Filter interviews by
Metallurgy is the process of removing impurities from ore to obtain pure metal.
Metallurgy involves various processes like crushing, grinding, and smelting to extract metal from ore.
Impurities like sulfur, phosphorus, and silicon are removed through chemical reactions or physical processes.
The purity of the metal obtained depends on the efficiency of the metallurgical process.
Examples of metals obtained through metallur
Annealing is a heat treatment process that involves heating and slow cooling of metal at normal temperature.
Annealing is used to improve the ductility, toughness, and machinability of metals.
It involves heating the metal to a specific temperature and holding it there for a period of time.
The metal is then slowly cooled down to room temperature.
This process helps to relieve internal stresses and improve the metal's micr...
Sintering is a process of heating and compressing powdered metal to form a solid mass without melting it.
Powdered metal is heated below its melting point to form a solid mass.
The process is used to create complex shapes and improve the strength of metal parts.
Sintering is commonly used in the production of automotive parts, cutting tools, and electronic components.
Ferrous metals contain iron while non-ferrous metals do not.
Ferrous metals: iron, steel, cast iron, wrought iron
Non-ferrous metals: copper, aluminum, zinc, lead, gold, silver
Ferrous metals are magnetic while non-ferrous metals are not
Ferrous metals are prone to rust while non-ferrous metals are not
Top trending discussions
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
Ductile iron is a type of cast iron that has improved strength and ductility due to the addition of magnesium.
Ductile iron is produced by adding magnesium to molten iron, which causes the graphite to form in nodules rather than flakes.
The iron carbon diagram shows the phases of iron and carbon at different temperatures and carbon concentrations.
Drawing the iron carbon diagram involves plotting the percentage of carbon ...
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Aug 2022. There were 2 interview rounds.
Equipment efficiency is crucial for maximizing productivity and minimizing downtime.
Regular maintenance schedules can help ensure equipment is operating at peak efficiency.
Investing in newer, more efficient equipment can lead to cost savings in the long run.
Monitoring key performance indicators (KPIs) can help identify areas for improvement in equipment efficiency.
Handling loss of RMHS materials involves proper inventory management, tracking systems, and security measures.
Implement a robust inventory management system to track all RMHS materials
Regularly conduct audits to ensure accuracy of inventory records
Utilize security measures such as surveillance cameras, access control systems, and restricted access areas
Train staff on proper handling and storage procedures to prevent lo...
Some electrical project ideas for in house improvements include installing smart home technology, upgrading lighting fixtures, and adding solar panels.
Install smart home technology for energy efficiency and convenience
Upgrade lighting fixtures to improve aesthetics and energy efficiency
Add solar panels to reduce electricity costs and environmental impact
Sap pm and electrically
I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.
The best percentage of Alumina for sintering depends on the specific material and desired properties.
The optimal percentage of Alumina for sintering can vary depending on the material being processed.
Generally, Alumina content in the range of 5-30% is common for sintering ceramics.
Higher Alumina content can lead to increased strength and hardness, but may also make the material more brittle.
Lower Alumina content may re...
I currently handle a team of 10 employees in the sales department.
Managing a team of 10 employees in the sales department
Setting sales targets and monitoring performance
Providing training and support to team members
Collaborating with other departments to improve sales strategies
I am currently handling a team of 15 employees in the sales department, overseeing daily operations and setting sales targets.
Managing a team of 15 employees in the sales department
Overseeing daily operations and ensuring smooth functioning
Setting sales targets and monitoring performance
Conducting regular team meetings and providing feedback
Collaborating with other departments for cross-functional projects
Some of the top questions asked at the Sathavahana Ispat Metallurgist interview -
based on 1 interview
Interview experience
Junior Manager
11
salaries
| ₹3.5 L/yr - ₹4.6 L/yr |
Assistant Manager
10
salaries
| ₹3.7 L/yr - ₹6.4 L/yr |
Mechanical Engineer
10
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Deputy Manager
8
salaries
| ₹6 L/yr - ₹7.8 L/yr |
Engineer
6
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Electrotherm
Jai Balaji Group
Jayaswal Neco Industries
Kirloskar Ferrous Industries