Upload Button Icon Add office photos

Filter interviews by

Silpa Projects & Infrastructure Interview Questions and Answers

Updated 10 Oct 2021

Silpa Projects & Infrastructure Interview Experiences

1 interview found

I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Generally all questions were technically inclined towards practical experience. One with good knowledge in site can easily clear the interview.
  • Q2. How do we analysis the section of a drawing.
  • Ans. 

    Section of a drawing can be analyzed by understanding the symbols, dimensions, and annotations used in it.

    • Identify the scale of the drawing

    • Understand the symbols used for different elements

    • Check the dimensions and annotations for accuracy

    • Compare the section with other related drawings

    • Consult with the design team for clarification

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Petty good and formal about 20mins, where I've been tested on my technical, intellectual and characteristic ideas.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(4 Questions)

  • Q1. What is your strength?
  • Ans. 

    My strengths include excellent communication skills, attention to detail, and ability to multitask effectively.

    • Excellent communication skills - able to effectively communicate with clients, colleagues, and management

    • Attention to detail - meticulous in ensuring accuracy in tasks and documentation

    • Ability to multitask effectively - able to prioritize and manage multiple tasks simultaneously

    • Strong organizational skills - a...

  • Answered by AI
  • Q2. What is your weakness
  • Ans. 

    My greatest weakness is that I tend to be overly critical of my own work, which can sometimes lead to perfectionism.

    • I have a tendency to spend too much time on tasks to ensure they are perfect

    • I can be overly self-critical and have high expectations for myself

    • I am working on finding a balance between striving for excellence and accepting imperfection

  • Answered by AI
  • Q3. Previous experience
  • Q4. Personal details

Interview Preparation Tips

Interview preparation tips for other job seekers - Great work environment.....If you got a opportunity working with mangalam team your lucky...n go ahead
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. You can interview technical questions
  • Q2. You can interview sone technical questions
Round 2 - HR 

(1 Question)

  • Q1. Can you sellary give me
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell about yourself
  • Q2. How can you handle challenges.
Round 2 - HR 

(2 Questions)

  • Q1. Genera discussion
  • Q2. Leadership question
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2020. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your reasons for wanting to change your current company?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more dynamic work environment.

    • Desire for professional growth and development

    • Seeking new challenges and projects to work on

    • Looking for a more dynamic and innovative work environment

    • Opportunity to learn new skills and technologies

    • Desire for better work-life balance

  • Answered by AI
  • Q2. How many years of experience do you have in building construction?
  • Ans. 

    I have 5 years of experience in building construction.

    • I have worked on various residential and commercial projects.

    • Managed construction teams and ensured projects were completed on time and within budget.

    • Experience with reading blueprints, conducting site inspections, and coordinating with architects and subcontractors.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is compressive strength?
  • Ans. 

    Compressive strength is the ability of a material to withstand loads that reduce the size of the material without undergoing any deformation.

    • Compressive strength is a measure of the maximum load a material can withstand under compression before failure.

    • It is an important property in construction materials like concrete, masonry, and rock.

    • Compressive strength is typically measured in units of force per unit area, such a...

  • Answered by AI
  • Q2. Density of steel
  • Ans. 

    Density of steel is approximately 7850 kg/m^3.

    • Density of steel is typically around 7850 kg/m^3.

    • The density of steel can vary slightly depending on the specific alloy.

    • Density is an important factor in determining the weight of steel structures.

  • Answered by AI
  • Q3. How many days curing at column
  • Ans. 

    Curing of columns typically takes 7 days.

    • Columns generally require 7 days of curing to achieve the desired strength.

    • Curing helps in reducing cracks and increasing the durability of the concrete.

    • Proper curing is essential for the long-term performance of the column.

    • Factors like temperature, humidity, and type of concrete used can affect the curing time.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Civil Site Engineer interview:
  • Project Management
Interview preparation tips for other job seekers - Technical and professional communication is must
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is triggers and async operation ?
  • Ans. 

    Triggers are actions that are automatically performed when a certain event occurs in a database. Async operations are tasks that run independently of the main program flow.

    • Triggers in databases are used to maintain data integrity and automate tasks based on specified conditions.

    • Async operations in programming allow tasks to be executed concurrently without blocking the main program flow.

