Upload Button Icon Add office photos

Filter interviews by

Shree Gautam Construction Company Interview Questions and Answers

Updated 10 Aug 2024

Shree Gautam Construction Company Interview Experiences

2 interviews found

Civil Site Engineer Interview Questions & Answers

user image Pranjal Thakuria

posted on 10 Aug 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Drawing survey design estimate
  • Ans. 

    Drawing survey design estimate involves creating detailed plans for construction projects based on survey data and cost estimates.

    • Start by analyzing survey data to understand the site conditions and constraints

    • Use software like AutoCAD or Civil 3D to create detailed drawings of the site layout and infrastructure

    • Estimate the quantities of materials needed for construction based on the drawings

    • Calculate the costs of mate...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shree Gautam Construction Company Civil Site Engineer interview:
  • Design

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)

I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Site management, AutoCAD design
  • Q2. Technical planing & structural design

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir, please check my request for technical site Engineer service.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)

Jobs at Shree Gautam Construction Company

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Group Discussion 

In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.

Round 3 - Technical 

(2 Questions)

  • Q1. Just ask the technical questions regard what you learn till now through your studies.
  • Q2. In which subject you have more knowledge?
  • Ans. 

    I have more knowledge in structural engineering.

    • Specialization in structural analysis and design

    • Extensive experience in designing buildings, bridges, and other structures

    • Knowledge of various materials and construction techniques

    • Familiarity with relevant codes and standards

    • Ability to perform structural calculations and simulations

  • Answered by AI
Round 4 - HR 

(3 Questions)

  • Q1. What's your strength?
  • Q2. If you are selected then what's your responsibility for your company?
  • Q3. Your able to work in a flexible time .

Interview Preparation Tips

Interview preparation tips for other job seekers - First your know about the company and post in which you apply.
You should have knowledge in which post you apply.
For example if you are applying for site engineer then you should have knowledge of building materials, test of materials. IS code knowledge. Ms Excel, ms word, etc . Knowledge you should have. There are some software that also used in construction.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked My previous projects details
  • Q2. I'm telling all answers

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical it lasted for about 30 minute's. Most of questions asked to me were related to my previous projects

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Quantity surveying

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and good past experience is must

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your name and designation
  • Q2. Where are you from and
Round 2 - One-on-one 

(1 Question)

  • Q1. Who is the ceo of abc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and rock the interview with good communication skills.do not stumble on ypur answers
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude ,logical reasoning and quant aptitude

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Design tinyurl system design
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Salary expectation
  • Q2. My previous roles

Interview Preparation Tips

Topics to prepare for ABCI Infrastructures Analyst interview:
  • Analytics
Interview preparation tips for other job seekers - Read reviews of the company and then only join

Shree Gautam Construction Company Interview FAQs

How many rounds are there in Shree Gautam Construction Company interview?
Shree Gautam Construction Company interview process usually has 1-2 rounds. The most common rounds in the Shree Gautam Construction Company interview process are Technical and Resume Shortlist.
How to prepare for Shree Gautam Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shree Gautam Construction Company. The most common topics and skills that interviewers at Shree Gautam Construction Company expect are Civil Engineering, Construction Management, Site Execution, Construction Engineering and Project Management.
What are the top questions asked in Shree Gautam Construction Company interview?

Some of the top questions asked at the Shree Gautam Construction Company interview -

  1. Drawing survey design estim...read more
  2. Site management, AutoCAD des...read more
  3. Technical planing & structural des...read more

Tell us how to improve this page.

Shree Gautam Construction Company Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Shree Gautam Construction Company Reviews and Ratings

based on 36 reviews

4.0/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.5

Salary

3.8

Job security

3.5

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 36 Reviews and Ratings
Senior manager Finishing

Guwahati

7-12 Yrs

Not Disclosed

Mep Engineer

Guwahati

7-12 Yrs

Not Disclosed

Explore more jobs
Site Engineer
13 salaries
unlock blur

₹1.7 L/yr - ₹4 L/yr

Civil Site Engineer
8 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Project Manager
7 salaries
unlock blur

₹10.2 L/yr - ₹19.6 L/yr

Billing Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹4.6 L/yr

Civil Engineer
5 salaries
unlock blur

₹2.3 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Shree Gautam Construction Company with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.0
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview