Filter interviews by
Clear (1)
I applied via AmbitionBox and was interviewed in Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Oct 2023. There were 2 interview rounds.
Managing people during critical urgent production requires clear communication, prioritization, and support.
Communicate clearly with the team about the urgency of the situation and the tasks that need to be completed.
Prioritize tasks based on their impact on the production and allocate resources accordingly.
Provide support and resources to help the team meet the urgent production needs.
Stay calm and focused to lead by ...
I would address the controversy by promoting open communication, addressing the issue directly, and fostering a positive work environment.
Encourage open communication among the workers to address any misunderstandings or concerns.
Address the issue directly by talking to the individuals involved and getting to the root of the problem.
Promote a positive work environment by emphasizing teamwork, respect, and professionali...
LOB can be calculated by dividing the total revenue generated by a specific product or service by the total revenue of the company.
Calculate the total revenue generated by the specific product or service.
Calculate the total revenue of the company.
Divide the total revenue generated by the specific product or service by the total revenue of the company to get the LOB.
Example: If a product generates $100,000 in revenue an...
Lean production system is a manufacturing philosophy that focuses on minimizing waste and maximizing efficiency.
It involves continuous improvement and elimination of non-value-added activities
It emphasizes on creating a pull-based system where production is based on customer demand
It involves the use of tools such as Kanban, 5S, and Kaizen
Examples of companies that use lean production system include Toyota, Nike, and I
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability is calculated by dividing the total operating time by planned production time.
Performance is calculated by dividing the actual production rate by the maximum production rate.
Quality is calculated by dividing the number of good units produced by the total number of units produced.
OEE = Availability x Performance x Quality
I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.
Samsung interview questions for designations
Top trending discussions
I was interviewed in Sep 2016.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
posted on 3 May 2017
I was interviewed before May 2016.
I was interviewed in Feb 2017.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
based on 5 interviews
Interview experience
based on 41 reviews
Rating in categories
Sales Executive
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
960
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
880
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
525
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
477
salaries
| ₹0 L/yr - ₹0 L/yr |
Apple
LG Electronics
Sony
Xiaomi