    • Examples of async operations inc...

  • Answered by AI
  • Q2. Write a trigger on object realted to account and contact
  • Ans. 

    Create a trigger on an object related to Account and Contact

    • Use the 'trigger' keyword to start the trigger

    • Specify the object you want to create the trigger on (e.g. Account)

    • Include logic to handle the related Contact object (e.g. querying related contacts)

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Scenario based question were asked

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well what u have mention on cv

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About last company and salaries
Round 2 - One-on-one 

(2 Questions)

  • Q1. About yourself and communication
  • Q2. Executive mock cal
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Tell about your self
  • Q2. What would happen if support removed at pourstrip
  • Ans. 

    The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.

    • Loss of structural integrity in packaging

    • Increased risk of contamination or tampering

    • Difficulty in handling and storage of products

    • Potential impact on product shelf life and quality

    • Need for alternative support measures or redesign of packaging

  • Answered by AI
  • Q3. When will do concreate in pourstrip
  • Ans. 

    Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.

    • Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.

    • Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.

    • The timing of pour strips will depend on the size and complexity of the pr...

  • Answered by AI
  • Q4. How can u mange shuttering without removing supports under slab and pourstrip
  • Ans. 

    Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.

    • Use adjustable props to support the slab and pourstrip while removing the shuttering.

    • Install beams to transfer the load from the slab to the props, allowing the supports to be removed.

    • Ensure proper alignment and spacing of props and beams to distribute the load evenly.

    • Regularly check and adjust the props and...

  • Answered by AI
  • Q5. Tell about ur previous project and what challenges you faced
Round 3 - Technical 

(2 Questions)

  • Q1. Tell about ur previoud sites in previous company and what is the challenges u faced while doing concreate and what did u give solution to engineer
  • Q2. What checks do u do while doing in concrete and how will do in column and slab junction
  • Ans. 

    Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.

    • Perform slump test to ensure proper consistency of concrete

    • Check air content to ensure proper durability and workability

    • Monitor temperature to prevent issues like thermal cracking

    • At column and slab junction, check reinforcement p...

  • Answered by AI
Round 4 - HR 

(4 Questions)

  • Q1. Tell about ur family background
  • Q2. What is your present salary and what is your expectation salary
  • Q3. When will you join in our organisation
  • Q4. Why r u changing job

Interview Preparation Tips

Topics to prepare for Vensa Infrastructure Quality Controller interview:
  • Post tension
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. HR Ask my whol carrier back gound from education to last job
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Just self introduction

Round 2 - One-on-one 

(1 Question)

  • Q1. About yourself and introduce yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview can be cracked easily, no scope for technical skill development

Silpa Projects & Infrastructure Interview FAQs

How to prepare for Silpa Projects & Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Silpa Projects & Infrastructure. The most common topics and skills that interviewers at Silpa Projects & Infrastructure expect are Contract Management, Project Scheduling, Boq Preparation, Communication Skills and MS Project.
What are the top questions asked in Silpa Projects & Infrastructure interview?

Some of the top questions asked at the Silpa Projects & Infrastructure interview -

  1. How do we analysis the section of a drawin...read more
  2. Generally all questions were technically inclined towards practical experience....read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Silpa Projects & Infrastructure interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 401 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.4
 • 18 Interviews
View all

Silpa Projects & Infrastructure Reviews and Ratings

based on 8 reviews

2.6/5

Rating in categories

2.4

Skill development

3.0

Work-Life balance

2.2

Salary & Benefits

4.2

Job Security

2.2

Company culture

2.7

Promotions/Appraisal

2.4

Work Satisfaction

Explore 8 Reviews and Ratings
Civil Site Engineer
5 salaries
unlock blur

₹1.2 L/yr - ₹2.4 L/yr

Quantity Surveyor
5 salaries
unlock blur

₹1.8 L/yr - ₹3.5 L/yr

HR Manager
4 salaries
unlock blur

₹3 L/yr - ₹3 L/yr

General Manager Finance
4 salaries
unlock blur

₹15 L/yr - ₹21.8 L/yr

Accountant
3 salaries
unlock blur

₹1.8 L/yr - ₹2.5 L/yr

Explore more salaries
Compare Silpa Projects & Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview