Filter interviews by
Metallurgy is the process of removing impurities from ore to obtain pure metal.
Metallurgy involves various processes like crushing, grinding, and smelting to extract metal from ore.
Impurities like sulfur, phosphorus, and silicon are removed through chemical reactions or physical processes.
The purity of the metal obtained depends on the efficiency of the metallurgical process.
Examples of metals obtained through metallur
Annealing is a heat treatment process that involves heating and slow cooling of metal at normal temperature.
Annealing is used to improve the ductility, toughness, and machinability of metals.
It involves heating the metal to a specific temperature and holding it there for a period of time.
The metal is then slowly cooled down to room temperature.
This process helps to relieve internal stresses and improve the metal's micr...
Sintering is a process of heating and compressing powdered metal to form a solid mass without melting it.
Powdered metal is heated below its melting point to form a solid mass.
The process is used to create complex shapes and improve the strength of metal parts.
Sintering is commonly used in the production of automotive parts, cutting tools, and electronic components.
Ferrous metals contain iron while non-ferrous metals do not.
Ferrous metals: iron, steel, cast iron, wrought iron
Non-ferrous metals: copper, aluminum, zinc, lead, gold, silver
Ferrous metals are magnetic while non-ferrous metals are not
Ferrous metals are prone to rust while non-ferrous metals are not
Top trending discussions
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Blast furnace operation involves the process of smelting iron ore to produce iron.
Blast furnace is a large structure used to extract iron from iron ore.
The process involves heating iron ore with coke and limestone in a continuous flow of hot air.
The intense heat melts the iron ore, separating the impurities and producing molten iron.
The molten iron is then tapped from the bottom of the furnace and further processed for...
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
I applied via Job Portal and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed before Jun 2021. There were 3 interview rounds.
On electrical subject
Some of the top questions asked at the Sathavahana Ispat interview -
based on 2 interviews
Interview experience
based on 94 reviews
Rating in categories
Junior Manager
11
salaries
| ₹3.5 L/yr - ₹4.6 L/yr |
Assistant Manager
10
salaries
| ₹3.7 L/yr - ₹6.4 L/yr |
Mechanical Engineer
10
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Deputy Manager
8
salaries
| ₹6 L/yr - ₹7.8 L/yr |
Engineer
6
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Electrotherm
Jai Balaji Group
Jayaswal Neco Industries
Kirloskar Ferrous Industries