Filter interviews by
I applied via Other and was interviewed in Mar 2018. There were 5 interview rounds.
I have a strong academic background in engineering with hands-on experience in various projects and internships.
Bachelor's degree in Engineering from XYZ University
Completed internships at ABC Company and DEF Company
Worked on projects involving design, analysis, and implementation of engineering solutions
Participated in engineering competitions and workshops
In 5 years, I see myself as a senior engineering officer leading a team of skilled professionals and contributing to innovative projects.
Leading a team of engineers on challenging projects
Contributing to the development of new technologies
Attending leadership training programs to enhance my skills
Possibly pursuing a higher degree in engineering for career advancement
QA focuses on preventing defects, while QC focuses on identifying and fixing defects.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards.
QC is a reactive process that focuses on identifying and fixing defects through inspections and testing.
QA involves activities like creating test plans, conducting audits...
Defects in welding are imperfections or flaws that occur during the welding process.
Common defects include porosity, undercutting, incomplete fusion, and cracks.
Porosity is caused by gas entrapment and can be mitigated by using proper shielding gas and cleaning the base metal.
Undercutting is a groove formation at the weld toe and can be reduced by adjusting welding parameters.
Incomplete fusion occurs when the weld meta...
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
posted on 17 Jul 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
posted on 8 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Civil Engineer
151
salaries
| ₹3 L/yr - ₹9.3 L/yr |
Mechanical Engineer
108
salaries
| ₹3.4 L/yr - ₹6 L/yr |
Assistant Manager
106
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Inspection Engineer
96
salaries
| ₹3.3 L/yr - ₹10 L/yr |
Engineer
91
salaries
| ₹3 L/yr - ₹10 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon