Q1. What is the cost of one km of new OHE supply and installation?

Ans.

The cost of one km of new OHE supply and installation varies depending on several factors.

  • The cost can vary based on the location and terrain of the installation site.

  • The type and quality of materials used can also impact the cost.

  • Labor costs, including skilled technicians and engineers, need to be considered.

  • Additional costs may include equipment rental, transportation, and permits.

  • Examples of factors affecting cost: distance from the power source, ground conditions, accessi...read more

View 1 answer

Q2. What is the rating of LA used at 25kv side in switching station and Traction sub station?

Ans.

The rating of LA used at 25kv side in switching station and Traction sub station depends on the specific requirements and design of the stations.

  • The rating of LA (Lightning Arrester) at the 25kv side in switching station and Traction sub station is determined based on the voltage level and the expected lightning surge levels.

  • The LA rating is typically specified in terms of voltage withstand capability and energy absorption capacity.

  • The rating of LA may vary depending on the s...read more

View 1 answer

Q3. Describe about relay testing by primary and secondary injection

Ans.

Relay testing by primary and secondary injection involves injecting current into the relay to test its functionality.

  • Primary injection testing involves injecting a high current directly into the relay to simulate a fault condition.

  • Secondary injection testing involves injecting a low current through the relay's input terminals to test its response.

  • Primary injection testing is more accurate but requires specialized equipment, while secondary injection testing is simpler and mor...read more

Add your answer

Q4. Brief description about impedance , efficiency of transformer

Ans.

Impedance is the opposition to the flow of alternating current in a transformer, while efficiency is the ratio of output power to input power.

  • Impedance is the total opposition to the flow of alternating current in a transformer, including resistance and reactance.

  • Efficiency of a transformer is the ratio of output power to input power, expressed as a percentage.

  • Higher impedance in a transformer can lead to voltage drops and inefficiencies.

  • Efficiency can be improved by using hi...read more

Add your answer
Discover TCS interview dos and don'ts from real experiences

Q5. Describe configuration of contact and catenary?

Ans.

Contact and catenary configuration involves the arrangement of overhead wires and supports for electric trains.

  • Contact wire is typically made of copper or aluminum and carries the electric current for the train

  • Catenary wire is used to support the contact wire and is usually made of steel

  • The contact wire is suspended from the catenary wire using droppers or hangers

  • The catenary wire is supported by overhead line equipment such as masts, brackets, and cantilevers

  • Proper tensionin...read more

Add your answer

Q6. Why consider 2*25 over 1*25 OHE

Ans.

Using 2*25 over 1*25 OHE provides redundancy and reliability in case of failures.

  • 2*25 OHE provides redundancy in case of a single line failure

  • 2*25 OHE allows for maintenance on one line while the other remains operational

  • 2*25 OHE increases reliability and reduces downtime compared to 1*25 OHE

Add your answer

Q7. Describe safety in OHE and PSI work in Railway

Ans.

Safety in OHE and PSI work in Railway is crucial to prevent accidents and ensure smooth operations.

  • Regular inspection and maintenance of overhead equipment (OHE) to prevent failures

  • Proper training of personnel working on OHE and PSI to ensure they follow safety protocols

  • Use of personal protective equipment (PPE) such as helmets, gloves, and safety harnesses

  • Implementation of safety procedures like lockout-tagout (LOTO) before starting work

  • Adherence to speed limits and signalin...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter