Shri Balaji Buildmate Senior Civil Engineer Interview Questions, Process, and Tips

Updated 22 Jun 2024

Shri Balaji Buildmate Senior Civil Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What is the master ring
  • Ans. 

    The master ring is a key component in a pile foundation system used to transfer the load from the superstructure to the piles.

    • The master ring is typically made of steel and is placed on top of the pile cap.

    • It helps distribute the load evenly among the piles in the foundation.

    • The master ring also helps in providing stability and strength to the overall structure.

    • It is an important element in ensuring the structural inte

  • Answered by AI
  • Q2. What is the main bar in slab
  • Ans. 

    Main bar in slab is the primary reinforcement bar used to support the load in a concrete slab.

    • Main bar in slab is typically placed in the bottom layer of the slab to resist tensile forces.

    • It is usually larger in diameter compared to distribution bars to provide additional strength.

    • Main bars are spaced closer together near supports and openings for increased load-bearing capacity.

    • Examples of main bars in slab include re

  • Answered by AI
  • Q3. What is main part of building
  • Ans. 

    The main part of a building is its foundation.

    • The foundation provides structural support and stability to the building.

    • It distributes the weight of the building and prevents settling or shifting.

    • Examples of foundation types include shallow foundations, deep foundations, and pile foundations.

  • Answered by AI
  • Q4. What is the waterproofing
  • Ans. 

    Waterproofing is a method or process used to prevent water from penetrating a structure or material.

    • Waterproofing can be achieved through the use of materials such as membranes, coatings, and sealants.

    • It is important in construction to prevent water damage to buildings and infrastructure.

    • Examples of waterproofing methods include applying waterproof membranes to basements, roofs, and foundations.

    • Proper waterproofing can...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formane finishing wark

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.

Shri Balaji Buildmate Interview FAQs

How many rounds are there in Shri Balaji Buildmate Senior Civil Engineer interview?
Shri Balaji Buildmate interview process usually has 1 rounds. The most common rounds in the Shri Balaji Buildmate interview process are One-on-one Round.
What are the top questions asked in Shri Balaji Buildmate Senior Civil Engineer interview?

Some of the top questions asked at the Shri Balaji Buildmate Senior Civil Engineer interview -

  1. What is the main bar in s...read more
  2. What is main part of buildi...read more
  3. What is the master r...read more

Tell us how to improve this page.

Shri Balaji Buildmate Senior Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Civil Site Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Project Manager
11 salaries
unlock blur

₹6.5 L/yr - ₹12.6 L/yr

Senior Project Manager
4 salaries
unlock blur

₹10.2 L/yr - ₹18 L/yr

Civil Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Junior Engineer Civil
4 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Explore more salaries
Compare Shri Balaji Buildmate with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview