures and protocols for a specific system or project.

  • SSP is a detailed document that includes information on security controls, risk assessments, security policies, and procedures.

  • It outlines how sensitive information will be protected, who has access to it, and how incidents will be handled.

  • Examples of components in an SSP include access control measures, encryption protocols, and incident res...read more

View 1 answer

Q66. What is power factor

Ans.

Power factor is a measure of how effectively electrical power is being used in a circuit.

  • Power factor is the ratio of real power (kW) to apparent power (kVA) in a circuit.

  • It indicates how efficiently electrical power is being converted into useful work.

  • A power factor of 1 (or 100%) means all the power is being used effectively, while a power factor of 0 means none of the power is being used efficiently.

  • Power factor can be improved by using power factor correction devices like...read more

Add your answer

Q67. Role of planning engineer

Ans.

Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.

  • Develop project schedules using software like Primavera P6

  • Monitor project progress and identify potential delays

  • Coordinate with various teams to ensure timely completion

  • Prepare reports on project status and communicate with stakeholders

  • Implement changes to the schedule as needed to keep the project on track

Add your answer

Q68. What is 2d, 4d

Ans.

2D and 4D refer to dimensions in geometry and physics.

  • 2D refers to two-dimensional space, like a flat surface with length and width.

  • 4D refers to four-dimensional space, which includes the three dimensions of space (length, width, height) and the dimension of time.

  • Examples of 2D objects include a square or a circle, while examples of 4D concepts include spacetime in physics.

Add your answer

Q69. Value Engineering method ?

Ans.

Value Engineering is a systematic method to improve the value of goods or products by analyzing their functions and reducing costs.

  • Value Engineering involves analyzing the functions of a product or service to find ways to improve value.

  • It focuses on reducing costs while maintaining or improving quality.

  • Value Engineering can be applied in various industries such as construction, manufacturing, and software development.

  • Example: Redesigning a product to use less material without...read more

Add your answer

Q70. What minimum slab height

Ans.

The minimum slab height depends on the load it needs to bear and the span it needs to cover.

  • The minimum slab height is determined by the load it needs to bear and the span it needs to cover.

  • The minimum slab height for residential buildings is usually 4 inches.

  • For commercial buildings, the minimum slab height is usually 6 inches.

  • The minimum slab height for industrial buildings can be up to 12 inches or more.

  • The minimum slab height also depends on the type of reinforcement used...read more

Add your answer

Q71. What is ttc in railway

Ans.

TTC in railway stands for Time to Collision, which is a measure of the time it will take for two objects to collide if they continue on their current path.

  • TTC is used in railway signaling systems to prevent collisions between trains.

  • It calculates the time it will take for a train to reach a certain point based on its current speed and distance.

  • TTC is crucial for ensuring the safety and efficiency of railway operations.

Add your answer

Q72. Steps to achive good quality work

Ans.

Achieving good quality work involves thorough planning, effective communication, attention to detail, continuous monitoring, and feedback.

  • Thoroughly plan the project scope, timeline, and resources.

  • Communicate clearly with team members and stakeholders to ensure everyone is on the same page.

  • Pay attention to detail in every aspect of the project to avoid errors and rework.

  • Continuously monitor progress and quality throughout the project lifecycle.

  • Seek feedback from team members ...read more

Add your answer

Q73. Mivan Shuttering Procedure?

Ans.

Mivan shuttering is a construction technique using aluminum formwork for casting concrete walls, slabs, columns, etc.

  • Mivan shuttering involves setting up aluminum formwork panels on site

  • The formwork is assembled and fixed using pins, wedges, and wallers

  • Concrete is poured into the formwork and allowed to set

  • Once the concrete has cured, the formwork is removed and reused for the next casting

  • Mivan shuttering is known for its speed, efficiency, and quality of finish

Add your answer

Q74. Steel estimation in a beam

Ans.

Steel estimation in a beam involves calculating the quantity of steel required for reinforcement.

  • Calculate the total length of steel bars required based on the dimensions of the beam and the spacing of the bars.

  • Determine the diameter of the steel bars to be used for reinforcement.

  • Consider the grade of steel and the design requirements to calculate the total weight of steel needed.

  • Account for wastage and additional reinforcement as per structural design.

  • Use formulas such as to...read more

Add your answer

Q75. Production productivity setting

Ans.

Production productivity setting involves optimizing processes to increase output efficiently.

  • Analyze current production processes to identify bottlenecks

  • Implement automation or technology to streamline operations

  • Train and develop staff to improve efficiency

  • Set clear goals and targets for production output

  • Regularly monitor and evaluate productivity metrics

Add your answer

Q76. Streel cutting length

Ans.

Steel cutting length is the length of steel bars required for construction purposes.

  • Steel cutting length is calculated based on the dimensions of the structure and the required reinforcement.

  • It is important to consider the bending and overlapping requirements when determining the cutting length.

  • Steel cutting length can be calculated using formulas or software programs.

  • For example, for a beam with a length of 5 meters and a bending requirement of 90 degrees, the steel cutting ...read more

Add your answer

Q77. grades of concrete

Ans.

Grades of concrete refer to the strength of the concrete mix design.

  • Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.

  • Higher grade concrete has higher compressive strength and is used for structural purposes.

  • Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.

Add your answer

Q78. Density of steel

Ans.

Density of steel is approximately 7.85 g/cm^3.

  • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

  • The density of steel is approximately 7.85 g/cm^3.

  • Different types of steel may have slightly different densities.

Add your answer

Q79. Implementation of EHS at site

Ans.

Implementation of EHS at site involves creating policies, conducting training, performing audits, and ensuring compliance.

  • Developing and implementing EHS policies and procedures

  • Conducting regular safety training for employees

  • Performing site audits to identify hazards and risks

  • Ensuring compliance with local regulations and company standards

  • Encouraging a culture of safety and reporting near misses or incidents

Add your answer

Q80. Types of paints, tiles.

Ans.

Types of paints and tiles commonly used in construction projects.

  • Types of paints: acrylic, latex, oil-based, enamel, spray paint

  • Types of tiles: ceramic, porcelain, glass, natural stone, mosaic

Add your answer

Q81. What is voltage

Ans.

Voltage is the electric potential difference between two points in an electrical circuit.

  • Voltage is a measure of the force that pushes electric charge through a circuit.

  • It is measured in volts (V) and represents the potential energy per unit charge.

  • Voltage can be thought of as the pressure or intensity of the electric field.

  • Higher voltage means more potential energy and greater ability to do work.

  • For example, a battery provides a voltage difference that allows current to flow...read more

Add your answer

Q82. Risk assessment for hazards

Ans.

Risk assessment for hazards involves identifying, evaluating, and prioritizing potential risks to prevent accidents and injuries.

  • Identify potential hazards in the workplace

  • Evaluate the likelihood and severity of each hazard

  • Prioritize risks based on the level of risk and potential impact

  • Implement control measures to mitigate or eliminate hazards

  • Regularly review and update risk assessments

Add your answer

Q83. Define project life cycle

Ans.

Project life cycle is the series of phases a project goes through from initiation to closure.

  • Initiation: Define project scope, objectives, and feasibility.

  • Planning: Develop project plan, schedule, and budget.

  • Execution: Implement project plan and deliverables.

  • Monitoring and Controlling: Track progress, manage changes, and ensure quality.

  • Closure: Finalize project, hand off deliverables, and evaluate success.

Add your answer

Q84. Present a sales pitch

Ans.

I would present a sales pitch highlighting the unique features and benefits of our product/service to address the client's needs.

  • Start by identifying the client's pain points and needs

  • Highlight the unique features and benefits of our product/service that address those needs

  • Provide examples of successful implementations or case studies

  • Offer a special promotion or discount to incentivize the client to make a decision

  • End with a strong call to action to encourage the client to ta...read more

Add your answer

Q85. Projects involved

Ans.

I have worked on various projects including commercial buildings, residential complexes, and industrial facilities.

  • Commercial building construction

  • Residential complex development

  • Industrial facility upgrades

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at null

based on 48 interviews in the last 1 year
Interview experience
4.4
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.1
 • 2.2k Interview Questions
4.0
 • 816 Interview Questions
3.5
 • 643 Interview Questions
3.9
 • 256 Interview Questions
3.8
 • 144 Interview Questions
3.8
 • 140 Interview Questions
View all
Top Sobha Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter