Upload Button Icon Add office photos

Rodic Consultants

Compare button icon Compare button icon Compare

Filter interviews by

Rodic Consultants Interview Questions, Process, and Tips

Updated 7 Apr 2025

Top Rodic Consultants Interview Questions and Answers

View all 37 questions

Rodic Consultants Interview Experiences

Popular Designations

34 interviews found

I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. 1st question: Start telling about your first job and complete with your last one with details of location, Project and Client.
  • Q2. 2nd question: What were the different types of Tasks or works you were assigned with ?
  • Q3. 3rd question: what are the different method of rust prevention for rebars on site?
  • Ans. 

    Different methods of rust prevention for rebars on site

    • Coating with anti-corrosive materials like epoxy, zinc, or polyurethane

    • Cathodic protection using impressed current or sacrificial anodes

    • Proper concrete cover and curing to prevent moisture penetration

    • Regular inspection and maintenance to identify and address any signs of corrosion

    • Using stainless steel rebars instead of traditional carbon steel rebars

    • Applying corros...

  • Answered by AI
  • Q4. 4th question: How many tests you know for soil and concrete about quality related?
  • Q5. 5th question: what are the different safety measures you use to take on site?
  • Ans. 

    Safety measures on site include personal protective equipment, hazard identification, and emergency response planning.

    • Wearing personal protective equipment (PPE) such as hard hats, safety glasses, and steel-toed boots

    • Identifying and addressing potential hazards such as uneven terrain, electrical hazards, and falling objects

    • Developing and implementing an emergency response plan in case of accidents or injuries

    • Providing ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be true to your CV. Keep your voice Confident, it's really very important.
Usually you will be asked relatable things you would say, so manipulate accordingly.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Basic details about urself
  • Q2. Projects worked

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (72)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Describe configuration of contact and catenary?
  • Ans. 

    Contact and catenary configuration involves the arrangement of overhead wires and supports for electric trains.

    • Contact wire is typically made of copper or aluminum and carries the electric current for the train

    • Catenary wire is used to support the contact wire and is usually made of steel

    • The contact wire is suspended from the catenary wire using droppers or hangers

    • The catenary wire is supported by overhead line equipmen...

  • Answered by AI
  • Q2. Why consider 2*25 over 1*25 OHE
  • Ans. 

    Using 2*25 over 1*25 OHE provides redundancy and reliability in case of failures.

    • 2*25 OHE provides redundancy in case of a single line failure

    • 2*25 OHE allows for maintenance on one line while the other remains operational

    • 2*25 OHE increases reliability and reduces downtime compared to 1*25 OHE

  • Answered by AI
  • Q3. Describe about relay testing by primary and secondary injection
  • Ans. 

    Relay testing by primary and secondary injection involves injecting current into the relay to test its functionality.

    • Primary injection testing involves injecting a high current directly into the relay to simulate a fault condition.

    • Secondary injection testing involves injecting a low current through the relay's input terminals to test its response.

    • Primary injection testing is more accurate but requires specialized equip...

  • Answered by AI
  • Q4. Describe safety in OHE and PSI work in Railway
  • Ans. 

    Safety in OHE and PSI work in Railway is crucial to prevent accidents and ensure smooth operations.

    • Regular inspection and maintenance of overhead equipment (OHE) to prevent failures

    • Proper training of personnel working on OHE and PSI to ensure they follow safety protocols

    • Use of personal protective equipment (PPE) such as helmets, gloves, and safety harnesses

    • Implementation of safety procedures like lockout-tagout (LOTO) ...

  • Answered by AI
  • Q5. Brief description about impedance , efficiency of transformer
  • Ans. 

    Impedance is the opposition to the flow of alternating current in a transformer, while efficiency is the ratio of output power to input power.

    • Impedance is the total opposition to the flow of alternating current in a transformer, including resistance and reactance.

    • Efficiency of a transformer is the ratio of output power to input power, expressed as a percentage.

    • Higher impedance in a transformer can lead to voltage drops...

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Introduce about yourself,majorly focus on experience related to railway construction,where what role you perform
  • Q2. Why you want to left your current job as you already in railway project so why you want to do another railway project
  • Ans. 

    I am seeking new challenges and opportunities for growth in a different railway project.

    • Seeking new challenges and opportunities for growth

    • Interested in gaining experience in a different railway project

    • Looking for a change in work environment or responsibilities

  • Answered by AI
  • Q3. How to handle this role and responsibilities of Resident Engineer as you are new for this role ,not any experience as resident Engineer
  • Ans. 

    As a new Resident Engineer, I will focus on learning the responsibilities, building relationships with team members, seeking guidance from experienced colleagues, and continuously improving my technical skills.

    • Focus on learning the responsibilities of the role

    • Build relationships with team members and stakeholders

    • Seek guidance and mentorship from experienced colleagues

    • Continuously improve technical skills through traini

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Rodic Consultants Resident Engineer interview:
  • Transformers
  • Circuit Breakers
  • Relay Testing
  • Relays
  • insulators
Interview preparation tips for other job seekers - Brush up your basic concept on power system installation,MRVCL client mostly asked basic and deep conceptual questions about power system and installation they also moved to B.tech electrical concepts,MRVCL interview is defferent than Contractor company interview,companies interview mainly based on data and how you perform work ,

Skills evaluated in this interview

Top Rodic Consultants Resident Engineer Interview Questions and Answers

Q1. What is the cost of one km of new OHE supply and installation?
View answer (2)

Resident Engineer Interview Questions asked at other Companies

Q1. What is PLC ? WHAT IS LADDAR LOGIC ? WHAT IS WORKING PRINCIPAL OF RADAR GUAGE FOR LIQUID ? WHAT IS WORKING PRINCIPAL OF DCV ? HOW CAN SWITCH PRIMARY TO STAND BY SERVER ?
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Asked about the projects in my resume, focused mainly on backend and sql part

Summer Intern Interview Questions asked at other Companies

Q1. There are 8 bottles of milk out of which one bottle is poisoned. What will be the minimum number of persons required to find the poisoned bottle if the person dies within 24 hours of drinking the poison. You have only 24 hours.
View answer (6)

Rodic Consultants interview questions for popular designations

 Resident Engineer

 (3)

 Deputy Team Leader

 (3)

 Assistant Project Engineer

 (2)

 Quality Engineer

 (2)

 Field Engineer

 (1)

 Executive Assistant

 (1)

 Summer Intern

 (1)

 Senior Manager

 (1)

Interview Questions & Answers

user image Anonymous

posted on 28 Jan 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024, where I was asked the following questions.

  • Q1. What is MDD
  • Q2. Define specific gravity
  • Ans. 

    Specific gravity is the ratio of the density of a substance to the density of a reference substance, typically water.

    • Specific gravity is a dimensionless quantity.

    • It is calculated as: Specific Gravity = Density of substance / Density of water.

    • For example, the specific gravity of water is 1.

    • If a substance has a specific gravity greater than 1, it will sink in water (e.g., lead).

    • If it is less than 1, it will float (e.g.,

  • Answered by AI
  • Q3. Limit of silt content in sand

Get interview-ready with Top Rodic Consultants Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding my current job profile and ongoing work with specifications.
Round 2 - Technical 

(1 Question)

  • Q1. Highway-related work limits and standard tests performed for various activities etc.

Jobs at Rodic Consultants

View all

Field Engineer Interview Questions & Answers

user image Sandeep Kumar

posted on 18 Feb 2024

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. C&g depth Tak karte he
  • Q2. Gsb ki width kitni hoti he

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions of Highway

Field Engineer Interview Questions asked at other Companies

Q1. What is insulator and conductors and semiconductors
View answer (6)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-

I appeared for an interview before Mar 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. Transformer testing procedures
  • Ans. 

    Transformer testing procedures ensure operational efficiency and safety through various diagnostic tests.

    • Visual Inspection: Check for physical damage, oil leaks, and corrosion.

    • Insulation Resistance Test: Measure insulation resistance to ensure safety and performance.

    • Turns Ratio Test: Verify the turns ratio to ensure proper voltage transformation.

    • Power Factor Test: Assess the power factor to evaluate insulation conditio...

  • Answered by AI
  • Q2. Traction sub station selection criteria
  • Ans. 

    Key criteria for selecting traction substations include load requirements, location, and reliability.

    • Load Requirements: Assess the maximum and average load to ensure the substation can handle peak demands.

    • Location: Choose sites that minimize transmission losses and are accessible for maintenance.

    • Reliability: Evaluate the reliability of the power supply and backup systems to prevent service interruptions.

    • Environmental I...

  • Answered by AI
  • Q3. Employment schedule of mast
  • Ans. 

    The employment schedule of a mast involves planning its usage, maintenance, and operational timelines for efficiency.

    • Define the mast's operational hours based on project requirements.

    • Schedule regular maintenance checks to ensure safety and functionality.

    • Coordinate with other teams to avoid conflicts in mast usage.

