Reliance Infrastructure Manager Interview Questions and Answers

Updated 19 Jul 2024

Reliance Infrastructure Manager Interview Experiences

2 interviews found

Manager Interview Questions & Answers

user image Prabhav Mishra

posted on 19 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What are the methods of population projection, How to project population for water supply projects?
  • Ans. 

    Population projection methods include cohort-component, trend extrapolation, and expert opinion. For water supply projects, population can be projected based on historical data, demographic trends, and development plans.

    • Population projection methods: cohort-component, trend extrapolation, expert opinion

    • For water supply projects, project population based on historical data, demographic trends, development plans

    • Consider ...

  • Answered by AI
  • Q2. Methods of designing water distribution system and elevated service reservoirs
  • Ans. 

    Water distribution systems are designed using hydraulic principles to ensure efficient water supply to consumers. Elevated service reservoirs are designed to store and distribute water at higher elevations.

    • Water distribution systems are designed based on factors such as population served, water demand, topography, and available water sources.

    • Hydraulic calculations are used to determine pipe sizes, flow rates, and press...

  • Answered by AI

Manager Interview Questions & Answers

user image Anonymous

posted on 1 Mar 2021

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Accomodation and vechile facilities need .

Interview Preparation Tips

Interview preparation tips for other job seekers - In reliance they not give accommodation and vechile facilities to reach site. Only problem was a big problem. Company good

Manager Interview Questions Asked at Other Companies

Q1. There is a chairman of a conglomerate. He has been on the post fo ... read more
asked in Axis Bank
Q2. How will you convince a school secretary to open account with you ... read more
Q3. What are kpi's?which are the kpi we use in daily basis
asked in HDFC Bank
Q4. what is FDI ,procedure how to settle the fund & why FDI need ... read more
Q5. There is a steel company with 2 plants in India. Now it has done ... read more

Interview questions from similar companies

I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Pure technical questions are asked.
  • Q2. Power transmission in transit mixer & operation of batching plant.
  • Ans. 

    Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.

    • Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.

    • The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.

    • The operation of the batching plant involves loading the ingredients into the hopper...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear about basic concepts & technical specifications of equipment

I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.Techinical questions about bridge construction,prestressed,cantilever,concrete,SAP,shuttering
  • Q2. 2.Site planning
  • Q3. 3. Why we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical & for manager role this is OK

Manager Interview Questions & Answers

KEC International user image SHIV CHARAN GUJRAL

posted on 10 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Basically on job profile and related experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Work knowledge and experience

I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load calculation of Transformer
  • Ans. 

    Load calculation of Transformer

    • Load calculation involves determining the amount of power required by the load

    • Transformer rating should be higher than the calculated load

    • Load calculation takes into account factors such as power factor, efficiency, and voltage regulation

    • Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor

    • Example: If the load is 100 kW with a power factor of 0.8 and a voltag...

  • Answered by AI
  • Q2. Voltage Drop calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good. Learned good exposure from interview panel

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. El Signalling system working
  • Ans. 

    The El Signalling system is a railway signalling system used in Europe.

    • The system uses a combination of track circuits and signals to control train movements.

    • It was first introduced in the early 20th century and has since been updated and modernized.

    • The system is used in countries such as France, Spain, and Italy.

    • It allows for efficient and safe train operations on busy railway lines.

    • The system has faced some criticism

  • Answered by AI
  • Q2. Telecom system in Indian railways
  • Ans. 

    Indian Railways has a modern telecom system for efficient communication and safety.

    • Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.

    • GSM-R enables communication between train drivers and control centers.

    • Wi-Fi is available for passengers in select trains and stations.

    • CCTV surveillance ensures safety and security of passengers and railway property.

    • Indian Railways is also implementing a Train Collision Avoidance

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Signalling
Interview preparation tips for other job seekers - Positive attitude, domain knowledge, HR,

I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Basics about your past experience and metro related questions.
  • Q2. Metro related questions.
  • Q3. Tell me about yourself.?
  • Q4. EXPLAIN THE PILE TIME CYCLE?
  • Ans. 

    The pile time cycle is the time taken to complete a single pile driving operation.

    • It involves the driving of a pile into the ground using a pile driver.

    • The cycle includes lifting the hammer, dropping it onto the pile, and raising it again.

    • Factors affecting the cycle include the size and weight of the hammer, soil conditions, and the length of the pile.

    • The cycle time can be reduced by using a hydraulic hammer or pre-aug...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Mainly designation and salary related.

Interview Preparation Tips

Topics to prepare for KEC International Manager interview:
  • Just past experience
Interview preparation tips for other job seekers - All the very best . It is growing infra company . So experience is more important

I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Details asked about current working company, location, designation, work experience, nature of work, team handling capacity, expected CTC and required work location.
Round 2 - Technical 

(1 Question)

  • Q1. Details asked about previous work experience, nature of project handled, scope of work, technical details in Water treatment plant, intake, elevated reservoirs. Rate analysis, some typical rates for constr...

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice company with discipline. You love to work in this company as it's having its unique values.

Interview Questionnaire 

1 Question

  • Q1. What is the procedure for the welding of different materials
  • Ans. 

    The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.

    • Identify the materials to be welded and determine the compatibility of their properties.

    • Select the appropriate welding method based on the materials and desired joint strength.

    • Prepare the materials by cleaning, removing any contaminants, and en...

  • Answered by AI

Reliance Infrastructure Interview FAQs

How many rounds are there in Reliance Infrastructure Manager interview?
Reliance Infrastructure interview process usually has 1 rounds. The most common rounds in the Reliance Infrastructure interview process are One-on-one Round.
What are the top questions asked in Reliance Infrastructure Manager interview?

Some of the top questions asked at the Reliance Infrastructure Manager interview -

  1. What are the methods of population projection, How to project population for wa...read more
  2. Methods of designing water distribution system and elevated service reservo...read more
  3. Accomodation and vechile facilities need...read more

Tell us how to improve this page.

Reliance Infrastructure Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Reliance Infrastructure Manager Salary
based on 67 salaries
₹6.8 L/yr - ₹20.3 L/yr
25% less than the average Manager Salary in India
View more details

Reliance Infrastructure Manager Reviews and Ratings

based on 25 reviews

4.1/5

Rating in categories

4.0

Skill development

4.5

Work-life balance

4.4

Salary

3.7

Job security

4.4

Company culture

3.9

Promotions

3.8

Work satisfaction

Explore 25 Reviews and Ratings
Assistant Manager
112 salaries
unlock blur

₹3.9 L/yr - ₹12.8 L/yr

Deputy General Manager
75 salaries
unlock blur

₹14 L/yr - ₹36.6 L/yr

Senior Manager
74 salaries
unlock blur

₹9.1 L/yr - ₹24 L/yr

Manager
67 salaries
unlock blur

₹6.8 L/yr - ₹20.3 L/yr

General Manager
48 salaries
unlock blur

₹19 L/yr - ₹62.7 L/yr

Explore more salaries
Compare Reliance Infrastructure with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview