Filter interviews by
I applied via Campus Placement and was interviewed in Oct 2024. There were 4 interview rounds.
2 problems, 15 test cases each
I applied via Campus Placement and was interviewed in Jun 2021. There were 6 interview rounds.
Adding two float variables and quality testing a water bottle after production.
For adding two float variables, use a programming language and perform the addition operation
For quality testing a water bottle, check for leaks, durability, and material quality
Conduct drop tests, pressure tests, and visual inspections
Ensure compliance with industry standards and regulations
Perform statistical analysis on test results to id
posted on 24 Dec 2024
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
QA QC related questions
I applied via Job Portal
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
The instruments code in use in the lab refers to the unique identification numbers assigned to the equipment used for testing and analysis.
Instruments code helps in tracking and identifying specific equipment.
It ensures traceability and accountability in the lab.
Examples of instruments code include serial numbers, barcodes, or RFID tags.
posted on 9 Aug 2023
The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.
Loss of structural integrity in packaging
Increased risk of contamination or tampering
Difficulty in handling and storage of products
Potential impact on product shelf life and quality
Need for alternative support measures or redesign of packaging
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.
Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.
The timing of pour strips will depend on the size and complexity of the pr...
Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.
Use adjustable props to support the slab and pourstrip while removing the shuttering.
Install beams to transfer the load from the slab to the props, allowing the supports to be removed.
Ensure proper alignment and spacing of props and beams to distribute the load evenly.
Regularly check and adjust the props and...
Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.
Perform slump test to ensure proper consistency of concrete
Check air content to ensure proper durability and workability
Monitor temperature to prevent issues like thermal cracking
At column and slab junction, check reinforcement p...
posted on 6 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
QA QC related questions
Senior Software Engineer
14
salaries
| ₹9 L/yr - ₹16 L/yr |
Software Engineer
12
salaries
| ₹7.4 L/yr - ₹11.2 L/yr |
Technical Lead
7
salaries
| ₹13.8 L/yr - ₹24 L/yr |
Product Owner
6
salaries
| ₹6 L/yr - ₹10 L/yr |
Associate - Team Lead
4
salaries
| ₹4.2 L/yr - ₹5.1 L/yr |
TCS
Infosys
Wipro
HCLTech