posted on 13 Jun 2024
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Basic questions only
Tests to check concrete flow include slump test, flow table test, and V-funnel test.
Slump test measures the consistency and workability of concrete by determining the slump of a sample.
Flow table test evaluates the flow of concrete by measuring the diameter of the concrete spread on a flow table.
V-funnel test assesses the flowability of concrete by measuring the time it takes for the concrete to flow through a funnel.
posted on 16 Oct 2023
I applied via LinkedIn and was interviewed in Apr 2023. There were 3 interview rounds.
30 Questions Aptitude test,passing marks required for first round of interview
Top trending discussions
posted on 27 May 2024
I applied via Walk-in
Site work involves preparing the construction site for building, including clearing, grading, and excavation.
Clearing the site of any existing structures or debris
Grading the land to ensure proper drainage and foundation stability
Excavating for foundations, utilities, and other underground structures
Installing erosion control measures to prevent soil erosion
Preparing access roads and parking areas for construction vehi...
based on 2 interviews
Interview experience
Senior Engineer
511
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Project Engineer
469
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
341
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Deputy Manager
201
salaries
| ₹5 L/yr - ₹11 L/yr |
Civil Site Engineer
200
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
DLF
Godrej Properties
Prestige Group
Brigade Group