Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Shyam Steel Industries Team. If you also belong to the team, you can get access from here

Shyam Steel Industries Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Shyam Steel Industries Interview Questions, Process, and Tips

Updated 1 Mar 2025

Top Shyam Steel Industries Interview Questions and Answers

View all 38 questions

Shyam Steel Industries Interview Experiences

Popular Designations

54 interviews found

I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the Ductility ? => Ductility is a one type materials, can sustain plastic deformation long time before failure of the structure . this is a tensile strees acting of the structure.
  • Ans. 

    Ductility is the ability of a material to deform under tensile stress without breaking.

    • Ductility is a property of metals and alloys.

    • It is measured by the amount of deformation a material can undergo before it fractures.

    • Ductile materials are used in construction, such as steel and aluminum.

    • Ductility is important in manufacturing processes like forging and rolling.

    • It is the opposite of brittleness, which is the tendency

  • Answered by AI
  • Q2. What is the name of slum cone test Apparatus ? And size inverted slum ? => frustum cone. Bottom=200mm. Height=300mm , top =100mm
  • Ans. 

    The name of the slum cone test apparatus is frustum cone. The size of the inverted slum is bottom=200mm, height=300mm, top=100mm.

    • The frustum cone is used to determine the workability of concrete.

    • It is also known as the Abrams cone.

    • The inverted slum is measured by filling the cone with concrete and lifting it up to see how much the concrete slumps.

    • The frustum cone is commonly used in construction and civil engineering.

    • T...

  • Answered by AI
  • Q3. What is IST of aggregate ? => we know generally ist of opc cement is 30 min..and agregate ist mean..a batching plant mixing to placing away site traveling which time transit mixer vehicles. Generally cons...
  • Ans. 

    IST of aggregate is the time taken for the concrete mixture to set and harden.

    • IST stands for Initial Setting Time.

    • It is the time taken for the concrete mixture to set and harden.

    • The IST of aggregate is generally considered to be around 1 hour or 60 minutes.

    • IST of OPC cement is 30 minutes.

    • Transit mixer vehicles are used to transport the concrete mixture from the batching plant to the construction site.

  • Answered by AI
  • Q4. What is ingredients of shaym steel ? =>
  • Ans. 

    Shaym Steel is made of high-quality raw materials including iron ore, coal, and limestone.

    • Shaym Steel is made using the blast furnace process

    • The raw materials used in Shaym Steel include iron ore, coal, and limestone

    • The iron ore is melted in the furnace and impurities are removed to create steel

    • The coal is used as a fuel source to heat the furnace

    • The limestone is used as a flux to remove impurities from the steel

    • Shaym ...

  • Answered by AI
  • Q5. What is M20 ratio ? => cement: sand(f.a):agregate (ca) 1 part : 1.5 part : 3 part
  • Ans. 

    M20 ratio is a mix design ratio used for concrete construction, consisting of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • M20 ratio is commonly used for moderate strength concrete construction.

    • The ratio is expressed in terms of volume, not weight.

    • The strength of the concrete depends on the quality of materials used and the water-cement ratio.

    • Other common mix design ratios include M15, M25, and M30.

    • M20 ratio is...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If your knowledge about your college or academic , thats enough 🙏

Technical and Marketing Manager Interview Questions asked at other Companies

Q1. What is IST of aggregate ? => we know generally ist of opc cement is 30 min..and agregate ist mean..a batching plant mixing to placing away site traveling which time transit mixer vehicles. Generally consider near about 1 hour or 60 min ... read more
View answer (1)

Site Accountant Interview Questions & Answers

user image SRIMANTA GHOSH

posted on 5 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - One-on-one 

(7 Questions)

  • Q1. Can I handle project site accounts
  • Q2. How to handle petty cash
  • Ans. 

    Petty cash should be handled with strict controls and proper documentation.

    • Designate a specific amount for petty cash and keep it in a secure location.

    • Create a petty cash log to track all transactions and receipts.

    • Require receipts for all petty cash expenses and reconcile regularly.

    • Limit access to petty cash and designate one person responsible for managing it.

    • Periodically audit the petty cash fund to ensure accuracy a

  • Answered by AI
  • Q3. How to check invoice
  • Ans. 

    To check an invoice, verify the details against the purchase order and receipt of goods.

    • Compare the invoice details with the purchase order to ensure accuracy.

    • Check the quantities and prices on the invoice against the receipt of goods.

    • Verify that the invoice includes all necessary information such as vendor details, invoice number, and payment terms.

    • Ensure that any discounts or credits are applied correctly.

    • Confirm tha...

  • Answered by AI
  • Q4. How to payment made
  • Ans. 

    Payments are typically made through various methods such as checks, wire transfers, online payments, or cash.

    • Payments can be made via checks, where the payer writes a check to the payee.

    • Wire transfers involve electronically transferring funds from one bank account to another.

    • Online payments can be made through platforms like PayPal, credit/debit cards, or mobile payment apps.

    • Cash payments are made in physical currency,...

  • Answered by AI
  • Q5. GST knowledge
  • Q6. SAP knowledge
  • Q7. ERP knowledge
Round 2 - HR 

(2 Questions)

  • Q1. How many years experience
  • Ans. 

    I have 5 years of experience working as an accountant in various industries.

    • 5 years of experience as an accountant

    • Worked in various industries

    • Familiar with different accounting practices and systems

  • Answered by AI
  • Q2. Privious company salary
Round 3 - Aptitude Test 

Skilled check, communication skills check

Interview Preparation Tips

Interview preparation tips for other job seekers - In interview time control your mand.

Site Accountant Interview Questions asked at other Companies

Q1. What is TDS rate and Section which you know very well
View answer (1)
Shyam Steel Industries Interview Questions and Answers for Freshers
illustration image

Shift Incharge Interview Questions & Answers

user image Bappaditya Jana

posted on 1 Mar 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I was interviewed before Mar 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the process for calculating yield?
  • Ans. 

    Yield is calculated by dividing the output by the input and multiplying by 100 to get a percentage.

    • Yield = (Output / Input) * 100

    • Input can be raw materials, components, or resources used in production

    • Output can be finished products, units produced, or services rendered

    • For example, if 100 units are input and 90 units are output, the yield would be (90/100) * 100 = 90%

  • Answered by AI
  • Q2. What is the procedure for lighting up?
  • Ans. 

    The procedure for lighting up involves following safety protocols and using appropriate equipment.

    • Ensure the area is well-ventilated before lighting up

    • Use a lighter or matchstick to ignite the flame

    • Always light up away from flammable materials

    • Dispose of used matches or lighters properly

    • In case of gas stoves, turn on the gas knob before lighting up

  • Answered by AI
  • Q3. What is the temperature maintenance process during the lighting up procedure?
  • Ans. 

    Temperature maintenance during lighting up procedure is crucial for safety and efficiency.

    • Ensure proper ventilation to prevent overheating

    • Monitor temperature using thermometers or sensors

    • Adjust heating elements or cooling systems as needed

    • Regularly check and maintain equipment to prevent malfunctions

    • Follow manufacturer's guidelines for temperature control

    • Example: In a furnace lighting up procedure, ensure the temperatu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and maintain a positive attitude.

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)

Diploma Mechanical Engineer Interview Questions & Answers

user image Arghya Chakraborty

posted on 20 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What preparation need to be made for commissioning?
  • Ans. 

    Preparation for commissioning involves thorough testing, documentation, safety checks, and coordination.

    • Ensure all equipment is installed correctly and functioning properly

    • Conduct thorough testing to identify any issues or malfunctions

    • Prepare detailed documentation of equipment specifications, procedures, and safety protocols

    • Perform safety checks to ensure compliance with regulations and standards

    • Coordinate with variou...

  • Answered by AI
  • Q2. We use any industrial drawing?
  • Ans. 

    Yes, industrial drawings are essential for Diploma Mechanical Engineers to understand and communicate design specifications.

    • Industrial drawings are used to communicate design specifications, dimensions, and tolerances.

    • They are essential for manufacturing, assembly, and maintenance processes.

    • Examples include blueprints, CAD drawings, and technical sketches.

    • Understanding industrial drawings is crucial for interpreting en

  • Answered by AI

Diploma Mechanical Engineer Interview Questions asked at other Companies

Q1. What is the second law of thermodynamics?
View answer (14)

Shyam Steel Industries interview questions for popular designations

 Purchase Manager

 (2)

 HR Executive

 (2)

 Sales Officer

 (2)

 Senior Sales Officer

 (2)

 Sales Executive

 (2)

 Diploma Mechanical Engineer

 (2)

 Electrical Engineer

 (1)

 Assistant Manager

 (1)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Shyam steel company lunching date
  • Q2. Shyam steel company one day production limite
  • Q3. Shyam steel company one year tear limit
  • Q4. Shyam steel company is owner name
Round 2 - Technical 

(1 Question)

  • Q1. ITI related Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Apply job

ITI Electrician Interview Questions asked at other Companies

Q1. What is unit and how maser current and voltage ?
View answer (5)

Get interview-ready with Top Shyam Steel Industries Interview Questions

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What About You Know Hydraulic System
  • Ans. 

    I have extensive knowledge and experience working with hydraulic systems in various projects and operations.

    • Understanding of hydraulic principles and components such as pumps, cylinders, valves, and hoses

    • Ability to troubleshoot and diagnose issues with hydraulic systems

    • Experience in designing and implementing hydraulic systems for different applications

    • Knowledge of hydraulic fluid properties and maintenance practices

    • Fa

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What About You Know Project Management
  • Ans. 

    I have extensive experience in project management, including planning, execution, monitoring, and closing projects.

    • Certified in project management methodologies such as PMP or PRINCE2

    • Proficient in using project management tools like Microsoft Project or Asana

    • Skilled in creating project plans, defining scope, setting milestones, and managing resources effectively

    • Experienced in risk management, stakeholder communication,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - NA

Project and Operations Manager Interview Questions asked at other Companies

Q1. What About You Know Hydraulic System
View answer (1)

Jobs at Shyam Steel Industries

View all
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the current IT procurement process is getting followed in your current organisation
  • Q2. Some selective questions to test the candidate's IT procurement knowledge
Round 2 - One-on-one 

(3 Questions)

  • Q1. What strategy will you take when procuring 100 plus IT assets across pan India?
  • Ans. 

    I will implement a centralized procurement strategy to ensure consistency and cost-effectiveness.

    • Develop a detailed procurement plan outlining requirements, budget, timelines, and vendors.

    • Leverage economies of scale by negotiating bulk discounts with preferred vendors.

    • Implement a vendor management system to track performance and ensure compliance.

    • Utilize technology such as e-procurement platforms to streamline the proc...

  • Answered by AI
  • Q2. The notice period, Salary discussion
  • Q3. Ideas about the PO, PR, Blanket PO etc

IT Procurement Executive Interview Questions asked at other Companies

Q1. What strategy will you take when procuring 100 plus IT assets across pan India?
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Construction Purchase Process
Round 2 - HR 

(1 Question)

  • Q1. What is your notice period
  • Ans. 

    My notice period is one month.

    • My notice period is one month

    • I am required to give one month notice before leaving my current position

    • I need to serve a notice period of one month

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Lack Job security, be careful about this

Assistant Manager- Purchase Interview Questions asked at other Companies

Q1. Are u ready to working flexible time and also flexible location.
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Working principal of pump
  • Ans. 

    Pumps work by creating a pressure difference to move fluid from one place to another.

    • Pumps use mechanical energy to increase the pressure of a fluid and move it through a system

    • They can be classified into different types such as centrifugal pumps, positive displacement pumps, etc.

    • The working principle involves the conversion of mechanical energy into hydraulic energy

    • Examples include water pumps in buildings, fuel pumps

  • Answered by AI
  • Q2. What is working principal of cooling tower
  • Ans. 

    Cooling towers work on the principle of evaporative cooling to remove heat from a process or building.

    • Cooling towers use water as a cooling medium to absorb heat from a process or building.

    • The hot water is pumped to the top of the tower and distributed over the fill media.

    • As the water flows over the fill media, some of it evaporates, taking away heat and cooling the rest of the water.

    • The cooled water is then collected ...

  • Answered by AI
  • Q3. Pollution bag filter specifications
  • Ans. 

    Pollution bag filter specifications include material type, filtration efficiency, airflow capacity, and pressure drop.

    • Material type: Bag filters can be made of various materials such as polyester, polypropylene, or fiberglass.

    • Filtration efficiency: This indicates the percentage of particles the filter can capture. Higher efficiency filters are more effective but may have higher pressure drops.

    • Airflow capacity: The maxi...

  • Answered by AI
  • Q4. Softner water parameter
  • Q5. What is the formula of centrifugal pump head
  • Ans. 

    The formula for centrifugal pump head is H = (Q * SG) / (3.14 * D^2 * 2.31)

    • Head (H) is calculated using the flow rate (Q), specific gravity (SG), and diameter of the impeller (D)

    • The formula is derived from the basic equation for head in a centrifugal pump

    • Example: H = (100 gpm * 1.0) / (3.14 * 0.5^2 * 2.31) = 45.75 ft

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - To prepare technical question and answer

Mechanical Maintenance Engineer Interview Questions asked at other Companies

Q1. What is valve and its types What is coupling and it's types Pump and its types What is Backlash Gears and it's types What is least count and least count of vernier and micrometer and how to find it. Which type of pump is centrifugal. What i... read more
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Present job & about company
  • Q2. Personel verification & job procy

Business Development Executive Interview Questions asked at other Companies

Q1. scenario based: if I am a teacher in a government school and my child is getting +90% marks, then why should i buy byjus course
View answer (14)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. How will you develop the sales?
  • Q2. How many dealers you will appoint?
  • Q3. What increases in your salary do you want
  • Q4. How much fruitful you will be for the company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about giving your commitments.

Senior Sales Officer Interview Questions asked at other Companies

Q1. Bcg matrix Hawthrone experiment How long you can work with us. Are you available for pan india. Why do you want to work with us.
View answer (17)
Contribute & help others!
anonymous
You can choose to be anonymous

Shyam Steel Industries Interview FAQs

How many rounds are there in Shyam Steel Industries interview?
Shyam Steel Industries interview process usually has 2 rounds. The most common rounds in the Shyam Steel Industries interview process are HR, Technical and One-on-one Round.
How to prepare for Shyam Steel Industries interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shyam Steel Industries. The most common topics and skills that interviewers at Shyam Steel Industries expect are Retail Sales, Sales, Dealer Sales, Government Sales and Marketing.
What are the top questions asked in Shyam Steel Industries interview?

Some of the top questions asked at the Shyam Steel Industries interview -

  1. What is IST of aggregate ? => we know generally ist of opc cement is 30 min..a...read more
  2. What is the Ductility ? => Ductility is a one type materials, can sustain pl...read more
  3. What is the name of slum cone test Apparatus ? And size inverted slum ? => frus...read more
How long is the Shyam Steel Industries interview process?

The duration of Shyam Steel Industries interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

Accentuate Technology

No Interviews

INTERVIEWS

Gujarat Ambuja Exports

No Interviews

INTERVIEWS

HSBC Software Development

No Interviews

INTERVIEWS

HSBC Software Development

No Interviews

INTERVIEWS

Shyam Steel Industries

No Interviews

INTERVIEWS

Gujarat Ambuja Exports

No Interviews

INTERVIEWS

HSBC Software Development

No Interviews

INTERVIEWS

Gujarat Ambuja Exports

No Interviews

INTERVIEWS

Gujarat Ambuja Exports

No Interviews

Tell us how to improve this page.

Shyam Steel Industries Interview Process

based on 73 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 857 Interviews
JSW Steel Interview Questions
3.9
 • 591 Interviews
Jindal Stainless Interview Questions
4.2
 • 206 Interviews
ESL Steel Interview Questions
4.0
 • 31 Interviews
ArcelorMittal Interview Questions
4.1
 • 29 Interviews
Vizag Steel Interview Questions
4.1
 • 28 Interviews
View all

Fast track your campus placements

View all

Shyam Steel Industries Reviews and Ratings

based on 703 reviews

3.5/5

Rating in categories

3.2

Skill development

3.4

Work-life balance

3.5

Salary

3.2

Job security

3.3

Company culture

3.1

Promotions

3.1

Work satisfaction

Explore 703 Reviews and Ratings
Web Consultant

Kolkata

1-3 Yrs

Not Disclosed

Web Consultant

Kolkata

0-1 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
82 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Officer
80 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Area Sales Manager
53 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Marketing Executive
51 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Shyam Steel Industries with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview