I was interviewed in Sep 2024.
Questions were basic and should have very clear and precise knowledge about the topics.
Inrush current is the high current drawn by an electrical device when it is first turned on.
Inrush current occurs when the impedance of the device is low at startup, causing a surge in current flow.
It can cause voltage drops, tripping of circuit breakers, and damage to components.
Common examples include when a motor starts up or when a power supply is turned on.
Symmetrical faults have balanced currents and voltages, while unsymmetrical faults have unbalanced currents and voltages.
Symmetrical faults have equal currents and voltages on all phases, such as three-phase short circuit faults.
Unsymmetrical faults have different currents and voltages on different phases, such as single-phase faults or line-to-ground faults.
Symmetrical faults are easier to analyze and protect against ...
I was interviewed in Jan 2025.
I am a motivated and dedicated individual with a passion for construction management.
I have a strong background in construction and project management.
I am detail-oriented and have excellent organizational skills.
I am a team player and have experience working with diverse teams.
I am always looking for opportunities to learn and grow in the field of construction management.
There are several types of support types used for piping fixing, including clamps, hangers, and anchors.
Clamps are used to hold pipes in place and prevent movement.
Hangers are used to support the weight of the pipes from above.
Anchors are used to secure pipes to a structure to prevent movement.
Other types of support types include guides, shoes, and struts.
I have extensive experience in planning, managing, and executing various activities related to piping material issues for contracts, fabrication, welding, inspection work, and mechanical completion in the construction industry.
Engaged in planning and managing piping material issues for contracts
Worked with materials such as carbon steel, alloy steel, stainless steel, and cast iron water pipelines
Provided services invol...
I was interviewed in Feb 2025.
Group discussion with HR.
What people are saying about Reliance Industries
I was interviewed in Feb 2025.
Erection and testing of transformers involves careful installation, connection, and verification of performance parameters.
1. Site Preparation: Ensure the foundation is level and capable of supporting the transformer weight.
2. Unloading: Use cranes or forklifts to safely unload the transformer from transport vehicles.
3. Positioning: Align the transformer with the designated installation area, ensuring proper clearance ...
Erecting a power panel involves careful planning, installation, and safety measures to ensure proper functionality and compliance.
1. Site Preparation: Ensure the installation site is clean, level, and free from obstructions.
2. Equipment Check: Verify that all components of the power panel are present and undamaged.
3. Mounting: Securely mount the panel to a wall or a dedicated structure using appropriate fasteners.
4. El...
Cable laying involves planning, installation, and securing cables for electrical systems, ensuring safety and efficiency.
Plan the route: Assess the area for obstacles and determine the most efficient path for the cables.
Select appropriate cables: Choose cables based on voltage, current capacity, and environmental conditions.
Use proper tools: Employ tools like cable pullers, trenchers, and splicing kits for effective in...
Generator rotor tests ensure the rotor's integrity and performance, crucial for reliable generator operation.
Visual Inspection: Check for physical damage, cracks, or corrosion on the rotor surface.
Insulation Resistance Test: Measure insulation resistance between rotor windings and ground using a megohmmeter.
Winding Resistance Test: Use a micro-ohmmeter to measure the resistance of rotor windings to ensure they are with...
Testing and commissioning of HT & LT panels ensure safety, reliability, and performance of electrical systems.
Visual Inspection: Check for physical damage, proper labeling, and cleanliness of the panel.
Insulation Resistance Testing: Use a megohmmeter to measure insulation resistance to ensure safety.
Functional Testing: Verify the operation of circuit breakers, relays, and other protective devices.
Voltage and Curren...
Reliance Industries interview questions for popular designations
I was interviewed in Feb 2025.
Get interview-ready with Top Reliance Industries Interview Questions
I applied via Company Website and was interviewed in Dec 2024. There were 4 interview rounds.
Denier doff shedule wise daily routine test, new pack change test, abnormal test. Denier change test. Special sample test daily schedule wise test following
Testing purpose group discussion and best quality this product and best opportunity
Denier doff shedule and new pack test and and PQC proper testing par shift wise follow up
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
General aptitude, basic Maths and English
The duration of Reliance Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 1.2k interviews
Interview experience
based on 16.1k reviews
Rating in categories
Manager
3.4k
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Executive
2.7k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
2.7k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
2.5k
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Adani Group
Hindustan Unilever
Bharti Enterprises