Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
Top trending discussions
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
posted on 1 Sep 2021
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 5 Aug 2022
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the c
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in struct
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing mat
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensi...
How to work with us?
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Oct 2022. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 79 reviews
Rating in categories
Deputy Manager
677
salaries
| ₹6 L/yr - ₹17.5 L/yr |
Senior Engineer
403
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
281
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Civil Engineer
269
salaries
| ₹2 L/yr - ₹8.9 L/yr |
Civil Site Engineer
225
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Alstom Transportation
Kalpataru Projects International