    • Example: If a mast is used for construction, plan its use during peak work hours.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong theoretical base

Top Rodic Consultants Resident Engineer Interview Questions and Answers

Q1. What is the cost of one km of new OHE supply and installation?
View answer (2)

Resident Engineer Interview Questions asked at other Companies

Q1. What is PLC ? WHAT IS LADDAR LOGIC ? WHAT IS WORKING PRINCIPAL OF RADAR GUAGE FOR LIQUID ? WHAT IS WORKING PRINCIPAL OF DCV ? HOW CAN SWITCH PRIMARY TO STAND BY SERVER ?
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 13 Feb 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding current work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidence and good technical knowledge according to technical work.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the cost of one km of new OHE supply and installation?
  • Ans. 

    The cost of one km of new OHE supply and installation varies depending on several factors.

    • The cost can vary based on the location and terrain of the installation site.

    • The type and quality of materials used can also impact the cost.

    • Labor costs, including skilled technicians and engineers, need to be considered.

    • Additional costs may include equipment rental, transportation, and permits.

    • Examples of factors affecting cost: ...

  • Answered by AI
  • Q2. What is the rating of LA used at 25kv side in switching station and Traction sub station?
  • Ans. 

    The rating of LA used at 25kv side in switching station and Traction sub station depends on the specific requirements and design of the stations.

    • The rating of LA (Lightning Arrester) at the 25kv side in switching station and Traction sub station is determined based on the voltage level and the expected lightning surge levels.

    • The LA rating is typically specified in terms of voltage withstand capability and energy absorp...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What was your team size in your last project?

Top Rodic Consultants Resident Engineer Interview Questions and Answers

Q1. What is the cost of one km of new OHE supply and installation?
View answer (2)

Resident Engineer Interview Questions asked at other Companies

Q1. What is PLC ? WHAT IS LADDAR LOGIC ? WHAT IS WORKING PRINCIPAL OF RADAR GUAGE FOR LIQUID ? WHAT IS WORKING PRINCIPAL OF DCV ? HOW CAN SWITCH PRIMARY TO STAND BY SERVER ?
View answer (2)
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of transmission line
  • Ans. 

    Transmission lines are used to transmit electrical energy from one point to another.

    • Overhead transmission lines: These are the most common type of transmission lines and are used to transmit electricity over long distances.

    • Underground transmission lines: These lines are buried underground and are used in urban areas or areas where overhead lines are not feasible.

    • Submarine transmission lines: These lines are used to tra...

  • Answered by AI
  • Q2. Types of control pannelz in e.s.p control room in a thermal power plant.
  • Ans. 

    The types of control panels in an ESP control room in a thermal power plant vary depending on the specific plant and its requirements.

    • Main control panel: This panel houses the main controls and indicators for the ESP system.

    • Power control panel: This panel controls the power supply to the ESP system.

    • Instrumentation control panel: This panel contains instruments and gauges for monitoring and controlling various parameter...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always become confident about your knwledve.

Assistant Project Engineer Interview Questions asked at other Companies

Q1. What is the difference between RTD & Thermocouple?
View answer (1)

Rodic Consultants Interview FAQs

How many rounds are there in Rodic Consultants interview?
Rodic Consultants interview process usually has 1-2 rounds. The most common rounds in the Rodic Consultants interview process are Technical, HR and Resume Shortlist.
How to prepare for Rodic Consultants interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rodic Consultants. The most common topics and skills that interviewers at Rodic Consultants expect are WTP, Drainage, STP, Waste Water and Water Supply.
What are the top questions asked in Rodic Consultants interview?

Some of the top questions asked at the Rodic Consultants interview -

  1. 3rd question: what are the different method of rust prevention for rebars on si...read more
  2. 5th question: what are the different safety measures you use to take on si...read more
  3. What are the process to check the quality during execution and during materia...read more
How long is the Rodic Consultants interview process?

The duration of Rodic Consultants interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Rodic Consultants Interview Process

based on 44 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

Rodic Consultants Reviews and Ratings

based on 634 reviews

4.2/5

Rating in categories

3.9

Skill development

4.1

Work-life balance

3.9

Salary

3.7

Job security

4.1

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 634 Reviews and Ratings
Team Leader

Kolkata

10-15 Yrs

Not Disclosed

Field Supervisor- 55

Meerut

0-5 Yrs

Not Disclosed

Explore more jobs
Field Engineer
63 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Assistant Project Engineer
62 salaries
unlock blur

₹2.3 L/yr - ₹5.2 L/yr

Deputy Team Leader
52 salaries
unlock blur

₹4.6 L/yr - ₹9 L/yr

Assistant Manager Finance
44 salaries
unlock blur

₹2.7 L/yr - ₹6.9 L/yr

Field Supervisor
43 salaries
unlock blur

₹1.9 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rodic Consultants with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview