Filter interviews by
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
Protection of Motor, Transformer & Generator is essential to prevent damage and ensure safe operation.
Protection devices such as circuit breakers, fuses, and relays are used to safeguard motors, transformers, and generators.
Overcurrent protection is used to prevent excessive current flow that can damage the equipment.
Thermal protection is employed to prevent overheating of the equipment.
Voltage protection ensures that ...
If struck in a situation, I will assess the problem, troubleshoot, and take appropriate actions to resolve it.
Assess the situation and identify the problem
Troubleshoot the issue by analyzing the root cause
Take appropriate actions to resolve the problem
Ensure safety measures are followed
Document the incident and report to the relevant authorities
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I appeared for an interview before Feb 2024.
Top trending discussions
I appeared for an interview before Mar 2024, where I was asked the following questions.
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
posted on 5 Dec 2024
What is more important product quality and marketing
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 5 interview rounds.
I am highly skilled in decision making and have a strong track record of making effective and efficient decisions.
I have a systematic approach to decision making, considering all relevant factors and weighing the pros and cons.
I am able to analyze complex situations and quickly identify the best course of action.
I am confident in my decision making abilities and can make tough decisions under pressure.
I have a history ...
I have strong technical skills.
I have a deep understanding of various programming languages and frameworks.
I have experience in designing and implementing complex systems.
I am proficient in troubleshooting and resolving technical issues.
I continuously update my skills to stay up-to-date with the latest technologies.
I have successfully completed several challenging projects in the past.
Strong communication skills with experience in presenting technical information to both technical and non-technical audiences.
Experience in delivering presentations and explaining complex technical concepts in a clear and concise manner.
Ability to adapt communication style based on the audience, whether it's colleagues, clients, or stakeholders.
Active listening skills to understand and address concerns or questions eff...
Confidence is the belief in oneself, while skill is the ability to perform a task.
Confidence is a subjective feeling, while skill is a measurable capability.
Confidence can be influenced by external factors, while skill is developed through practice and experience.
Confidence can vary from person to person, while skill can be objectively assessed.
Confidence alone may not guarantee success, but skill is essential for achi...
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 34 reviews
Rating in categories
Senior Engineer
14
salaries
| ₹5.8 L/yr - ₹9.5 L/yr |
Electrical Engineer
7
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Desk Engineer
7
salaries
| ₹3.8 L/yr - ₹5.2 L/yr |
Deputy Manager
6
salaries
| ₹10 L/yr - ₹13.5 L/yr |
Graduate Engineer Trainee (Get)
5
salaries
| ₹2 L/yr - ₹3.1 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
New Allenberry Works