Casting solidification time is the duration it takes for molten metal to solidify in a casting process.
Casting solidification time depends on factors like material type, mold temperature, and casting geometry.
Higher pouring temperatures generally result in shorter solidification times.
Thicker sections of the casting will take longer to solidify compared to thinner sections.
Aluminum alloys typically have shorter solidif
Casting design considerations include material selection, part geometry, draft angles, surface finish, and shrinkage.
Material selection is crucial for the desired properties and performance of the final part.
Part geometry should be designed to minimize stress concentrations and ensure proper flow of molten metal.
Draft angles are necessary for easy removal of the part from the mold.
Surface finish requirements should be ...
CAD test-Housing model
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
Quality Assurance tools
Metrology is the science of measurement, while Quality Engineering focuses on ensuring products meet quality standards.
Metrology involves the study of measurement techniques, tools, and standards.
Quality engineering focuses on designing, implementing, and maintaining quality systems to ensure products meet customer requirements.
Metrology is more focused on the accuracy and precision of measurements, while quality engin...
posted on 20 Aug 2024
The construction of a chimney involves various methods and materials to ensure proper ventilation and smoke removal.
Chimneys can be constructed using bricks, concrete blocks, or metal flues.
The construction process involves building a base, a shaft, and a cap to ensure proper airflow.
Proper insulation and sealing are important to prevent leaks and improve efficiency.
Chimneys should be built to the appropriate height to...
The type of grease used in an engine depends on the specific requirements of the engine and manufacturer recommendations.
Different types of grease may be used in different parts of the engine, such as lithium-based grease for bearings and high-temperature grease for exhaust components.
It is important to consult the engine manufacturer's recommendations or a qualified mechanic to determine the appropriate grease to use.
...
based on 2 reviews
Rating in categories
Customer Engineer
293
salaries
| ₹2.5 L/yr - ₹6.4 L/yr |
Assistant Manager
159
salaries
| ₹5.2 L/yr - ₹17.2 L/yr |
Accounts Manager
137
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
129
salaries
| ₹4.5 L/yr - ₹19 L/yr |
Senior Customer Engineer
101
salaries
| ₹3.5 L/yr - ₹9.6 L/yr |
Otis Elevator
KONE
TK Elevator
Mitsubishi Electric