I appeared for an interview in Feb 2023.
FAR stands for Floor Area Ratio, which is the ratio of a building's total floor area to the size of the piece of land on which it is built. Floor area refers to the total area of a floor in a building, carpet area is the area within the walls, and built-up area includes carpet area plus the thickness of walls.
FAR (Floor Area Ratio) is the ratio of a building's total floor area to the size of the land it is built on.
Flo...
I applied via Walk-in and was interviewed in Jan 2023. There were 4 interview rounds.
I applied via YouTube Naukariwala channel and was interviewed in Oct 2022. There were 4 interview rounds.
National Projects Construction Corporation interview questions for popular designations
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
All documents verification, diploma certificate questions, site experience question,BBS making, cube and slump size and testing, cement and steel cutting length, building starting and finishing questions, footings size, building use steel weight,etc.
Which buildings have been completed and where.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
posted on 23 Dec 2022
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
based on 8 interviews
Interview experience
based on 69 reviews
Rating in categories
Site Engineer
21
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Civil Site Engineer
17
salaries
| ₹4 L/yr - ₹5.4 L/yr |
Senior Associate
12
salaries
| ₹4.2 L/yr - ₹5 L/yr |
Senior Engineer
6
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Senior Manager
6
salaries
| ₹13.2 L/yr - ₹75 L/yr |
L&T Construction
AECOM
AtkinsRealis
Saipem