Tests to be conducted before charging of Power transformer
Insulation resistance test
Polarity and phase-relation test
Turns ratio test
Vector group test
Oil test
Functional test
Scheduled maintenance programs for TSS and PSS
TSS (Total Suspended Solids) requires regular cleaning of filters and monitoring of chemical levels
PSS (Particulate Suspended Solids) requires regular cleaning of filters and monitoring of pressure levels
Both TSS and PSS require regular calibration of instruments and replacement of worn out parts
Maintenance schedules may vary depending on the specific equipment and usage
Reg...
Charging current of transmission line varies based on the conditions - OH or UG.
Charging current is the current that flows through the capacitance of the transmission line.
In OH conditions, the charging current is higher due to the larger distance between the conductors and the ground.
In UG conditions, the charging current is lower due to the smaller distance between the conductors and the ground.
The charging current a...
Use advanced earthing techniques and equipment to accurately measure earth values in rocky areas.
Use specialized equipment like clamp-on ground resistance testers
Install additional grounding rods to improve accuracy
Consider using chemical electrodes for better contact with the ground
Ensure proper installation and maintenance of earthing system
Consult with experts in earthing and grounding for best practices
The standard of railway crossings for different voltage lines as per RDSO.
RDSO specifies different standards for railway crossings based on the voltage of the lines.
For 33 kV lines, the minimum height of the overhead equipment is 5.5 meters.
For 11 kV lines, the minimum height of the overhead equipment is 5 meters.
For 132 kV lines, the minimum height of the overhead equipment is 7 meters.
For 440 kV lines, the minimum he...
Differential potential of transformer is the voltage difference between the primary and secondary windings.
It is a measure of the transformer's ability to isolate the primary and secondary circuits.
It is important for safety and proper functioning of the transformer.
The differential potential is affected by the turns ratio and the insulation between the windings.
A high differential potential can cause arcing and damage...
SOP of RE projects involves defining project scope, identifying stakeholders, creating project plan, executing and monitoring progress.
Define project scope and objectives
Identify stakeholders and their requirements
Create project plan with timelines and milestones
Execute project plan and monitor progress
Manage risks and issues
Ensure quality control and compliance
Close out project and conduct lessons learned
Implement strict inventory management, conduct regular audits, and train employees on theft prevention and material handling.
Implement a strict inventory management system to keep track of all materials and equipment.
Conduct regular audits to identify any discrepancies or missing items.
Train employees on theft prevention techniques and proper material handling procedures.
Install security cameras and alarms to deter the...
Top trending discussions
I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
Yes, I am very interested in travelling across India.
Travelling across India would give me the opportunity to experience the diverse cultures and cuisines of different regions.
It would also help me understand the market and consumer behavior in different parts of the country.
I have already travelled to a few places in India such as Goa, Rajasthan, and Kerala and I am eager to explore more.
Travelling would also help me ...
I applied via Newspaper Ad and was interviewed in Aug 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
Some of the top questions asked at the Ircon International Manager interview -
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Works Engineer
110
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy General Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Account Assistant
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Rail Vikas Nigam
NBCC
Engineers India
Mecon