I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
The master ring is a key component in a pile foundation system used to transfer the load from the superstructure to the piles.
The master ring is typically made of steel and is placed on top of the pile cap.
It helps distribute the load evenly among the piles in the foundation.
The master ring also helps in providing stability and strength to the overall structure.
It is an important element in ensuring the structural inte
Main bar in slab is the primary reinforcement bar used to support the load in a concrete slab.
Main bar in slab is typically placed in the bottom layer of the slab to resist tensile forces.
It is usually larger in diameter compared to distribution bars to provide additional strength.
Main bars are spaced closer together near supports and openings for increased load-bearing capacity.
Examples of main bars in slab include re
The main part of a building is its foundation.
The foundation provides structural support and stability to the building.
It distributes the weight of the building and prevents settling or shifting.
Examples of foundation types include shallow foundations, deep foundations, and pile foundations.
Waterproofing is a method or process used to prevent water from penetrating a structure or material.
Waterproofing can be achieved through the use of materials such as membranes, coatings, and sealants.
It is important in construction to prevent water damage to buildings and infrastructure.
Examples of waterproofing methods include applying waterproof membranes to basements, roofs, and foundations.
Proper waterproofing can...
I applied via Campus Placement and was interviewed in Jun 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
I appeared for an interview before Aug 2016.
I appeared for an interview in Sep 2016.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
based on 3 interviews
Interview experience
based on 42 reviews
Rating in categories
Civil Site Engineer
17
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Project Manager
11
salaries
| ₹6.5 L/yr - ₹12.6 L/yr |
Senior Project Manager
4
salaries
| ₹10.2 L/yr - ₹18 L/yr |
Civil Engineer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Junior Engineer Civil
4
salaries
| ₹2.4 L/yr - ₹2.8 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem