Tests to be conducted before charging of Power transformer
Insulation resistance test
Polarity and phase-relation test
Turns ratio test
Vector group test
Oil test
Functional test
Scheduled maintenance programs for TSS and PSS
TSS (Total Suspended Solids) requires regular cleaning of filters and monitoring of chemical levels
PSS (Particulate Suspended Solids) requires regular cleaning of filters and monitoring of pressure levels
Both TSS and PSS require regular calibration of instruments and replacement of worn out parts
Maintenance schedules may vary depending on the specific equipment and usage
Reg...
Charging current of transmission line varies based on the conditions - OH or UG.
Charging current is the current that flows through the capacitance of the transmission line.
In OH conditions, the charging current is higher due to the larger distance between the conductors and the ground.
In UG conditions, the charging current is lower due to the smaller distance between the conductors and the ground.
The charging current a...
Use advanced earthing techniques and equipment to accurately measure earth values in rocky areas.
Use specialized equipment like clamp-on ground resistance testers
Install additional grounding rods to improve accuracy
Consider using chemical electrodes for better contact with the ground
Ensure proper installation and maintenance of earthing system
Consult with experts in earthing and grounding for best practices
The standard of railway crossings for different voltage lines as per RDSO.
RDSO specifies different standards for railway crossings based on the voltage of the lines.
For 33 kV lines, the minimum height of the overhead equipment is 5.5 meters.
For 11 kV lines, the minimum height of the overhead equipment is 5 meters.
For 132 kV lines, the minimum height of the overhead equipment is 7 meters.
For 440 kV lines, the minimum he...
Differential potential of transformer is the voltage difference between the primary and secondary windings.
It is a measure of the transformer's ability to isolate the primary and secondary circuits.
It is important for safety and proper functioning of the transformer.
The differential potential is affected by the turns ratio and the insulation between the windings.
A high differential potential can cause arcing and damage...
SOP of RE projects involves defining project scope, identifying stakeholders, creating project plan, executing and monitoring progress.
Define project scope and objectives
Identify stakeholders and their requirements
Create project plan with timelines and milestones
Execute project plan and monitor progress
Manage risks and issues
Ensure quality control and compliance
Close out project and conduct lessons learned
Implement strict inventory management, conduct regular audits, and train employees on theft prevention and material handling.
Implement a strict inventory management system to keep track of all materials and equipment.
Conduct regular audits to identify any discrepancies or missing items.
Train employees on theft prevention techniques and proper material handling procedures.
Install security cameras and alarms to deter the...
Top trending discussions
I applied via Internshala and was interviewed in May 2024. There were 2 interview rounds.
Very analytical and time consuming. hard
This job is needed to ensure effective leadership, decision-making, and coordination of tasks within the team.
To provide direction and guidance to team members
To make strategic decisions for the success of the team
To coordinate tasks and ensure efficient workflow
To handle challenges and conflicts within the team
To drive performance and achieve goals
I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
Some of the top questions asked at the Ircon International Manager interview -
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Works Engineer
105
salaries
| ₹3.7 L/yr - ₹8 L/yr |
Civil Engineer
69
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Assistant Manager
18
salaries
| ₹9 L/yr - ₹12.5 L/yr |
Civil Site Engineer
17
salaries
| ₹2 L/yr - ₹7 L/yr |
Deputy General Manager
16
salaries
| ₹17 L/yr - ₹27 L/yr |
Rail Vikas Nigam
NBCC
Engineers India
Mecon