I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Drawing survey design estimate involves creating detailed plans for construction projects based on survey data and cost estimates.
Start by analyzing survey data to understand the site conditions and constraints
Use software like AutoCAD or Civil 3D to create detailed drawings of the site layout and infrastructure
Estimate the quantities of materials needed for construction based on the drawings
Calculate the costs of mate...
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
Construction material and techniques
Construction labour management
Site work
I applied via Newspaper Ad and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The weight of green concrete varies depending on the mix design and components used.
The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.
Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.
Lightweight concrete can have a lower weight, while high-density concrete can be heavier.
The weight of green concrete is important for structural
The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.
Tensile Strength = Maximum Load / Cross-sectional Area
The units for tensile strength are typically in MPa (megapascals)
Tensile strength is an important property of concrete for determining its ability to resist tension forces
For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...
The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.
The water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water ce...
IS code of steel refers to the Indian Standard code for steel materials and products.
IS 2062:2011 - Steel for general structural purposes
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
13
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Civil Site Engineer
8
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Project Manager
7
salaries
| ₹10.2 L/yr - ₹19.6 L/yr |
Billing Engineer
6
salaries
| ₹3.2 L/yr - ₹4.6 L/yr |
Civil Engineer
5
salaries
| ₹2.3 L/yr - ₹4.8 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures