Upload Button Icon Add office photos

Filter interviews by

Shri Balaji Buildmate Interview Questions, Process, and Tips

Updated 22 Jun 2024

Top Shri Balaji Buildmate Interview Questions and Answers

Shri Balaji Buildmate Interview Experiences

Popular Designations

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. What is the master ring
  • Ans. 

    The master ring is a key component in a pile foundation system used to transfer the load from the superstructure to the piles.

    • The master ring is typically made of steel and is placed on top of the pile cap.

    • It helps distribute the load evenly among the piles in the foundation.

    • The master ring also helps in providing stability and strength to the overall structure.

    • It is an important element in ensuring the structural inte

  • Answered by AI
  • Q2. What is the main bar in slab
  • Ans. 

    Main bar in slab is the primary reinforcement bar used to support the load in a concrete slab.

    • Main bar in slab is typically placed in the bottom layer of the slab to resist tensile forces.

    • It is usually larger in diameter compared to distribution bars to provide additional strength.

    • Main bars are spaced closer together near supports and openings for increased load-bearing capacity.

    • Examples of main bars in slab include re

  • Answered by AI
  • Q3. What is main part of building
  • Ans. 

    The main part of a building is its foundation.

    • The foundation provides structural support and stability to the building.

    • It distributes the weight of the building and prevents settling or shifting.

    • Examples of foundation types include shallow foundations, deep foundations, and pile foundations.

  • Answered by AI
  • Q4. What is the waterproofing
  • Ans. 

    Waterproofing is a method or process used to prevent water from penetrating a structure or material.

    • Waterproofing can be achieved through the use of materials such as membranes, coatings, and sealants.

    • It is important in construction to prevent water damage to buildings and infrastructure.

    • Examples of waterproofing methods include applying waterproof membranes to basements, roofs, and foundations.

    • Proper waterproofing can...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formane finishing wark

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

fresher Interview Questions & Answers

user image Anonymous

posted on 20 Dec 2020

I applied via Campus Placement and was interviewed in Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How can you handle company's responsibilities?
  • Q2. If I give you job, then how can you give benefit to this company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Check confidence,
Knowledge and behavior
Don't judge by his spoken English language

fresher Interview Questions asked at other Companies

Q1. What is the unit of electric current
View answer (127)

I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding Planning and billing
Round 3 - HR 

(1 Question)

  • Q1. Regarding remuneration

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidential nothing else,
Work is not the only goal of life.....!

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

I appeared for an interview in Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. They asked me about RAM and ROM

Interview Preparation Tips

Round: Technical Interview
Experience: I studied about them before so it was not a problem for me

Skills: Coding Skills
College Name: IIT Kharagpur

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

Shri Balaji Buildmate Interview FAQs

How many rounds are there in Shri Balaji Buildmate interview?
Shri Balaji Buildmate interview process usually has 2 rounds. The most common rounds in the Shri Balaji Buildmate interview process are One-on-one Round, Group Discussion and Technical.
How to prepare for Shri Balaji Buildmate interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shri Balaji Buildmate. The most common topics and skills that interviewers at Shri Balaji Buildmate expect are Payroll, Trade, Income Tax, Tally and Accounts Handling.
What are the top questions asked in Shri Balaji Buildmate interview?

Some of the top questions asked at the Shri Balaji Buildmate interview -

  1. What is the main bar in s...read more
  2. What is main part of buildi...read more
  3. What is the master r...read more

Tell us how to improve this page.

Shri Balaji Buildmate Interview Process

based on 3 interviews

Interview experience

3.3
  
Average
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

Shri Balaji Buildmate Reviews and Ratings

based on 42 reviews

3.5/5

Rating in categories

3.4

Skill development

3.3

Work-life balance

3.2

Salary

3.3

Job security

3.3

Company culture

3.3

Promotions

3.3

Work satisfaction

Explore 42 Reviews and Ratings
Civil Site Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Project Manager
11 salaries
unlock blur

₹6.5 L/yr - ₹12.6 L/yr

Senior Project Manager
4 salaries
unlock blur

₹10.2 L/yr - ₹18 L/yr

Civil Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Junior Engineer Civil
4 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Explore more salaries
Compare Shri Balaji Buildmate with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview