Upload Button Icon Add office photos

Filter interviews by

Shreeyam Power And Steel Industries Interview Questions and Answers for Freshers

Updated 28 Feb 2025

Shreeyam Power And Steel Industries Interview Experiences for Freshers

Popular Designations

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Ro in pretreatment process?
  • Ans. 

    Ro in pretreatment process refers to reverse osmosis used as a part of the water treatment process before the main treatment.

    • Ro in pretreatment process helps remove larger particles, contaminants, and impurities from the water before it undergoes further treatment.

    • It helps improve the efficiency and lifespan of the main treatment system by reducing the load on it.

    • Examples of pretreatment processes using Ro include filt...

  • Answered by AI
  • Q2. Naocl what work for uf ?

RO Plant Operator Interview Questions asked at other Companies

Q1. Tell me about the Ro . How many type Chemical use in Ro plant . How many type valve . When you backwash . When you change the cartridge filter. Product water how much ph .chlorine and conductivity or TDS.
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Site Engineer Estimation Quality
  • Ans. 

    Site Engineer estimation quality is crucial for project success.

    • Site Engineer should have strong understanding of project requirements and materials needed.

    • Regularly update estimates based on changes in project scope or materials costs.

    • Collaborate with project managers and suppliers to ensure accurate estimates.

    • Use software tools like AutoCAD or Excel for precise calculations.

    • Review past projects to learn from any esti

  • Answered by AI
  • Q2. BBS Estimation servey

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard working team leadership

Assistant Engineer Interview Questions asked at other Companies

Q1. How do we take slump for casting of concrete and what if when we go rise about 50 meter height ...is their any difference in slump value as we go rise or in high rise buildings
View answer (4)

Jobs at Shreeyam Power And Steel Industries

View all

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Position & JD

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go thorugh the JD throughly to succeed.

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

I applied via Referral and was interviewed before Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Method Overloading and Method Overriding
  • Q2. Excel Presentation

Interview Preparation Tips

Interview preparation tips for other job seekers - Work with business team and on excel presentation.

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to distribution network, safety and Quality of work related.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never miss guide the inteiviower.

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today

Interview Questionnaire 

1 Question

  • Q1. Question about power distribution has been asked.

Analyst Interview Questions & Answers

Eaton user image Anonymous

posted on 15 Mar 2022

I applied via Naukri.com and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Technical pluse your resume
Round 2 - One-on-one 

(1 Question)

  • Q1. Manager round , mostly around what you have written in resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk about your JD in detail .
Have some street smartness on how to answer things differently,
Go through your resume

Shreeyam Power And Steel Industries Interview FAQs

How many rounds are there in Shreeyam Power And Steel Industries interview for freshers?
Shreeyam Power And Steel Industries interview process for freshers usually has 1 rounds. The most common rounds in the Shreeyam Power And Steel Industries interview process for freshers are Technical and HR.
How to prepare for Shreeyam Power And Steel Industries interview for freshers?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shreeyam Power And Steel Industries. The most common topics and skills that interviewers at Shreeyam Power And Steel Industries expect are Printing and Packaging and Subject Matter Expertise.
What are the top questions asked in Shreeyam Power And Steel Industries interview for freshers?

Some of the top questions asked at the Shreeyam Power And Steel Industries interview for freshers -

  1. Ro in pretreatment proce...read more
  2. Site Engineer Estimation Qual...read more
  3. Totally question related with electrical as like,induction furnace,drive,...read more

Tell us how to improve this page.

Shreeyam Power And Steel Industries Interview Process for Freshers

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 231 Interviews
Adani Group Interview Questions
3.9
 • 200 Interviews
Tata Power Interview Questions
3.9
 • 165 Interviews
Torrent Power Interview Questions
3.7
 • 132 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
Enphase Energy Interview Questions
2.9
 • 43 Interviews
Inox Wind Interview Questions
3.7
 • 38 Interviews
View all

Shreeyam Power And Steel Industries Reviews and Ratings

based on 68 reviews

4.2/5

Rating in categories

3.7

Skill development

4.2

Work-life balance

3.8

Salary

4.5

Job security

3.9

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 68 Reviews and Ratings
Senior FP&A Analysts

Kachchh

4-7 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
28 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Assistant Manager
19 salaries
unlock blur

₹5.2 L/yr - ₹10 L/yr

Mechanical Maintenance Engineer
9 salaries
unlock blur

₹3.4 L/yr - ₹4.4 L/yr

Mechanical Engineer
9 salaries
unlock blur

₹2.5 L/yr - ₹4.8 L/yr

Boiler DCS Engineer
8 salaries
unlock blur

₹3 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Shreeyam Power And Steel Industries with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

Torrent Power

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview