Rodic Consultants
TCS Interview Questions and Answers
Q1. What is the cost of one km of new OHE supply and installation?
The cost of one km of new OHE supply and installation varies depending on several factors.
The cost can vary based on the location and terrain of the installation site.
The type and quality of materials used can also impact the cost.
Labor costs, including skilled technicians and engineers, need to be considered.
Additional costs may include equipment rental, transportation, and permits.
Examples of factors affecting cost: distance from the power source, ground conditions, accessi...read more
Q2. What is the rating of LA used at 25kv side in switching station and Traction sub station?
The rating of LA used at 25kv side in switching station and Traction sub station depends on the specific requirements and design of the stations.
The rating of LA (Lightning Arrester) at the 25kv side in switching station and Traction sub station is determined based on the voltage level and the expected lightning surge levels.
The LA rating is typically specified in terms of voltage withstand capability and energy absorption capacity.
The rating of LA may vary depending on the s...read more
Q3. Describe about relay testing by primary and secondary injection
Relay testing by primary and secondary injection involves injecting current into the relay to test its functionality.
Primary injection testing involves injecting a high current directly into the relay to simulate a fault condition.
Secondary injection testing involves injecting a low current through the relay's input terminals to test its response.
Primary injection testing is more accurate but requires specialized equipment, while secondary injection testing is simpler and mor...read more
Q4. Brief description about impedance , efficiency of transformer
Impedance is the opposition to the flow of alternating current in a transformer, while efficiency is the ratio of output power to input power.
Impedance is the total opposition to the flow of alternating current in a transformer, including resistance and reactance.
Efficiency of a transformer is the ratio of output power to input power, expressed as a percentage.
Higher impedance in a transformer can lead to voltage drops and inefficiencies.
Efficiency can be improved by using hi...read more
Q5. Describe configuration of contact and catenary?
Contact and catenary configuration involves the arrangement of overhead wires and supports for electric trains.
Contact wire is typically made of copper or aluminum and carries the electric current for the train
Catenary wire is used to support the contact wire and is usually made of steel
The contact wire is suspended from the catenary wire using droppers or hangers
The catenary wire is supported by overhead line equipment such as masts, brackets, and cantilevers
Proper tensionin...read more
Q6. Why consider 2*25 over 1*25 OHE
Using 2*25 over 1*25 OHE provides redundancy and reliability in case of failures.
2*25 OHE provides redundancy in case of a single line failure
2*25 OHE allows for maintenance on one line while the other remains operational
2*25 OHE increases reliability and reduces downtime compared to 1*25 OHE
Q7. Describe safety in OHE and PSI work in Railway
Safety in OHE and PSI work in Railway is crucial to prevent accidents and ensure smooth operations.
Regular inspection and maintenance of overhead equipment (OHE) to prevent failures
Proper training of personnel working on OHE and PSI to ensure they follow safety protocols
Use of personal protective equipment (PPE) such as helmets, gloves, and safety harnesses
Implementation of safety procedures like lockout-tagout (LOTO) before starting work
Adherence to speed limits and signalin...read more