  • Q1. What is merit order in power plant. What is fixed charge and variable charge..what is the heat rate of the plant..how is efficient calculated.
  • Ans. 

    Merit order is the ranking of power plants based on their cost of production. Fixed charge is the cost of capital investment while variable charge is the cost of fuel and maintenance.

    • Merit order is used to determine which power plants will be dispatched first based on their cost of production.

    • Fixed charge is the cost of capital investment in the power plant, including the cost of building and maintaining the plant.

    • Vari...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the questions related to profitability of plant

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. In a steel cutting machine, tool continues the movement even after plug out the electrical supply/connection. Why?
  • Ans. 

    The tool continues to move due to inertia.

    • Inertia is the tendency of an object to resist changes in its motion.

    • The steel cutting machine has a heavy tool that requires a lot of force to stop its motion.

    • When the electrical supply is cut off, the motor that powers the tool stops providing force, but the tool continues to move due to its own inertia.

    • This is similar to how a car continues to move forward even after the eng...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - They pick the ques from your mention CV experience and give a task of your technical field.

I applied via LinkedIn and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. More about technical and planning of construction
  • Q2. Proper answers

Interview Preparation Tips

Interview preparation tips for other job seekers - You may have to wait for atleast 3 months to get a proper response from the HR, they hire only first class distinction holder candidates but

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Computer aptitude test

Round 2 - HR 

(1 Question)

  • Q1. Tell about yourself and your interests what are your hobbies etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be thorough in subject gained in graduation

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 768 Interviews
KEC International Interview Questions
4.0
 • 318 Interviews
Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

Reliance Infrastructure Assistant Manager/Manager -(Technical) Reviews and Ratings

based on 2 reviews

2.0/5

Rating in categories

2.0

Skill development

2.0

Work-life balance

1.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
116 salaries
unlock blur

₹3.9 L/yr - ₹12.7 L/yr

Deputy General Manager
75 salaries
unlock blur

₹14 L/yr - ₹36.6 L/yr

Senior Manager
74 salaries
unlock blur

₹9.1 L/yr - ₹24 L/yr

Manager
67 salaries
unlock blur

₹6.8 L/yr - ₹20.3 L/yr

General Manager
47 salaries
unlock blur

₹19 L/yr - ₹62.8 L/yr

Explore more salaries
Compare Reliance Infrastructure with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview