Upload Button Icon Add office photos

Rodic Consultants

Compare button icon Compare button icon Compare

Filter interviews by

Rodic Consultants Interview Questions, Process, and Tips

Updated 4 Mar 2025

Top Rodic Consultants Interview Questions and Answers

View all 33 questions

Rodic Consultants Interview Experiences

Popular Designations

32 interviews found

I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Two pole different with HT line.
  • Ans. 

    This question is unclear and requires more context to provide a proper answer.

    • Please provide more information about the context of the question.

    • What is the specific problem or scenario being discussed?

    • Without additional details, it is difficult to provide a relevant answer.

  • Answered by AI
  • Q2. Two pole different 40,50 meter.
Round 3 - HR 

(2 Questions)

  • Q1. What is your good name
  • Q2. My self akash kumar from bihar gaya

Interview Preparation Tips

Interview preparation tips for other job seekers - Office staff poor but head office good. Patna head office poor behaviour.

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (10)
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Last company experience
  • Ans. 

    Managed document control for a construction company, ensuring all project documents were organized and accessible.

    • Implemented document control procedures to track revisions and approvals

    • Maintained electronic and hard copy filing systems for easy retrieval

    • Collaborated with project managers and engineers to ensure accurate documentation

    • Performed quality checks on documents to ensure compliance with company standards

  • Answered by AI
  • Q2. About your skill

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly Conform your salary because after selection they will reduce. and increment process they gave everyone 5% fix

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

I applied via Naukri.com

Round 1 - Technical 

(1 Question)

  • Q1. What are the process to check the quality during execution and during material inspection at site?
  • Ans. 

    Quality during execution and material inspection at site is ensured through various processes.

    • Conducting regular inspections and audits to identify any quality issues

    • Implementing quality control measures to ensure adherence to specifications and standards

    • Performing material testing and inspection to verify its quality

    • Using quality management tools and techniques such as statistical process control

    • Training and educating...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is GTP of 5MVA Power Transformers?
  • Ans. 

    GTP of 5MVA Power Transformers refers to the Guaranteed Technical Particulars.

    • GTP includes specifications such as rated power, voltage ratio, impedance, and losses.

    • It is a contractual agreement between the manufacturer and the customer.

    • GTP ensures that the transformer meets the required performance standards.

    • For a 5MVA transformer, the GTP would specify details such as 11kV/433V voltage ratio, 6% impedance, and 2.5% lo

  • Answered by AI
  • Q2. What is DI of Materials?
  • Ans. 

    DI of Materials stands for Dimensional Inspection of Materials.

    • DI of Materials is a process of measuring and verifying the dimensions of materials to ensure they meet the required specifications.

    • It involves using various tools and techniques such as calipers, micrometers, and coordinate measuring machines (CMMs).

    • DI of Materials is important in industries such as manufacturing, aerospace, and automotive to ensure the qu...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. What is your expectation and what’s are getting in your previous company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Apply only your profile jobs and give your practical answers what you did at site .

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (10)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction for shortlisting
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions

Lab Technician Interview Questions asked at other Companies

Q1. Order of draw Cbc parameters and normal range
View answer (42)

Rodic Consultants interview questions for popular designations

 Resident Engineer

 (3)

 Deputy Team Leader

 (3)

 Assistant Project Engineer

 (2)

 Quality Engineer

 (2)

 Field Engineer

 (1)

 Executive Assistant

 (1)

 Computer Operator

 (1)

 Summer Intern

 (1)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Any Projects did you closed?
Round 3 - Technical 

(1 Question)

  • Q1. Which documents are required for projects closures?
  • Ans. 

    Documents required for project closures include project completion report, final project budget, and project sign-off document.

    • Project completion report

    • Final project budget

    • Project sign-off document

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare according to your job profile.

Deputy Team Leader Interview Questions asked at other Companies

Q1. Which documents are required for projects closures?
View answer (1)

Get interview-ready with Top Rodic Consultants Interview Questions

Interview Questions & Answers

user image

posted on 14 Dec 2021

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Total experience in required field.
  • Q2. Current & Expected CTC.
Round 2 - Technical 

(2 Questions)

  • Q1. My experience regarding technical questions.
  • Q2. My management and skills regarding questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, practical, have relevant standard code and manual knowledge, develop your representation abilities.

Jobs at Rodic Consultants

View all

Interview Questionnaire 

2 Questions

  • Q1. Quality related questions
  • Q2. Be calm & speak what you know.

Executive Assistant Interview Questions asked at other Companies

Q1. What is deviation What is validation and its type in detail What is CAPA AND HOW IT is initiated Examples of incidences and how it is rectified Examples of preventive action and corrective actions Procedure for reprocessing of batch What is... read more
View answer (1)

Interview Questions & Answers

user image Anonymous

posted on 6 Oct 2021

I applied via Referral and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Dou you know ADB?Did you completed any highway project of ADB funded?What is the Major ADB highlites Environmental Issues related to Highway construction project?
  • Q2. Yes,I know it is a funding agency for different project.Yes I completed one ADB funded project in UP which was DPR project.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you did honestly work related to own field,than you will not hesitate to clear your interview for upcoming project.Simply all question was just on my past work.Therefore it was easy to did it.

I applied via Recruitment Consulltant and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Share details of your previous job.
  • Q2. Why should we hire you?
  • Q3. What are your salary expectations?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - They selected me for computer operator
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your favourite author names
  • Q2. Name any 5 English Novel Names
  • Ans. 

    Here are 5 popular English novel names.

    • To Kill a Mockingbird by Harper Lee

    • 1984 by George Orwell

    • Pride and Prejudice by Jane Austen

    • The Great Gatsby by F. Scott Fitzgerald

    • The Catcher in the Rye by J.D. Salinger

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is the Top Channel length of a Line D. P
  • Ans. 

    The Top Channel length of a Line D. P is not specified.

    • The question is incomplete as it does not specify the context of Line D. P

    • Top Channel length could refer to the length of the top channel of a pipeline or cable

    • Without more information, it is impossible to provide an accurate answer

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool and honest with the interviewer. Be polite and be simple dressed.

Deputy Team Leader Interview Questions asked at other Companies

Q1. Which documents are required for projects closures?
View answer (1)

Rodic Consultants Interview FAQs

How many rounds are there in Rodic Consultants interview?
Rodic Consultants interview process usually has 1-2 rounds. The most common rounds in the Rodic Consultants interview process are Technical, HR and Resume Shortlist.
How to prepare for Rodic Consultants interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rodic Consultants. The most common topics and skills that interviewers at Rodic Consultants expect are WTP, Drainage, STP, Waste Water and Water Supply.
What are the top questions asked in Rodic Consultants interview?

Some of the top questions asked at the Rodic Consultants interview -

  1. 3rd question: what are the different method of rust prevention for rebars on si...read more
  2. 5th question: what are the different safety measures you use to take on si...read more
  3. What are the process to check the quality during execution and during materia...read more
How long is the Rodic Consultants interview process?

The duration of Rodic Consultants interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Rodic Consultants Interview Process

based on 43 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

Rodic Consultants Reviews and Ratings

based on 631 reviews

4.2/5

Rating in categories

3.9

Skill development

4.1

Work-life balance

3.9

Salary

3.6

Job security

4.1

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 631 Reviews and Ratings
Field Supervisor- 55

Meerut

0-5 Yrs

Not Disclosed

Explore more jobs
Field Engineer
63 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Assistant Project Engineer
62 salaries
unlock blur

₹2.3 L/yr - ₹5.2 L/yr

Deputy Team Leader
52 salaries
unlock blur

₹4.6 L/yr - ₹9 L/yr

Assistant Manager Finance
44 salaries
unlock blur

₹2.7 L/yr - ₹6.9 L/yr

Field Supervisor
42 salaries
unlock blur

₹1.9 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Rodic Consultants with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview