Filter interviews by
I applied via Company Website and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jun 2020. There were 4 interview rounds.
The well foundation executed was a caisson type and the sinking procedure involved controlled excavation and filling with concrete.
The well foundation executed was a caisson type.
The sinking procedure involved controlled excavation.
The well foundation was filled with concrete.
The sinking procedure ensured stability and proper alignment of the foundation.
The steel bridge executed was a cable-stayed bridge.
The bridge was constructed using steel cables to support the deck.
Cable-stayed bridges are known for their aesthetic appeal and structural efficiency.
Examples of famous cable-stayed bridges include the Millau Viaduct in France and the Russky Bridge in Russia.
Confirming torquing involves verifying the accuracy of applied torque.
Confirming torquing is essential to ensure the proper tightening of fasteners.
It involves using torque wrenches or other torque measuring devices.
Verification can be done by comparing the applied torque with the specified torque value.
Visual inspection of fasteners can also help confirm torquing.
Regular calibration of torque tools is necessary for ac
I applied via Other and was interviewed in Mar 2018. There were 5 interview rounds.
I applied via Other and was interviewed in Mar 2018. There were 5 interview rounds.
I have a strong academic background in engineering with hands-on experience in various projects and internships.
Bachelor's degree in Engineering from XYZ University
Completed internships at ABC Company and DEF Company
Worked on projects involving design, analysis, and implementation of engineering solutions
Participated in engineering competitions and workshops
In 5 years, I see myself as a senior engineering officer leading a team of skilled professionals and contributing to innovative projects.
Leading a team of engineers on challenging projects
Contributing to the development of new technologies
Attending leadership training programs to enhance my skills
Possibly pursuing a higher degree in engineering for career advancement
QA focuses on preventing defects, while QC focuses on identifying and fixing defects.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards.
QC is a reactive process that focuses on identifying and fixing defects through inspections and testing.
QA involves activities like creating test plans, conducting audits...
Defects in welding are imperfections or flaws that occur during the welding process.
Common defects include porosity, undercutting, incomplete fusion, and cracks.
Porosity is caused by gas entrapment and can be mitigated by using proper shielding gas and cleaning the base metal.
Undercutting is a groove formation at the weld toe and can be reduced by adjusting welding parameters.
Incomplete fusion occurs when the weld meta...
RITES interview questions for popular designations
Get interview-ready with Top RITES Interview Questions
Top trending discussions
based on 22 interviews
Interview experience
Civil Engineer
139
salaries
| ₹2 L/yr - ₹9.9 L/yr |
Mechanical Engineer
107
salaries
| ₹3.4 L/yr - ₹6 L/yr |
Assistant Manager
102
salaries
| ₹5 L/yr - ₹17.4 L/yr |
Engineer
91
salaries
| ₹3 L/yr - ₹10 L/yr |
Inspection Engineer
89
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
Ircon International
Mecon
BHEL
Container Corporation of India