Upload Button Icon Add office photos

Filter interviews by

Shri Balaji Buildmate Senior Civil Engineer Interview Questions, Process, and Tips

Updated 22 Jun 2024

Shri Balaji Buildmate Senior Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What is the master ring
  • Ans. 

    The master ring is a key component in a pile foundation system used to transfer the load from the superstructure to the piles.

    • The master ring is typically made of steel and is placed on top of the pile cap.

    • It helps distribute the load evenly among the piles in the foundation.

    • The master ring also helps in providing stability and strength to the overall structure.

    • It is an important element in ensuring the structural inte

  • Answered by AI
  • Q2. What is the main bar in slab
  • Ans. 

    Main bar in slab is the primary reinforcement bar used to support the load in a concrete slab.

    • Main bar in slab is typically placed in the bottom layer of the slab to resist tensile forces.

    • It is usually larger in diameter compared to distribution bars to provide additional strength.

    • Main bars are spaced closer together near supports and openings for increased load-bearing capacity.

    • Examples of main bars in slab include re

  • Answered by AI
  • Q3. What is main part of building
  • Ans. 

    The main part of a building is its foundation.

    • The foundation provides structural support and stability to the building.

    • It distributes the weight of the building and prevents settling or shifting.

    • Examples of foundation types include shallow foundations, deep foundations, and pile foundations.

  • Answered by AI
  • Q4. What is the waterproofing
  • Ans. 

    Waterproofing is a method or process used to prevent water from penetrating a structure or material.

    • Waterproofing can be achieved through the use of materials such as membranes, coatings, and sealants.

    • It is important in construction to prevent water damage to buildings and infrastructure.

    • Examples of waterproofing methods include applying waterproof membranes to basements, roofs, and foundations.

    • Proper waterproofing can...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formane finishing wark

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What are the basic details of your past job profile?
  • Ans. 

    I have worked as a Senior Civil Engineer for the past 5 years, overseeing various construction projects.

    • Managed a team of engineers and construction workers

    • Designed and implemented structural plans for buildings and infrastructure

    • Ensured compliance with building codes and regulations

    • Collaborated with architects, contractors, and clients to achieve project goals

  • Answered by AI
  • Q2. What was your current Cost to Company (CTC) in your previous job profile?
  • Ans. 

    My previous CTC was $80,000 per annum.

    • My previous CTC was $80,000 per annum.

    • It included base salary, bonuses, and benefits.

    • I also received performance incentives based on project completion.

    • The CTC was competitive within the industry.

    • I negotiated my CTC during the hiring process.

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is your basic knowledge of civil construction and materials?
  • Ans. 

    Basic knowledge of civil construction and materials includes understanding of construction methods, materials used, and quality control processes.

    • Understanding of different construction methods such as reinforced concrete, steel frame, and timber frame

    • Knowledge of common construction materials like concrete, steel, and wood

    • Familiarity with quality control processes to ensure structural integrity and safety

    • Awareness of ...

  • Answered by AI
  • Q2. What is the process for completing the execution of civil construction work?
  • Ans. 

    The process for completing the execution of civil construction work involves planning, mobilization, construction, and handover.

    • Planning phase involves creating detailed project plans, schedules, and budgets.

    • Mobilization phase includes setting up the construction site, procuring materials, and hiring labor.

    • Construction phase involves executing the actual construction work according to the plans and specifications.

    • Hando...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are the final CTC discussions, terms and conditions, perks, and benefits associated with the position?
  • Q2. What is the typical joining period and the timeline for receiving the offer letter?
  • Ans. 

    Typical joining period and offer letter timeline vary depending on company policies and individual circumstances.

    • Joining period can range from 1-3 months after accepting the offer.

    • Offer letter timeline usually within 1-2 weeks after the final interview.

    • Some companies may expedite the process for urgent positions.

    • Individual circumstances such as notice period at current job can also affect joining period.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Total experience detail documents & educational, residential proof documents
  • Q2. Current CTC document& expected CTc
  • Ans. 

    The candidate should provide their current CTC document and expected CTC.

    • The candidate should have a current CTC document that shows their current salary.

    • The candidate should also provide their expected CTC, which is the salary they are looking for in the new position.

    • The expected CTC should be based on factors such as the candidate's experience, skills, and the market rate for the position.

    • The candidate can mention an...

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. All Technical Question regarding waterproofing, infrastructure execution activity, building execution activity
  • Ans. Explain all details regarding Technical Question
  • Answered Anonymously
  • Q2. Director ask me about my personal hobbies, family background ?
  • Q3. Checking all personal document, resident proof, previous salary proof, expected CTC?
Round 4 - Final round regarding job locati 

(1 Question)

  • Q1. Appointment me as a sr Civil engineer near my residential location& fixi my CTC & final all original documents varification

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain all details during interview which actual work you done during past company experience

I applied via Company Website and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What about your construction field experience?
  • Ans. Good, but there are some situations that seem to leave everything.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Psp Projects Senior Civil Engineer interview:
  • BBS
Interview preparation tips for other job seekers - Take your own decision & obey the Company rules & regulations.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. What are the difference between shuttering and formwork? 2. What is the ratio of plaster?
  • Ans. 

    Shuttering and formwork are used interchangeably. Plaster ratio varies depending on the type of surface.

    • Shuttering and formwork are temporary structures used to support concrete until it sets.

    • Shuttering is typically used for vertical surfaces, while formwork is used for horizontal surfaces.

    • Plaster ratio varies depending on the type of surface. For example, the ratio for internal walls is 1:6, while for external walls i

  • Answered by AI
  • Q2. 3. What is the size of AAC brick?
  • Ans. 

    The size of AAC brick varies depending on the manufacturer and type.

    • AAC bricks can range from 2.5 to 3 inches in height, 8 to 10 inches in length, and 4 to 6 inches in width.

    • The size of AAC brick can also be customized according to the specific needs of a project.

    • The size of AAC brick affects its weight, strength, and thermal insulation properties.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(7 Questions)

  • Q1. What is your current workplace?
  • Ans. 

    I am currently working at a construction company specializing in infrastructure projects.

    • Specializing in infrastructure projects

    • Working at a construction company

    • Dealing with civil engineering tasks

  • Answered by AI
  • Q2. What is your experience in this field?
  • Ans. 

    I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.

    • Managed site development projects from concept to completion

    • Designed infrastructure systems such as water supply and drainage

    • Performed construction management duties to ensure projects stayed on schedule and within budget

    • Worked on projects ranging from residential de...

  • Answered by AI
  • Q3. How do you handle a site in the transmission sector?
  • Ans. 

    Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.

    • Coordinate with utility companies to ensure proper installation of transmission lines

    • Ensure compliance with safety regulations and environmental standards

    • Oversee the construction process to ensure quality and timely completion

    • Manage and resolve any iss...

  • Answered by AI
  • Q4. What are the key considerations for the foundation in transmission line construction?
  • Ans. 

    Key considerations for foundation in transmission line construction

    • Soil type and bearing capacity must be assessed

    • Proper foundation design to support the weight and wind loads of the transmission line towers

    • Consideration of environmental factors such as seismic activity and flooding

    • Accessibility for construction equipment and maintenance

    • Proper drainage to prevent erosion and foundation instability

  • Answered by AI
  • Q5. What is the best method for erection in transmission?
  • Ans. 

    The best method for erection in transmission is using cranes and specialized equipment.

    • Use cranes for lifting and placing heavy transmission components

    • Ensure proper planning and coordination to avoid delays

    • Utilize specialized equipment for precise positioning

    • Follow safety protocols to prevent accidents

    • Consider environmental factors such as wind and terrain

  • Answered by AI
  • Q6. How do you adapt to various challenging situations?
  • Ans. 

    I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.

    • Stay calm and composed under pressure

    • Analyze the problem thoroughly before taking action

    • Seek advice and input from colleagues or experts

    • Think creatively to come up with innovative solutions

  • Answered by AI
  • Q7. What is the role of the diagonal in the transmission sector?
  • Ans. 

    The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.

    • The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.

    • They prevent the tower from buckling or collapsing under various loads.

    • Diagonals also help in reducing the overall weight of the tower by transferring some of the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for work by acquiring knowledge about all the processes in this field, including any difficulties or problems related to this transmission line.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. What was your experience during the interview process?
  • Q2. What are your salary expectations?
  • Q3. Why you last company leave
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

Shri Balaji Buildmate Interview FAQs

How many rounds are there in Shri Balaji Buildmate Senior Civil Engineer interview?
Shri Balaji Buildmate interview process usually has 1 rounds. The most common rounds in the Shri Balaji Buildmate interview process are One-on-one Round.
What are the top questions asked in Shri Balaji Buildmate Senior Civil Engineer interview?

Some of the top questions asked at the Shri Balaji Buildmate Senior Civil Engineer interview -

  1. What is the main bar in s...read more
  2. What is main part of buildi...read more
  3. What is the master r...read more

Tell us how to improve this page.

Shri Balaji Buildmate Senior Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Civil Site Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Project Manager
11 salaries
unlock blur

₹6.5 L/yr - ₹12.6 L/yr

Senior Project Manager
4 salaries
unlock blur

₹10.2 L/yr - ₹18 L/yr

Civil Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Junior Engineer Civil
4 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Explore more salaries
Compare Shri Balaji Buildmate with

UltraTech Cement

4.2
Compare

ACC

3.9
Compare

Ambuja Cements

3.9
Compare

JK Cement

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview