Upload Button Icon Add office photos

Filter interviews by

Sivanssh Infrastructure Development Site Engineer Interview Questions and Answers for Experienced

Updated 30 Aug 2022

Sivanssh Infrastructure Development Site Engineer Interview Experiences for Experienced

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Aug 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Why was you left your Last company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared by online YouTube session . By different experience people

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is the tolerance in column checking?
  • Ans. 

    The tolerance in column checking refers to the acceptable deviation from the specified dimensions or alignment.

    • Tolerance is usually specified in the project specifications or codes.

    • It is important to ensure that the column is within the specified tolerance to ensure structural integrity.

    • Tolerance can vary depending on the type of column and its location in the structure.

    • For example, a column supporting a heavy load may...

  • Answered by AI
  • Q2. 1mm to 2mm

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic practical knowledge Question of civil engineering.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution

Interview Questionnaire 

4 Questions

  • Q1. What was your roles and responsibilities in previous organisation.
  • Ans. 

    In my previous organization, I was responsible for various roles and responsibilities as a Site Engineer Mechanical.

    • Supervised and managed mechanical construction activities on site.

    • Ensured compliance with project specifications and quality standards.

    • Coordinated with contractors, suppliers, and other stakeholders.

    • Performed inspections and tests to ensure proper installation and functioning of mechanical systems.

    • Prepare...

  • Answered by AI
  • Q2. How many man power or team you controlled at a time
  • Ans. 

    I have managed teams of up to 20 individuals in my previous role as a Site Engineer Mechanical.

    • Managed a team of 20 workers on a construction site

    • Coordinated and supervised their tasks to ensure smooth operations

    • Provided guidance and support to team members when needed

    • Ensured adherence to safety protocols and project deadlines

    • Maintained effective communication with team members and other stakeholders

  • Answered by AI
  • Q3. Explain Isometric and P&ID drawing.
  • Ans. 

    Isometric drawing shows a 3D view of piping while P&ID shows the process flow and equipment layout.

    • Isometric drawing is used to represent a 3D view of piping and its components.

    • P&ID drawing shows the process flow and equipment layout in a plant.

    • Isometric drawing is used for fabrication and installation purposes.

    • P&ID drawing is used for design, operation, and maintenance purposes.

    • Isometric drawing shows the dimensions a...

  • Answered by AI
  • Q4. What's your perception about MS.
  • Ans. 

    MS refers to Microsoft, a multinational technology corporation.

    • MS is known for its software products like Windows, Office, and Azure.

    • Microsoft is also involved in hardware production, such as Xbox gaming consoles and Surface devices.

    • The company has a strong presence in the technology industry and is known for its innovation and research.

    • Microsoft has a wide range of services and solutions for businesses and individuals...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your close view prior to interview, what you had done previously. Try to be genuine and straight as much as possible during interview.

I applied via Naukri.com and was interviewed before Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is the tolerance in column checking?
  • Ans. 

    The tolerance in column checking refers to the acceptable deviation from the specified dimensions or alignment.

    • Tolerance is usually specified in the project specifications or codes.

    • It is important to ensure that the column is within the specified tolerance to ensure structural integrity.

    • Tolerance can vary depending on the type of column and its location in the structure.

    • For example, a column supporting a heavy load may...

  • Answered by AI
  • Q2. 1mm to 2mm

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic practical knowledge Question of civil engineering.

Sivanssh Infrastructure Development Interview FAQs

How many rounds are there in Sivanssh Infrastructure Development Site Engineer interview for experienced candidates?
Sivanssh Infrastructure Development interview process for experienced candidates usually has 2 rounds. The most common rounds in the Sivanssh Infrastructure Development interview process for experienced candidates are Resume Shortlist and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

J&F Interview Questions
3.8
 • 29 Interviews
Eversendai Interview Questions
3.9
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all
Sivanssh Infrastructure Development Site Engineer Salary
based on 7 salaries
₹2.5 L/yr - ₹3.9 L/yr
20% less than the average Site Engineer Salary in India
View more details
Accountant
7 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Site Engineer
7 salaries
unlock blur

₹2.5 L/yr - ₹3.9 L/yr

Junior Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹1.1 L/yr - ₹4 L/yr

Senior Engineer
4 salaries
unlock blur

₹3.6 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Sivanssh Infrastructure Development with

CTS Consulting & Technical Support

3.8
Compare

Patel Infrastructure

3.9
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview