I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Technical knowledge in elevator
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Schindler interview questions for designations
Top trending discussions
I have worked on various DCS architectures in my career, including those for chemical plants and power plants.
Designed and implemented DCS architecture for a chemical plant project
Developed DCS architecture for a power plant project
Worked on DCS architecture for a water treatment plant project
Collaborated with team to create DCS architecture for a pharmaceutical plant project
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Technical and aptitude
posted on 5 Sep 2024
I applied via Job Portal and was interviewed in Aug 2024. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
I am a highly skilled and experienced Project Engineer with a strong background in managing complex engineering projects.
Over 10 years of experience in project management and engineering
Proficient in utilizing project management software and tools
Strong leadership and communication skills
Proven track record of successfully delivering projects on time and within budget
Experience in coordinating with cross-functional tea...
I have worked on various projects in my previous company, including the construction of a new office building and the implementation of a software system for project management.
Construction of a new office building
Implementation of a software system for project management
The lifecycle of a project refers to the stages it goes through from initiation to closure.
Initiation: project is defined and approved
Planning: project objectives, scope, and resources are determined
Execution: project plan is put into action
Monitoring and Control: project progress is tracked and necessary adjustments are made
Closure: project is completed and evaluated
Examples: construction of a building, development of...
Industrial communication protocols are standards for data exchange between devices in industrial automation and control systems.
Some common industrial communication protocols include Modbus, Profibus, DeviceNet, Ethernet/IP, and CANopen.
These protocols enable devices from different manufacturers to communicate with each other and exchange data.
Industrial communication protocols can be wired or wireless, and can operate...
MODBUS settings include baud rate, parity, data bits, stop bits, and slave address.
Baud rate determines the speed of communication between devices.
Parity is used for error checking and can be set to even, odd, or none.
Data bits determine the number of bits used to represent each character.
Stop bits indicate the end of a character and can be set to 1 or 2.
Slave address is used to identify the device on the network.
Examp...
The maximum speed in Modbus depends on the baud rate and cable length.
Modbus speed is measured in baud rate
Higher baud rates allow for faster data transfer
Cable length can also affect the maximum speed
For example, at 9600 baud rate, the maximum cable length is 1200 meters
The number of devices that can be added in Modbus depends on the network architecture and the number of available addresses.
The maximum number of devices that can be added to a Modbus network is 247.
The number of available addresses depends on the type of Modbus protocol used (RTU or TCP/IP).
The network architecture also plays a role in determining the number of devices that can be added.
It is important to ensure that ...
Modbus communication types include RTU, ASCII, and TCP/IP.
RTU (Remote Terminal Unit) is a serial communication protocol that uses binary code to transmit data.
ASCII (American Standard Code for Information Interchange) is a serial communication protocol that uses ASCII characters to transmit data.
TCP/IP (Transmission Control Protocol/Internet Protocol) is a network communication protocol that uses Ethernet to transmit d...
I have worked on multiple SCADA systems including Wonderware, Ignition, and Inductive Automation.
I have experience with configuring and programming SCADA systems
I have worked with Wonderware, Ignition, and Inductive Automation
I am familiar with creating HMI screens, alarms, and trends
I have experience with PLC communication and data acquisition
I have worked on projects in various industries including manufacturing and
The maximum input output handle refers to the maximum number of inputs and outputs that a device can handle.
The maximum input output handle varies depending on the device and its specifications.
It is important to consider the maximum input output handle when selecting a device for a project.
For example, a PLC may have a maximum input output handle of 256 inputs and 256 outputs.
Another example is a microcontroller with ...
The number of pages designed in HMI depends on the project requirements and complexity.
The number of pages can range from a few to hundreds depending on the project scope.
The complexity of the HMI design and functionality also affects the number of pages.
Factors such as user interface, data visualization, and system integration can impact the number of pages.
It is important to prioritize user experience and ease of nav
A control valve is a device used to regulate the flow of a fluid in a system by varying the size of the flow passage.
Control valves are commonly used in industries such as oil and gas, chemical, and power plants.
They can be operated manually, pneumatically, electrically, or through a combination of these methods.
The operation of a control valve involves adjusting the position of the valve plug or disc to control the fl...
based on 4 interviews
Interview experience
based on 28 reviews
Rating in categories
Customer Engineer
314
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
163
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Manager
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Customer Engineer
99
salaries
| ₹0 L/yr - ₹0 L/yr |
Otis Elevator
KONE
TK Elevator
Mitsubishi Electric India