Filter interviews by
Top trending discussions
posted on 15 Dec 2024
I was interviewed in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.
Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.
The steam is used to rotate a turbine, which drives a generator to produce electricity.
The process involves several components such as boilers, turbines, condensers, and cooling towers.
Thermal power plants require a constan...
I applied via Walk-in
Sample interview questions for Site Engineer position
BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications
Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase
Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement
Full form of TMT ...
posted on 13 Dec 2022
I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.
GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.
GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.
It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.
For example, if the GSB tolerance for compa...
Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.
Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.
Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.
The process may include activities such as regrading, compacting the soil, re...
I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.
Steel and concrete are commonly used construction materials in civil engineering.
Steel is an alloy of iron and carbon, known for its high strength and durability.
Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.
Steel is commonly used in structural elements like beams, columns, and reinforcement bars.
Concrete is used for foundations, slabs, walls, ...
What is the colume
The vertical part of the building and base of the slab, distribution of load
posted on 13 Feb 2023
posted on 20 Jul 2024
The size of steel used for columns depends on the load it needs to support and the height of the column.
The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.
The size of steel columns can also be determined based on the structural design calculations and building codes.
Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...
Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.
Development bars length is determined based on structural design requirements.
It is important to follow the specifications provided by the structural engineer.
The length of development bars can vary depending on the type of structure and load requirements.
Proper placement and anchoring of developmen
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.
Understanding of drainage systems and their components
Knowledge of local regulations and standards for drainage design
Ability to calculate drainage capacity and slope requirements
Experience in designing and implementing drainage solutions
Familiarity with different types of drainage materials and their proper
Assistant Manager
7
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
Accountant
5
salaries
| ₹1.5 L/yr - ₹8.1 L/yr |
Contracts Billing Manager
4
salaries
| ₹11.7 L/yr - ₹15 L/yr |
Toll Manager
4
salaries
| ₹4.9 L/yr - ₹8.4 L/yr |
Maintenance Manager
4
salaries
| ₹8.6 L/yr - ₹14 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Techno Electric & Engineering Company
Consolidated Construction Consortium