Filter interviews by
I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
posted on 20 Dec 2020
posted on 29 Jan 2021
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete ...
posted on 1 Oct 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
posted on 30 Aug 2021
I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.
posted on 20 Dec 2023
The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.
Density of RCC is influenced by the type and proportion of materials used.
Common density range for RCC is 2200 to 2500 kg/m^3.
Higher density indicates stronger and more durable RCC structure.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Works Engineer
110
salaries
| ₹3.7 L/yr - ₹8 L/yr |
Civil Engineer
71
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Assistant Manager
19
salaries
| ₹7 L/yr - ₹12.5 L/yr |
Account Assistant
15
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Deputy General Manager
14
salaries
| ₹18 L/yr - ₹26 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon