I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.
Top trending discussions
posted on 26 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
Planning in construction involves creating a detailed roadmap for the project from start to finish.
It involves identifying the scope of work and setting project goals
Creating a timeline and schedule for the project
Allocating resources and determining budget
Identifying potential risks and developing contingency plans
Coordinating with stakeholders and ensuring compliance with regulations
Examples include creating a constr...
posted on 3 Nov 2023
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
Selection of a cable involves considering factors like voltage rating, current carrying capacity, insulation material, and environmental conditions.
Determine the voltage rating required for the application.
Calculate the current carrying capacity needed based on the load.
Select the appropriate size and type of cable based on the current rating.
Consider the insulation material suitable for the environment (e.g. PVC, XLPE...
Load factor is the ratio of the average load to the maximum load that a system can handle.
Load factor is calculated by dividing the average load by the maximum load capacity.
It is used to measure the efficiency of a system or equipment in handling varying loads.
For example, a power plant with a load factor of 0.8 means it is operating at 80% of its maximum capacity.
The tertiary winding in a power transformer is important for providing a path for zero-sequence currents and reducing harmonics.
Provides a path for zero-sequence currents, which helps in balancing the three-phase system
Reduces harmonics in the system, improving power quality
Helps in limiting fault currents and improving the overall efficiency of the transformer
To check if a lightning arrestor is working fine, you can perform visual inspections, check for physical damage, test for continuity, and monitor surge protection levels.
Perform visual inspections for any signs of physical damage or wear
Check for loose connections or corrosion on the lightning arrestor
Test for continuity using a multimeter to ensure proper electrical connection
Monitor surge protection levels to ensure ...
posted on 18 Apr 2023
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
posted on 26 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
Planning in construction involves creating a detailed roadmap for the project from start to finish.
It involves identifying the scope of work and setting project goals
Creating a timeline and schedule for the project
Allocating resources and determining budget
Identifying potential risks and developing contingency plans
Coordinating with stakeholders and ensuring compliance with regulations
Examples include creating a constr...
posted on 4 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
I applied via Other and was interviewed in Mar 2018. There were 5 interview rounds.
QA focuses on preventing defects, while QC focuses on identifying and fixing defects.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards.
QC is a reactive process that focuses on identifying and fixing defects through inspections and testing.
QA involves activities like creating test plans, conducting audits...
Defects in welding are imperfections or flaws that occur during the welding process.
Common defects include porosity, undercutting, incomplete fusion, and cracks.
Porosity is caused by gas entrapment and can be mitigated by using proper shielding gas and cleaning the base metal.
Undercutting is a groove formation at the weld toe and can be reduced by adjusting welding parameters.
Incomplete fusion occurs when the weld meta...
Works Engineer
108
salaries
| ₹3.5 L/yr - ₹7.6 L/yr |
Civil Engineer
69
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Assistant Manager
18
salaries
| ₹9 L/yr - ₹12.5 L/yr |
Civil Site Engineer
17
salaries
| ₹2 L/yr - ₹7 L/yr |
Deputy General Manager
16
salaries
| ₹17 L/yr - ₹27 L/yr |
Rail Vikas Nigam
NBCC
Engineers India
Mecon