i
Reliance BP Mobility
Filter interviews by
Clear (1)
A project execution plan is a document that outlines how a project will be carried out, including timelines, resources, and responsibilities.
Defines project objectives and scope
Outlines project schedule and milestones
Identifies resources needed for the project
Assigns responsibilities to team members
Includes risk management strategies
Provides a framework for monitoring and controlling the project
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I have a strong technical background with expertise in software development, system architecture, and project management.
Extensive experience in software development using languages such as Java, Python, and C++
Proficient in system architecture design and implementation
Skilled in project management, including leading cross-functional teams and delivering projects on time and within budget
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
posted on 25 Mar 2023
Upper and lower yield refer to the stress values at which a material begins to deform plastically.
Upper yield is the stress value at which a material begins to deform plastically under increasing stress.
Lower yield is the stress value at which a material begins to deform plastically under decreasing stress.
These values are important in determining the strength and ductility of a material.
For example, if a material has ...
Toughness is the ability to withstand stress without breaking, while hardness is the ability to resist indentation or scratching.
Toughness is a measure of a material's ability to absorb energy before breaking or fracturing.
Hardness is a measure of a material's resistance to indentation or scratching.
Toughness is important in materials that are subjected to impact or shock loading, while hardness is important in materia...
posted on 18 Oct 2023
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 3 interview rounds.
Knowledge of the English language, its vocabulary and comprehension. Ability to solve basic mathematical problem, which shows the capacity to use an analytical approach to everyday puzzles.
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
Spare maintenance philosophy focuses on maintaining spare parts to minimize downtime and ensure efficient operations.
Spare maintenance philosophy aims to have a sufficient inventory of spare parts to quickly replace any faulty components.
It involves regular inspections and maintenance of spare parts to ensure their functionality and readiness.
The philosophy emphasizes proactive planning and forecasting to anticipate th...
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Well integrity and well barrier elements are crucial components in ensuring the safety and efficiency of oil and gas wells.
Well integrity refers to the ability of a well to contain fluids within the intended zones and prevent any leaks or failures.
Well barrier elements are physical or mechanical barriers that are put in place to prevent the escape of fluids from the wellbore.
Examples of well barrier elements include ca...
Upstream processes involve exploration, drilling, and production of oil and gas.
Exploration: Involves searching for potential oil and gas reserves using seismic surveys and other techniques.
Drilling: Once a potential reserve is identified, wells are drilled to extract the oil and gas.
Production: Oil and gas are extracted from the wells and processed for distribution.
Examples: Offshore drilling in the Gulf of Mexico, sh
No conflicts with supervisor or others.
I have not had any conflicts with my supervisor or colleagues.
I believe in open communication and resolving issues professionally.
I prioritize teamwork and collaboration to prevent conflicts from arising.
I applied via Company Website and was interviewed in Nov 2021. There were 4 interview rounds.
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
To identify if a pump is cavitating while working on a DCS panel, you can look for certain indicators.
Monitor the pump's suction pressure. If it is fluctuating or dropping below the specified range, it may indicate cavitation.
Check the pump's discharge pressure. If it is higher than normal, it could be a sign of cavitation.
Listen for unusual noises such as a rattling or grinding sound coming from the pump.
Inspect the p...
To prepare a hydrocarbon vessel for vessel entry, follow these steps:
Ensure the vessel is properly isolated from the process and all sources of energy
Ventilate the vessel to remove any flammable or toxic gases
Perform a thorough inspection of the vessel for any signs of leaks or damage
Implement proper lockout/tagout procedures to prevent accidental activation of equipment
Provide appropriate personal protective equipment...
based on 1 interview
Interview experience
Senior Manager
174
salaries
| ₹0 L/yr - ₹0 L/yr |
Network Development Manager
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Manager
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Representative
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager Sales & Operations
76
salaries
| ₹0 L/yr - ₹0 L/yr |
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum
Shell