Filter interviews by
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I have faced reliability issues in the following areas:
Frequent breakdowns of machinery
Inconsistent performance of spare parts
Unreliable suppliers causing delays in delivery
Quality issues with spare parts
Lack of proper maintenance leading to failures
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.
Electrical power system design involves creating and implementing plans for the generation, transmission, and distribution of electricity.
Designing power generation systems such as solar panels, wind turbines, and hydroelectric dams
Developing plans for the transmission and distribution of electricity through power lines and substations
Ensuring the safety and reliability of the electrical system through proper grounding...
posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
3 tests are conducted
DCS is used for continuous processes while PLC is used for discrete processes.
DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.
PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.
DCS is designed to handle large amounts of data from multiple sources and control multiple processe...
Control valves regulate fluid flow by adjusting the size of the valve opening.
Control valves are used in various industries such as oil and gas, chemical, and power generation.
They work by adjusting the size of the valve opening to regulate the flow of fluid.
The valve opening is controlled by a signal from a controller, which can be manual or automated.
Control valves can be classified into different types such as globe...
A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.
Pressure switch consists of a sensing element, switch mechanism, and a pressure port.
When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.
Pressure switches are used in various applications such as HVAC systems, water pumps, a
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 13 Mar 2024
My personal Profile, working knowledge,
My nature, behavior, honesty, simplicity, connecting people, positive attitude, relationship with other, communications, adjustment, negotiation, working Exposure,time management.
based on 1 interview
Interview experience
based on 29 reviews
Rating in categories
Piping Designer
56
salaries
| ₹5.4 L/yr - ₹19 L/yr |
Structural Designer
17
salaries
| ₹7 L/yr - ₹16.6 L/yr |
Piping Design Engineer
16
salaries
| ₹6.2 L/yr - ₹16 L/yr |
Instrument Engineer
6
salaries
| ₹6 L/yr - ₹20 L/yr |
System Designer
6
salaries
| ₹5 L/yr - ₹13.8 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Saipem