Filter interviews by
I applied via Company Website and was interviewed in Nov 2020. There were 3 interview rounds.
Different methods of rust prevention for rebars on site
Coating with anti-corrosive materials like epoxy, zinc, or polyurethane
Cathodic protection using impressed current or sacrificial anodes
Proper concrete cover and curing to prevent moisture penetration
Regular inspection and maintenance to identify and address any signs of corrosion
Using stainless steel rebars instead of traditional carbon steel rebars
Applying corros...
Safety measures on site include personal protective equipment, hazard identification, and emergency response planning.
Wearing personal protective equipment (PPE) such as hard hats, safety glasses, and steel-toed boots
Identifying and addressing potential hazards such as uneven terrain, electrical hazards, and falling objects
Developing and implementing an emergency response plan in case of accidents or injuries
Providing ...
Top trending discussions
posted on 1 Dec 2024
I appeared for an interview in Nov 2024.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Quality Assurance Plan (QAP) and Master Software Work (MSW) are essential for ensuring product quality and compliance.
QAP outlines the quality objectives, processes, and responsibilities for a project.
MSW details the software development lifecycle, including phases like requirements, design, implementation, and testing.
Example of QAP: A plan for a new medical device that includes risk management and validation protocol...
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
My favorite song is 'Bohemian Rhapsody' by Queen.
The song was released in 1975 and is a rock opera.
It has a unique structure, combining elements of rock, opera, and ballad.
The lyrics are poetic and thought-provoking, with themes of life, death, and self-reflection.
The song features intricate vocal harmonies and a wide range of musical styles.
It has become a timeless classic and is often regarded as one of the greatest
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
Some of the top questions asked at the Rodic Consultants Civil Site Engineer interview -
based on 7 reviews
Rating in categories
Field Engineer
62
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Project Engineer
62
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Deputy Team Leader
52
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Assistant Manager Finance
44
salaries
| ₹2.7 L/yr - ₹6.9 L/yr |
Field Supervisor
42
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem