Filter interviews by
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Array is a fixed-size data structure while ArrayList is a dynamic-size data structure in Java.
Array is a fixed-size collection of elements of the same data type, while ArrayList is a dynamic-size collection that can grow or shrink as needed.
Arrays can store primitive data types and objects, while ArrayList can only store objects.
Arrays require a specific size to be declared, while ArrayList can dynamically resize itsel...
I applied via Job Portal and was interviewed in Jul 2023. There were 2 interview rounds.
Yes, I remove the mouth and cavity in the mold to create a clean and accurate 3D design.
Yes, I remove the mouth and cavity in the mold to ensure a smooth finish on the final product.
This process helps in creating a more accurate and detailed 3D design.
Removing the mouth and cavity in the mold also helps in reducing any imperfections in the final product.
Yes, I would appreciate assistance from the company to address mould issues.
I would seek guidance on the best methods for removing mould safely and effectively.
I would appreciate any resources or products the company can provide to help with mould removal.
I would be open to training or workshops on preventing mould growth in the future.
NPCC Engineering interview questions for popular designations
Analytical skills based on Mathematics and design standards
SFD and BMD diagrams are graphical representations of shear force and bending moment along a beam.
SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam.
BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam.
SFD and BMD diagrams are essential for analyzing the internal forces in a structure.
The area under the SFD curve gives the change in bending m...
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Jan 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
Bending Moment diagram shows the variation of bending moment along the length of a beam.
In a cantilever beam, the bending moment is maximum at the fixed end and zero at the free end.
In a normal beam, the bending moment is maximum at the center and zero at the supports.
The bending moment diagram is plotted by taking the area under the shear force diagram.
The bending moment at any point on the beam can be calculated usin...
BM maximum and minimum refer to the highest and lowest points of the benchmark.
BM maximum is the highest point of the benchmark and is used as a reference for elevation measurements.
BM minimum is the lowest point of the benchmark and is used as a reference for depth measurements.
The location of BM maximum and minimum varies depending on the site and the benchmark used.
BM maximum and minimum are important for accurate s
I applied via Approached by Company and was interviewed before Aug 2022. There were 2 interview rounds.
Top trending discussions
based on 120 reviews
Rating in categories
Senior Structural Engineer
20
salaries
| ₹8.5 L/yr - ₹20 L/yr |
Senior Principal Engineer
16
salaries
| ₹16 L/yr - ₹24 L/yr |
Piping Engineer
16
salaries
| ₹5.6 L/yr - ₹14.5 L/yr |
Discipline Engineer
16
salaries
| ₹6.5 L/yr - ₹11.2 L/yr |
Principal Engineer
16
salaries
| ₹12 L/yr - ₹25 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company