Filter interviews by
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I have faced reliability issues in the following areas:
Frequent breakdowns of machinery
Inconsistent performance of spare parts
Unreliable suppliers causing delays in delivery
Quality issues with spare parts
Lack of proper maintenance leading to failures
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.
Electrical power system design involves creating and implementing plans for the generation, transmission, and distribution of electricity.
Designing power generation systems such as solar panels, wind turbines, and hydroelectric dams
Developing plans for the transmission and distribution of electricity through power lines and substations
Ensuring the safety and reliability of the electrical system through proper grounding...
Top trending discussions
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via AmbitionBox and was interviewed in Sep 2024. There were 2 interview rounds.
Overviews pumps and trableshooting
posted on 2 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Costing for laying pipelines involves calculating material costs, labor costs, equipment costs, and overhead expenses.
Calculate the length of the pipeline needed
Determine the type and size of pipes required
Estimate the cost of materials including pipes, fittings, and valves
Factor in labor costs for installation
Consider equipment costs such as machinery and tools
Include overhead expenses like permits, insurance, and pro...
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Array is a fixed-size data structure while ArrayList is a dynamic-size data structure in Java.
Array is a fixed-size collection of elements of the same data type, while ArrayList is a dynamic-size collection that can grow or shrink as needed.
Arrays can store primitive data types and objects, while ArrayList can only store objects.
Arrays require a specific size to be declared, while ArrayList can dynamically resize itsel...
I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 29 reviews
Rating in categories
Piping Designer
56
salaries
| ₹5.4 L/yr - ₹19 L/yr |
Structural Designer
17
salaries
| ₹7 L/yr - ₹16.6 L/yr |
Piping Design Engineer
16
salaries
| ₹6.2 L/yr - ₹16 L/yr |
Instrument Engineer
6
salaries
| ₹6 L/yr - ₹20 L/yr |
System Designer
6
salaries
| ₹5 L/yr - ₹13.8 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Saipem