Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
Solid block consumption in Sqm is higher than AAC blocks due to differences in material density and strength.
Solid blocks are typically made of materials like concrete or clay, which are denser and heavier than AAC blocks made of lightweight aerated concrete.
The higher density of solid blocks results in a higher consumption in Sqm compared to AAC blocks.
Solid blocks also tend to have higher compressive strength than AA...
Rate analysis for plaster involves calculating the cost of materials, labor, and overhead for plastering work.
Rate analysis for plaster includes determining the quantity of materials needed for plastering, such as cement, sand, and water.
Labor costs for plastering work should be calculated based on the number of workers required and their wages.
Overhead costs, such as equipment rental and transportation expenses, shoul...
Rate analysis for flooring involves calculating the cost of materials, labor, and overhead for installing flooring in a specific area.
Calculate the total area of the flooring to be installed
Determine the cost of materials needed for the flooring (e.g. tiles, wood, carpet)
Estimate the labor cost based on the type of flooring and complexity of installation
Include overhead costs such as equipment rental or transportation
D...
I applied via Approached by Company and was interviewed in May 2022. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed before Apr 2023. There were 3 interview rounds.
Written and excel test on real estate fundamentals
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
I was interviewed in Jun 2019.
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Job Portal
Triggers are actions that are automatically performed when a certain event occurs in a database. Async operations are tasks that run independently of the main program flow.
Triggers in databases are used to maintain data integrity and automate tasks based on specified conditions.
Async operations in programming allow tasks to be executed concurrently without blocking the main program flow.
Examples of async operations inc...
Create a trigger on an object related to Account and Contact
Use the 'trigger' keyword to start the trigger
Specify the object you want to create the trigger on (e.g. Account)
Include logic to handle the related Contact object (e.g. querying related contacts)
posted on 25 Jan 2025
I was interviewed before Jan 2024.
I have always been fascinated by the potential for growth and investment in real estate.
Passion for real estate market trends and opportunities
Enjoy working with people and helping them find their dream homes
Excited about the potential for financial growth and success in the industry
I reside in a cozy apartment in downtown Seattle.
I live in downtown Seattle
I have a cozy apartment
My residence is in a city
I can join the department within two weeks of receiving an offer.
I can start within two weeks of receiving an offer.
My current job requires a two-week notice period.
I have some personal commitments that I need to wrap up before starting.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Sales Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
IT Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Lulu International Shopping Mall
Signature Global
Sunteck Realty
Pittie Group