I applied via Approached by Company and was interviewed before Aug 2022. There were 2 interview rounds.
Equipment efficiency is crucial for maximizing productivity and minimizing downtime.
Regular maintenance schedules can help ensure equipment is operating at peak efficiency.
Investing in newer, more efficient equipment can lead to cost savings in the long run.
Monitoring key performance indicators (KPIs) can help identify areas for improvement in equipment efficiency.
Top trending discussions
Fault level is the maximum current that can flow through a power system during a fault.
Fault level is a measure of the system's ability to handle fault currents.
It is important to calculate fault level to ensure the safety and reliability of the power system.
Fault level can be calculated by considering the impedance of the system and the available fault current sources.
The calculation involves determining the maximum f...
I would assess the situation, prioritize based on urgency and impact on operations, and make a fair decision considering the needs of the team and the business.
Assess the reasons for leave requests - urgent personal matters, planned vacations, etc.
Prioritize based on urgency and impact on operations - critical tasks, team workload, upcoming deadlines.
Consider alternative solutions - shifting schedules, temporary replac...
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Job Portal and was interviewed before Nov 2021. There were 3 interview rounds.
Direct through campus placement and group discussion.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Basic Knowledge only
I applied via Walk-in
Alumina is manufactured through the Bayer process, which involves extracting aluminum oxide from bauxite ore.
Bauxite ore is crushed and mixed with sodium hydroxide to form a slurry
The slurry is heated and pressurized to dissolve the aluminum oxide
The resulting solution is cooled and filtered to remove impurities
The aluminum oxide is then heated at high temperatures to form alumina
The temperature required for this proce
I was interviewed before Mar 2022.
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
JSW Steel
Tata Steel
Steel Authority Of India
Vedanta Limited