I applied via Company Website and was interviewed before Sep 2019. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What is transformer?
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.

    • They consist of two coils of wire, called the primary and secondary, wrapped around a magnetic core.

    • When an AC current flows through the primary coil, it creates a magnetic field that in...

  • Answered by AI
  • Q2. What is CT, PT?
  • Q3. What are diff type of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment to the earth to prevent electric shock.

    • There are several types of earthing, including plate earthing, rod earthing, pipe earthing, and strip earthing.

    • Plate earthing involves burying a copper plate in the earth and connecting it to the electrical equipment.

    • Rod earthing involves driving a copper rod into the earth and connecting it to the electrical equipment.

    • Pip...

  • Answered by AI
  • Q4. What are diff type of circuit breaker?
  • Ans. 

    Circuit breakers are of different types such as thermal, magnetic, hydraulic-magnetic, and residual current devices.

    • Thermal circuit breakers use a bimetallic strip to trip the breaker when it gets too hot.

    • Magnetic circuit breakers use an electromagnet to trip the breaker when it detects an overload.

    • Hydraulic-magnetic circuit breakers combine the features of both thermal and magnetic circuit breakers.

    • Residual current de...

  • Answered by AI
  • Q5. What is star delta starter?
  • Ans. 

    Star delta starter is an electrical motor starting mechanism that reduces the starting current and torque.

    • Used for starting high power motors

    • Consists of three contactors and a timer

    • Initially starts the motor in star configuration and then switches to delta configuration

    • Reduces starting current and torque

    • Commonly used in industrial applications

  • Answered by AI
  • Q6. What is bucholz relay?
  • Ans. 

    Buchholz relay is a protective device used in oil-filled transformers to detect and prevent faults.

    • It is a type of gas actuated relay

    • It is installed in the oil-filled transformer tank

    • It detects the presence of gas or air bubbles in the oil

    • It trips the transformer if a fault is detected

    • It helps to prevent major damage to the transformer

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Remain confident.
Stay positive.
Dont get panic.

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load calculation of Transformer
  • Ans. 

    Load calculation of Transformer

    • Load calculation involves determining the amount of power required by the load

    • Transformer rating should be higher than the calculated load

    • Load calculation takes into account factors such as power factor, efficiency, and voltage regulation

    • Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor

    • Example: If the load is 100 kW with a power factor of 0.8 and a voltag...

  • Answered by AI
  • Q2. Voltage Drop calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good. Learned good exposure from interview panel

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. El Signalling system working
  • Ans. 

    The El Signalling system is a railway signalling system used in Europe.

    • The system uses a combination of track circuits and signals to control train movements.

    • It was first introduced in the early 20th century and has since been updated and modernized.

    • The system is used in countries such as France, Spain, and Italy.

    • It allows for efficient and safe train operations on busy railway lines.

    • The system has faced some criticism

  • Answered by AI
  • Q2. Telecom system in Indian railways
  • Ans. 

    Indian Railways has a modern telecom system for efficient communication and safety.

    • Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.

    • GSM-R enables communication between train drivers and control centers.

    • Wi-Fi is available for passengers in select trains and stations.

    • CCTV surveillance ensures safety and security of passengers and railway property.

    • Indian Railways is also implementing a Train Collision Avoidance

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Signalling
Interview preparation tips for other job seekers - Positive attitude, domain knowledge, HR,

I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.Techinical questions about bridge construction,prestressed,cantilever,concrete,SAP,shuttering
  • Q2. 2.Site planning
  • Q3. 3. Why we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical & for manager role this is OK

I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Details asked about current working company, location, designation, work experience, nature of work, team handling capacity, expected CTC and required work location.
Round 2 - Technical 

(1 Question)

  • Q1. Details asked about previous work experience, nature of project handled, scope of work, technical details in Water treatment plant, intake, elevated reservoirs. Rate analysis, some typical rates for constr...

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice company with discipline. You love to work in this company as it's having its unique values.

Interview Questionnaire 

1 Question

  • Q1. What is the procedure for the welding of different materials
  • Ans. 

    The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.

    • Identify the materials to be welded and determine the compatibility of their properties.

    • Select the appropriate welding method based on the materials and desired joint strength.

    • Prepare the materials by cleaning, removing any contaminants, and en...

  • Answered by AI

I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Pure technical questions are asked.
  • Q2. Power transmission in transit mixer & operation of batching plant.
  • Ans. 

    Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.

    • Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.

    • The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.

    • The operation of the batching plant involves loading the ingredients into the hopper...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear about basic concepts & technical specifications of equipment

I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Basics about your past experience and metro related questions.
  • Q2. Metro related questions.
  • Q3. Tell me about yourself.?
  • Q4. EXPLAIN THE PILE TIME CYCLE?
  • Ans. 

    The pile time cycle is the time taken to complete a single pile driving operation.

    • It involves the driving of a pile into the ground using a pile driver.

    • The cycle includes lifting the hammer, dropping it onto the pile, and raising it again.

    • Factors affecting the cycle include the size and weight of the hammer, soil conditions, and the length of the pile.

    • The cycle time can be reduced by using a hydraulic hammer or pre-aug...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Mainly designation and salary related.

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Just past experience
Interview preparation tips for other job seekers - All the very best . It is growing infra company . So experience is more important
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Normal HR related questions.
Round 2 - Technical 

(1 Question)

  • Q1. Technical details of the past projects completed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to focus on details of past project completed.

Manager Interview Questions & Answers

KEC International user image SHIV CHARAN GUJRAL

posted on 10 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Basically on job profile and related experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Work knowledge and experience

Reliance Infrastructure Interview FAQs

What are the top questions asked in Reliance Infrastructure Supervisor interview?

Some of the top questions asked at the Reliance Infrastructure Supervisor interview -

  1. What are diff type of earthin...read more
  2. What are diff type of circuit breake...read more
  3. What is transforme...read more

Tell us how to improve this page.

Reliance Infrastructure Supervisor Salary
based on 7 salaries
₹1.8 L/yr - ₹5 L/yr
At par with the average Supervisor Salary in India
View more details

Reliance Infrastructure Supervisor Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

2.0

Salary

2.0

Job security

2.0

Company culture

1.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
112 salaries
unlock blur

₹3.9 L/yr - ₹12.8 L/yr

Deputy General Manager
75 salaries
unlock blur

₹14 L/yr - ₹36.6 L/yr

Senior Manager
74 salaries
unlock blur

₹9.1 L/yr - ₹24 L/yr

Manager
67 salaries
unlock blur

₹6.8 L/yr - ₹20.3 L/yr

General Manager
48 salaries
unlock blur

₹19 L/yr - ₹62.7 L/yr

Explore more salaries
Compare Reliance Infrastructure with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview